Drive test Cluster,SSV from Functionality Test to Pre DT to Post DT until site is accepted by the operator using software like Tems Investigation,Probe Genex. Post process logs for analysis using Genex Assistant,Actix Analyzer and Map info. Site audit like azimuth, electrical and mechanical tilt and make site audit report.