Running cat-5 and terminating on patch panels, installing fiber, hubs, and cable racks in the M.D.F's. Also installed RJ45's and terminated on 66, and 110 blocks.
I'm also a Lineman on the construction end. Which include running hard lines, inner-duct, and fiber. Experienced in micro soft excel, and word. Experienced in microprocessors, electronic assembly, proper soldering technique. Ability to read schematics, and troubleshooting circuit boards. Utilization of PLC Technology.