Course :B-tech 1. NTPC DADRI Thermal power station duration 6 weeks . 2. NTPC DADRI Gas power station duration 6 weeks. Responsibility : Attend class room training of two days in which whole process was described from coal to steam, steam to energy ,electrical system. where 210 mw 4 unit rated terminal voltage 16.5 kv power generated from each unit is stepped up to 220 kv by a step up generator transformer .power from the 220 kv switchyard is stepped up to 400 kv by an auto transformer and then transmitted to northern region grid through suitable 400 kv line system. unit auxiliaries receives their normal power supplies at 6.6 kv through one UAT. For lower sized drives ,6.6 kv is furth...