 Work closely with DDC/DTO technical unit to perform the scheme level activities following the Step-by-step procedure of RVWRMP II.
 Support DDC/DTO on Survey, Design, Supervision, Monitoring and Evaluation Scheme and VDC level activities.
 Identification of urgent pilot WR activities during WUMP preparation.
 Carryout feasibility study of the identified scheme.
 Conduct detail survey, and prepare design and BOQ of the scheme
 Enhance capacity of technical persons of DDC/DTO, VDC and Local catalysts on implementation of water resources technologies/systems.
 Support to conduct village level technical training to LLB, VMW, RWHM and others
 Organize and conduct...