I have been working in the field of Tranmission line for the last 15 years. Since 1998 I gain extensive knowledge in the field of Transmission Line, Tower and Foundation design, project managment.
Being able to give solution in Tower Design, Line Survey, Tower Spotting, Foundation Design, Line routing, Conductor Calclations.
I have been responsible for the Transmission line design of more than 4000 km from aprox. 30 overhead transmission line projects ( 33, 66, 132, 154, 220, 330, 380 ,400, 500 KV ) in IRAQ; ALGERIA, SYRIA, LEBANON, MOROCCO, LIBYA, PERU, NIGERIA , TURKEY, ESTONYA, TURKMENSITAN and CANADA.
Specialties: - Transmission line Engineering
- Transmission Tower Design by...