1. Master Degree in Power systems Engineering with 3.6 years of Work Experience in Power sector
2. Work experience involves industrial sector such as Renewable and Power .
3. Experience of Wind Turbines installation and commissioning of 1MW.
4. Knowledge on Substation Design and Transmission line activities for EH V .
5. Project Work in M tech on 400kV EH V Substation at Nagothane division of Maharashtra State Electricity Co Ltd.
6. Effective use of ETAP Software for Design and simulation of on-line diagram of 400kV EH V Substation.
7. Load Flow Analysis,Motor Acceleration studies,Reliability Analysis Using ETAP and studied effective use of the software.
8. Types of tower structure...