際際滷shows by User: AshwinAnde / http://www.slideshare.net/images/logo.gif 際際滷shows by User: AshwinAnde / 際際滷Share feed for 際際滷shows by User: AshwinAnde https://cdn.slidesharecdn.com/profile-photo-AshwinAnde-48x48.jpg?cb=1523551718 Operation - - Shift In charge of 400/220 kV GIS substation which is connected to Western Grid through a 104 Km long 400 kV double circuit transmission line owned by ESSAR Power Transmission Company Ltd. - Responsible for compliance with Grid codes laid down by WRLDC ensuring Reliable, Safe & Economic operation of Grid. - Responsible for planning of Annual & Opportunity based shutdown of ICT's & 400 kV transmission line. - Responsible for co-ordination with WRLDC & NTPC for taking shut down & restoration of ICT's & 400 kV transmission line during planned & breakdown maintenance. - Preparation of Disturbance Report in case of tripping. - Ensuring healthiness of substation equipment's. -...