ºÝºÝߣshows by User: BidhuBihusansundaray / http://www.slideshare.net/images/logo.gif ºÝºÝߣshows by User: BidhuBihusansundaray / ºÝºÝߣShare feed for ºÝºÝߣshows by User: BidhuBihusansundaray https://cdn.slidesharecdn.com/profile-photo-BidhuBihusansundaray-48x48.jpg?cb=1653030137  Maintain Daily progress report.  Maintain Monthly progress report.  Maintain Strip chart, Bar chart  Study the drawing of structure BC, HPC, ROB, VUP, MNB(1 x 25), MNB(1 x 30) & Quantity rate calculation.  Reviewing Interim payment application and certifying the measurements under provision of contract.  Checking and updating the proposed work programme and methodology by contractor under provision of contract.  Reviewing and revising variation Order.  Making the monthly IPC.  Quantity calculation as per cross section.  Planning for further work.  Solve the technical problem coordination with Sr.QS and Resident Engineer.