際際滷shows by User: Fathimewafi / http://www.slideshare.net/images/logo.gif 際際滷shows by User: Fathimewafi / 際際滷Share feed for 際際滷shows by User: Fathimewafi https://cdn.slidesharecdn.com/profile-photo-Fathimewafi-48x48.jpg?cb=1695824336 --I am a chemist have 14 years experience in pre-commissioning , commissioning and startup of power plant projects (Oil fired thermal cycle, combined cycle, coal fired) and water treatment plants. - Responsible of all aspects of power projects chemistry such as Control the boiler chemistry, steam quality, cooling systems, wide range of auxiliaries & Environmental issues, related with O&M of power plant. -,revision of the design, construction supervision, pre-commissioning, commissioning, start up operation and shut down of water utilities such as Multi stage flashing desalination plants (MSF), Industrial waste water treatment plants WWTP, Fresh water treatment plants, Demineralization ...