ºÝºÝߣshows by User: MuhammadAsriLantiLal / http://www.slideshare.net/images/logo.gif ºÝºÝߣshows by User: MuhammadAsriLantiLal / ºÝºÝߣShare feed for ºÝºÝߣshows by User: MuhammadAsriLantiLal https://cdn.slidesharecdn.com/profile-photo-MuhammadAsriLantiLal-48x48.jpg?cb=1524901387 Having more than ten (10) years of experience in piping construction completion for Subsea, Oil & Gas and Shipbuilding industry. Following is the scope of work includes the codes, standards and rules are used: - Factory Acceptance Test (FAT) for Subsea Pipeline System, Tie-in Spools and Spool Jumper as per DNV-OS-F101, ASME B31.4 & ASME B31.8 – Current. - Factory Acceptance Test (FAT) for Aker Connectors (HCS/VCS) Porch-Termination & Pressure Caps (IB/OB, Temp/Permanent) as per Aker’s OMM – Current. - Factory Acceptance Test (FAT) for GE Connectors (HCCS) Porch-Termination & Pressure Caps as per GE’s OMM – Current. - Factory Acceptance Test (FAT) for Subsea Valves (Petrolvalves,