ºÝºÝߣshows by User: MuhammedIbrahim / http://www.slideshare.net/images/logo.gif ºÝºÝߣshows by User: MuhammedIbrahim / ºÝºÝߣShare feed for ºÝºÝߣshows by User: MuhammedIbrahim https://cdn.slidesharecdn.com/profile-photo-MuhammedIbrahim-48x48.jpg?cb=1725254104 Key Responsibilities:- • Reviewing the tender documents / contract conditions / scope of works for the contract sign off. • Preparation of Interim claims for the project. •Interim Cash Flow Reports Preparation. • Measurement of Mechanical, Electrical and Plumbing Construction Drawings. • Preparation of Bills of Quantities. • Notifying the design changes / clarifications instructed by the client through Construction Change Directive (CCD). • Evaluating the VD/RFI/EOT issued by the engineer and notifying the engineer / client regarding the cost / time implication • Preparation of Budgetary / Final Cost for the newly introduced system / Variations. • Final Account Claim fo...