ºÝºÝߣshows by User: OsasuvbenAiyudu / http://www.slideshare.net/images/logo.gif ºÝºÝߣshows by User: OsasuvbenAiyudu / ºÝºÝߣShare feed for ºÝºÝߣshows by User: OsasuvbenAiyudu https://cdn.slidesharecdn.com/profile-photo-OsasuvbenAiyudu-48x48.jpg?cb=1523541418 Project Engineer/Design Engineer Projects Executed: 1. Pile foundation supervision of a two (2) span concrete bridge project at Ikom, Cross-River Stat; accomplished in two (2) months- (sixty (60) piles: April 2010 – May 2010). 2. Integrated Roof Truss Design of Greater Evangelism World Crusade (GEWC), HQ, Port Harcourt, Rivers; accomplished in six (6) weeks- (November 2008 – December 2009). 3. Comprehensive Design of Bonny Integrated Complex Shell Project (retaining walls, sheet piles and other ancillary structures), Bonny, Rivers; we accomplished in two (2) weeks- (October 2009). http://www.vistasng.com