際際滷shows by User: nicodemefeuwo / http://www.slideshare.net/images/logo.gif 際際滷shows by User: nicodemefeuwo / Tue, 21 Feb 2017 16:11:18 GMT 際際滷Share feed for 際際滷shows by User: nicodemefeuwo Gas lift design /nicodemefeuwo/gas-lift-design gasliftdesign-170221161118
This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. ]]>

This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. ]]>
Tue, 21 Feb 2017 16:11:18 GMT /nicodemefeuwo/gas-lift-design nicodemefeuwo@slideshare.net(nicodemefeuwo) Gas lift design nicodemefeuwo This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. <img style="border:1px solid #C3E6D8;float:right;" alt="" src="https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221161118-thumbnail.jpg?width=120&amp;height=120&amp;fit=bounds" /><br> This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the &quot;plunger lift &quot; system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of&quot; fallback &quot; thus increase the production of our wells.
Gas lift design from Nicodeme Feuwo
]]>
13066 20 https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221161118-thumbnail.jpg?width=120&height=120&fit=bounds presentation Black http://activitystrea.ms/schema/1.0/post http://activitystrea.ms/schema/1.0/posted 0
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (Case Study of a Real Wells in In Am辿nas-Algeria) /slideshow/gas-lift-design-comparative-study-of-continuous-and-intermittent-gas-lift-case-study-of-a-real-wells-in-in-amnasalgeria/72418127 gasliftdesign-170221160013
This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. ]]>

This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. ]]>
Tue, 21 Feb 2017 16:00:13 GMT /slideshow/gas-lift-design-comparative-study-of-continuous-and-intermittent-gas-lift-case-study-of-a-real-wells-in-in-amnasalgeria/72418127 nicodemefeuwo@slideshare.net(nicodemefeuwo) Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (Case Study of a Real Wells in In Am辿nas-Algeria) nicodemefeuwo This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the "plunger lift " system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of" fallback " thus increase the production of our wells. <img style="border:1px solid #C3E6D8;float:right;" alt="" src="https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221160013-thumbnail.jpg?width=120&amp;height=120&amp;fit=bounds" /><br> This document was produced as part of my final year project of training to obtain a petroleum engineering diploma. The aim of this project is to make a comparative study between continuous and intermittent gas lift systems based on real data from an oil well in Algeria, and to choose the system best suited to increase the production of the well. This study was carried out by a manual design using the method of fixed pressure drop for the continuous gas lift system and fallback gradient method for intermittent gas lift system. We were able to determine at the end of this study that the system best suited to the current conditions of our well would be the intermittent gas lift system and we also proposed that it should be combine with the &quot;plunger lift &quot; system in order to increase the efficiency of the intermittent gas lift system by eliminating problems linked to the phenomenon of&quot; fallback &quot; thus increase the production of our wells.
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (Case Study of a Real Wells in In Am辿nas-Algeria) from Nicodeme Feuwo
]]>
5472 11 https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221160013-thumbnail.jpg?width=120&height=120&fit=bounds presentation Black http://activitystrea.ms/schema/1.0/post http://activitystrea.ms/schema/1.0/posted 0
CONTRIBUTION DE LA GEOPHYSIQUE A LA CARACTERISATION DES FORMATIONS SUPERFICIELLES DU SECTEUR NORD DE YAOUNDE : CAS DE LA ZONE SPORTIVE DOLEMBEe master https://fr.slideshare.net/slideshow/contribution-de-la-geophysique-a-la-caracterisation-des-formations-superficielles-du-secteur-nord-de-yaounde-cas-de-la-zone-sportive-dolembee-master/15269030 prsentationmemoiremaster-121120130358-phpapp02
]]>

]]>
Tue, 20 Nov 2012 13:03:54 GMT https://fr.slideshare.net/slideshow/contribution-de-la-geophysique-a-la-caracterisation-des-formations-superficielles-du-secteur-nord-de-yaounde-cas-de-la-zone-sportive-dolembee-master/15269030 nicodemefeuwo@slideshare.net(nicodemefeuwo) CONTRIBUTION DE LA GEOPHYSIQUE A LA CARACTERISATION DES FORMATIONS SUPERFICIELLES DU SECTEUR NORD DE YAOUNDE : CAS DE LA ZONE SPORTIVE DOLEMBEe master nicodemefeuwo <img style="border:1px solid #C3E6D8;float:right;" alt="" src="https://cdn.slidesharecdn.com/ss_thumbnails/prsentationmemoiremaster-121120130358-phpapp02-thumbnail.jpg?width=120&amp;height=120&amp;fit=bounds" /><br>
from Nicodeme Feuwo
]]>
4546 7 https://cdn.slidesharecdn.com/ss_thumbnails/prsentationmemoiremaster-121120130358-phpapp02-thumbnail.jpg?width=120&height=120&fit=bounds presentation Black http://activitystrea.ms/schema/1.0/post http://activitystrea.ms/schema/1.0/posted 0
https://cdn.slidesharecdn.com/profile-photo-nicodemefeuwo-48x48.jpg?cb=1561728753 https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221161118-thumbnail.jpg?width=320&height=320&fit=bounds nicodemefeuwo/gas-lift-design Gas lift design https://cdn.slidesharecdn.com/ss_thumbnails/gasliftdesign-170221160013-thumbnail.jpg?width=320&height=320&fit=bounds slideshow/gas-lift-design-comparative-study-of-continuous-and-intermittent-gas-lift-case-study-of-a-real-wells-in-in-amnasalgeria/72418127 Gas Lift Design: Compa... https://cdn.slidesharecdn.com/ss_thumbnails/prsentationmemoiremaster-121120130358-phpapp02-thumbnail.jpg?width=320&height=320&fit=bounds slideshow/contribution-de-la-geophysique-a-la-caracterisation-des-formations-superficielles-du-secteur-nord-de-yaounde-cas-de-la-zone-sportive-dolembee-master/15269030 CONTRIBUTION DE LA GEO...