際際滷shows by User: ocanolle / http://www.slideshare.net/images/logo.gif 際際滷shows by User: ocanolle / Thu, 14 Mar 2013 09:19:33 GMT 際際滷Share feed for 際際滷shows by User: ocanolle SBB Study Case Northern Ireland Electricity Limited (NIE) - The Challenge /slideshow/sbb-study-case-nie-the-challenge/17200074 sbbstudycaseniethechallenge-130314091933-phpapp01
Northern Ireland Electricity (NIE) had a project of adding a new substation to an existing 275 kV double-circuit power line. This project included the erection of 2 new terminal towers to serve the new substation. Since the terminal towers would be erected in-line with the existing 275 kV power line, the main challenge was to .nd a cost effective way to by-pass the whole 300 metre long construction site with a temporary line without affecting the power flow. ]]>

Northern Ireland Electricity (NIE) had a project of adding a new substation to an existing 275 kV double-circuit power line. This project included the erection of 2 new terminal towers to serve the new substation. Since the terminal towers would be erected in-line with the existing 275 kV power line, the main challenge was to .nd a cost effective way to by-pass the whole 300 metre long construction site with a temporary line without affecting the power flow. ]]>
Thu, 14 Mar 2013 09:19:33 GMT /slideshow/sbb-study-case-nie-the-challenge/17200074 ocanolle@slideshare.net(ocanolle) SBB Study Case Northern Ireland Electricity Limited (NIE) - The Challenge ocanolle Northern Ireland Electricity (NIE) had a project of adding a new substation to an existing 275 kV double-circuit power line. This project included the erection of 2 new terminal towers to serve the new substation. Since the terminal towers would be erected in-line with the existing 275 kV power line, the main challenge was to .nd a cost effective way to by-pass the whole 300 metre long construction site with a temporary line without affecting the power flow. <img style="border:1px solid #C3E6D8;float:right;" alt="" src="https://cdn.slidesharecdn.com/ss_thumbnails/sbbstudycaseniethechallenge-130314091933-phpapp01-thumbnail.jpg?width=120&amp;height=120&amp;fit=bounds" /><br> Northern Ireland Electricity (NIE) had a project of adding a new substation to an existing 275 kV double-circuit power line. This project included the erection of 2 new terminal towers to serve the new substation. Since the terminal towers would be erected in-line with the existing 275 kV power line, the main challenge was to .nd a cost effective way to by-pass the whole 300 metre long construction site with a temporary line without affecting the power flow.
SBB Study Case Northern Ireland Electricity Limited (NIE) - The Challenge from SBB Towers
]]>
318 3 https://cdn.slidesharecdn.com/ss_thumbnails/sbbstudycaseniethechallenge-130314091933-phpapp01-thumbnail.jpg?width=120&height=120&fit=bounds document Black http://activitystrea.ms/schema/1.0/post http://activitystrea.ms/schema/1.0/posted 0
Alumnium Modular Tower /slideshow/alumnium-modular-tower/5327190 t1676sbbfeuilletv4-12858789588773-phpapp01
]]>

]]>
Thu, 30 Sep 2010 15:36:23 GMT /slideshow/alumnium-modular-tower/5327190 ocanolle@slideshare.net(ocanolle) Alumnium Modular Tower ocanolle <img style="border:1px solid #C3E6D8;float:right;" alt="" src="https://cdn.slidesharecdn.com/ss_thumbnails/t1676sbbfeuilletv4-12858789588773-phpapp01-thumbnail.jpg?width=120&amp;height=120&amp;fit=bounds" /><br>
Alumnium Modular Tower from SBB Towers
]]>
265 4 https://cdn.slidesharecdn.com/ss_thumbnails/t1676sbbfeuilletv4-12858789588773-phpapp01-thumbnail.jpg?width=120&height=120&fit=bounds presentation Black http://activitystrea.ms/schema/1.0/post http://activitystrea.ms/schema/1.0/posted 0
https://cdn.slidesharecdn.com/profile-photo-ocanolle-48x48.jpg?cb=1666078246 SBB emergency towers (ERS Towers) are modular towers made of aluminium that can be quickly deployed to restore power on damaged transmission lines of up to 1200 kV. They require no heavy equipment, no concrete foundations, and a team of only 6 linemen working for a few hours. They are also great alternatives as telecom towers and/or wind measurement towers for remote sites and/or extreme climate sites. www.sbb.ca https://cdn.slidesharecdn.com/ss_thumbnails/sbbstudycaseniethechallenge-130314091933-phpapp01-thumbnail.jpg?width=320&height=320&fit=bounds slideshow/sbb-study-case-nie-the-challenge/17200074 SBB Study Case Norther... https://cdn.slidesharecdn.com/ss_thumbnails/t1676sbbfeuilletv4-12858789588773-phpapp01-thumbnail.jpg?width=320&height=320&fit=bounds slideshow/alumnium-modular-tower/5327190 Alumnium Modular Tower