狠狠撸

狠狠撸Share a Scribd company logo
8D REPORT
A Step by Step Problem Solving Process
Written by: Siu Wai Au
ASQ CSSBB, CQA, CMQ/OE, LBC-Sensei, PMP
1
DOCUMENTATIONDOCUMENTATION
2
Document Detail
Case Number:
Case Title:
Opened Date:
Prepared by:
Reviewed by:
Closed Date:
Verified by:
Approved by:
D1: Team Formation 建立團隊
D2: Problem Description 問題描述
D3: Immediate Action 即時行動
D4: Root Cause Analysis 原因分析
D5: Corrective Action 糾正行動
D6: Implement and Validate 執行及驗證
D7: Prevention 預防措施
D8: Closure 總結
3
TABLE OF CONTENTTABLE OF CONTENT
? Name 1, Process Engineer, Leader
? Name 2, Project Manager
? Name 3, Electrical Engineer
? Name 4, Electrical Engineer
? Name 5, Quality Engineer
? Name 6 , Production Officer
A cross-functional team shall be formed in order to tackle the problem, the team should include
subject matter expert (who has relevant process knowledge), as well as the people who familiar with
the problem solving tools.
4
D1: TEAM FORMATIOND1: TEAM FORMATION 建立建立 團隊團隊
DateDate
發生日期發生日期
LocationLocation
發生地點發生地點 // 場所場所
ProcessProcess
制程制程
CustomerCustomer
客戶客戶
Product P/NProduct P/N
品產品產
Failure RateFailure Rate
不良率不良率
OwnerOwner
責任人責任人
Problem StatementProblem Statement
問題陳述問題陳述
ImpactImpact
影响影响
Specify the problem by identifying in quantifiable terms the who, what, where, when, why, how, and how many
(5W2H) for the problem.
5
D2: PROBLEMD2: PROBLEM DESCRIPTIONDESCRIPTION 問題描述問題描述
D2: PROBLEM DESCRIPTIOND2: PROBLEM DESCRIPTION 問題描述問題描述
Illustrate the problem with Defects Pictures / Flow Chart / Process Mapping / Pareto Chart
according to its nature.
6
D3D3
D3 Guideline
7
Risk AssessmentRisk AssessmentRisk AssessmentRisk Assessment
Understanding of
the Problem
Defective Rate
Stop Ship / Stop Build
Decision
Containment Action(s)
Immediate Actions
Traceability Data
AffectedAffected
P/NP/N
Stop ShipStop Ship DateDate
ResumeResume
DateDate
Stop BuildStop Build DateDate
Resume
Date
D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動
8
Stop Build / Stop Ship
Decide whether stop ship / stop build is required
WhereWhere How ManyHow Many DefectivesDefectives What to doWhat to do WhenWhen
WIP - Shop Floor
FG - Store
Materials - Store
Hubs/ In Transit
Field
End Customer
D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動
9
Containment Actions
To prevent these problem / defectives from reaching the customer.
D4D4
D4 Guideline
5-Why5-Why
Cause & Effect DiagramCause & Effect Diagram
Pareto ChartPareto Chart
IPO AnalysisIPO Analysis
FMEAFMEA
Fault Tree AnalysisFault Tree Analysis
Statistical MethodStatistical Method
5-Why5-Why
Cause & Effect DiagramCause & Effect Diagram
Pareto ChartPareto Chart
IPO AnalysisIPO Analysis
FMEAFMEA
Fault Tree AnalysisFault Tree Analysis
Statistical MethodStatistical Method
Team Knowledge
Process Mapping
Process Parameter
Detection Cause(s)
Systemic Cause(s)
Direct Root Cause(s)
Root Causes Analysis
(RCA)
Traceability Data
10
D4 Guideline
Definition
11
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
5-Why Analysis 五次為甚麼
Drilling down into a problem, digging out the root cause
WHY?
WHY?
WHY?
WHY?
Cause of the Problem
Cause of the 1st
Cause
Cause of the 2nd
Cause
Cause of the 3rd
Cause
Cause of the 4th
Cause
ProblemProblem
WHY?
12
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
Cause & Effect Diagram 因果圖
Brainstorm all the possible causes of the problem, circle the critical & controllable items
ManMan
MaterialMaterialMeasureMeasure
PROBLEMPROBLEM
MethodMethod
MachineMachineEnvironmentEnvironment
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
13
Input Process Output
14
Input-Process-Output (IPO) Analysis
Identify all possible causes of the problem by listing all the input parameters throughout the processes
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
TypeType Item#Item# Root CausesRoot Causes
Root Cause
(Failure Mode)
1
2
Detection 3
4
Systemic 5
6
15
Conclusion of RCA
D5D5
D5 Guideline
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklistDetection Cause(s)
Direct Root Cause(s)
Generation of Corrective Actions
Corrective Actions
16
D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動
17
Benefit-Effort Matrix
Brainstorm all the possible SOLUTIONS, select the best solution(s) base on the cost-effectiveness.
BENEFIT
EFFORT
? werwe
? ewrew
? ewrew
? erwe
? 2fedv
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動
Base on the root causes identified, list the corrective actions that are able to eliminate the root
causes permanently. The corrective actions must be feasible and cost-effective.
18
Root
Cause #
Corrective Action(s) % Effect
Est. Completion
Date
Owner
1
D6D6
D6 Guideline
Hypothesis TestsHypothesis Tests
Data Collection FormsData Collection Forms
Hypothesis TestsHypothesis Tests
Data Collection FormsData Collection Forms
Sampling Method
Deployed Corrective
Actions
Implement & Validation Process
Validated Corrective
Actions
19
New Process
Sample Size
Acceptance Criteria
Results
D6: IMPLEMENT & VALIDATED6: IMPLEMENT & VALIDATE 執行及驗證執行及驗證
After the corrective actions are implemented, verify the result to determine the effectiveness of the
actions taken.
SamplingSampling
MethodMethod
Sample SizeSample Size CriteriaCriteria
Est.Est.
CompletionCompletion
DateDate
ResultResult Criteria Met?Criteria Met?
20
D7: PREVETION 預防措施D7D7
D7 Guideline
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
Control ChartsControl Charts
FMEAFMEA
Control PlanControl Plan
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
Control ChartsControl Charts
FMEAFMEA
Control PlanControl Plan
Systemic Causes
Weakness of
Management System
Preventive Actions
Control Plan
21
New Procedure /
Policies
History of Similar
Cases
Corrective Actions
D7: PREVETIOND7: PREVETION 預防措施預防措施
If there are systemic cause identified, modification of the management systems, operation systems,
practices, MI, and procedures might required to prevent recurrence of this and all similar problems.
22
RootRoot
Cause #Cause #
Preventive ActionsPreventive Actions % Effect% Effect
Est. CompletionEst. Completion
DateDate
OwnerOwner
D8: CLOSURED8: CLOSURE 總結總結
State the conclusion, why the project can be closed like what are the objectives achieved, what is gained
and in what extent, give your lesson learned, and explore the possibility of horizontal deployment.
23
24
ATTACHMENTATTACHMENT

More Related Content

8D Problem Solving Report Template with Guidance

  • 1. 8D REPORT A Step by Step Problem Solving Process Written by: Siu Wai Au ASQ CSSBB, CQA, CMQ/OE, LBC-Sensei, PMP 1
  • 2. DOCUMENTATIONDOCUMENTATION 2 Document Detail Case Number: Case Title: Opened Date: Prepared by: Reviewed by: Closed Date: Verified by: Approved by:
  • 3. D1: Team Formation 建立團隊 D2: Problem Description 問題描述 D3: Immediate Action 即時行動 D4: Root Cause Analysis 原因分析 D5: Corrective Action 糾正行動 D6: Implement and Validate 執行及驗證 D7: Prevention 預防措施 D8: Closure 總結 3 TABLE OF CONTENTTABLE OF CONTENT
  • 4. ? Name 1, Process Engineer, Leader ? Name 2, Project Manager ? Name 3, Electrical Engineer ? Name 4, Electrical Engineer ? Name 5, Quality Engineer ? Name 6 , Production Officer A cross-functional team shall be formed in order to tackle the problem, the team should include subject matter expert (who has relevant process knowledge), as well as the people who familiar with the problem solving tools. 4 D1: TEAM FORMATIOND1: TEAM FORMATION 建立建立 團隊團隊
  • 5. DateDate 發生日期發生日期 LocationLocation 發生地點發生地點 // 場所場所 ProcessProcess 制程制程 CustomerCustomer 客戶客戶 Product P/NProduct P/N 品產品產 Failure RateFailure Rate 不良率不良率 OwnerOwner 責任人責任人 Problem StatementProblem Statement 問題陳述問題陳述 ImpactImpact 影响影响 Specify the problem by identifying in quantifiable terms the who, what, where, when, why, how, and how many (5W2H) for the problem. 5 D2: PROBLEMD2: PROBLEM DESCRIPTIONDESCRIPTION 問題描述問題描述
  • 6. D2: PROBLEM DESCRIPTIOND2: PROBLEM DESCRIPTION 問題描述問題描述 Illustrate the problem with Defects Pictures / Flow Chart / Process Mapping / Pareto Chart according to its nature. 6
  • 7. D3D3 D3 Guideline 7 Risk AssessmentRisk AssessmentRisk AssessmentRisk Assessment Understanding of the Problem Defective Rate Stop Ship / Stop Build Decision Containment Action(s) Immediate Actions Traceability Data
  • 8. AffectedAffected P/NP/N Stop ShipStop Ship DateDate ResumeResume DateDate Stop BuildStop Build DateDate Resume Date D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動 8 Stop Build / Stop Ship Decide whether stop ship / stop build is required
  • 9. WhereWhere How ManyHow Many DefectivesDefectives What to doWhat to do WhenWhen WIP - Shop Floor FG - Store Materials - Store Hubs/ In Transit Field End Customer D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動 9 Containment Actions To prevent these problem / defectives from reaching the customer.
  • 10. D4D4 D4 Guideline 5-Why5-Why Cause & Effect DiagramCause & Effect Diagram Pareto ChartPareto Chart IPO AnalysisIPO Analysis FMEAFMEA Fault Tree AnalysisFault Tree Analysis Statistical MethodStatistical Method 5-Why5-Why Cause & Effect DiagramCause & Effect Diagram Pareto ChartPareto Chart IPO AnalysisIPO Analysis FMEAFMEA Fault Tree AnalysisFault Tree Analysis Statistical MethodStatistical Method Team Knowledge Process Mapping Process Parameter Detection Cause(s) Systemic Cause(s) Direct Root Cause(s) Root Causes Analysis (RCA) Traceability Data 10
  • 12. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 5-Why Analysis 五次為甚麼 Drilling down into a problem, digging out the root cause WHY? WHY? WHY? WHY? Cause of the Problem Cause of the 1st Cause Cause of the 2nd Cause Cause of the 3rd Cause Cause of the 4th Cause ProblemProblem WHY? 12
  • 13. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 Cause & Effect Diagram 因果圖 Brainstorm all the possible causes of the problem, circle the critical & controllable items ManMan MaterialMaterialMeasureMeasure PROBLEMPROBLEM MethodMethod MachineMachineEnvironmentEnvironment ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 13
  • 14. Input Process Output 14 Input-Process-Output (IPO) Analysis Identify all possible causes of the problem by listing all the input parameters throughout the processes D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
  • 15. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 TypeType Item#Item# Root CausesRoot Causes Root Cause (Failure Mode) 1 2 Detection 3 4 Systemic 5 6 15 Conclusion of RCA
  • 16. D5D5 D5 Guideline BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklistDetection Cause(s) Direct Root Cause(s) Generation of Corrective Actions Corrective Actions 16
  • 17. D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動 17 Benefit-Effort Matrix Brainstorm all the possible SOLUTIONS, select the best solution(s) base on the cost-effectiveness. BENEFIT EFFORT ? werwe ? ewrew ? ewrew ? erwe ? 2fedv ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
  • 18. D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動 Base on the root causes identified, list the corrective actions that are able to eliminate the root causes permanently. The corrective actions must be feasible and cost-effective. 18 Root Cause # Corrective Action(s) % Effect Est. Completion Date Owner 1
  • 19. D6D6 D6 Guideline Hypothesis TestsHypothesis Tests Data Collection FormsData Collection Forms Hypothesis TestsHypothesis Tests Data Collection FormsData Collection Forms Sampling Method Deployed Corrective Actions Implement & Validation Process Validated Corrective Actions 19 New Process Sample Size Acceptance Criteria Results
  • 20. D6: IMPLEMENT & VALIDATED6: IMPLEMENT & VALIDATE 執行及驗證執行及驗證 After the corrective actions are implemented, verify the result to determine the effectiveness of the actions taken. SamplingSampling MethodMethod Sample SizeSample Size CriteriaCriteria Est.Est. CompletionCompletion DateDate ResultResult Criteria Met?Criteria Met? 20
  • 21. D7: PREVETION 預防措施D7D7 D7 Guideline BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist Control ChartsControl Charts FMEAFMEA Control PlanControl Plan BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist Control ChartsControl Charts FMEAFMEA Control PlanControl Plan Systemic Causes Weakness of Management System Preventive Actions Control Plan 21 New Procedure / Policies History of Similar Cases Corrective Actions
  • 22. D7: PREVETIOND7: PREVETION 預防措施預防措施 If there are systemic cause identified, modification of the management systems, operation systems, practices, MI, and procedures might required to prevent recurrence of this and all similar problems. 22 RootRoot Cause #Cause # Preventive ActionsPreventive Actions % Effect% Effect Est. CompletionEst. Completion DateDate OwnerOwner
  • 23. D8: CLOSURED8: CLOSURE 總結總結 State the conclusion, why the project can be closed like what are the objectives achieved, what is gained and in what extent, give your lesson learned, and explore the possibility of horizontal deployment. 23