CONSTRUCTED LANDSCAPE
ENBE FEB0214 INTAKE
FINAL PROJECT
NAME: NG KHENG SOON (0318946)
KIING KIU CHUN (0318727)
SHAM ZHEN WEN (0317733)
LAU CHIN SHENG (0317899)
INTRODUCTION
The aim of the project is to introduce students to Landscape Project
from ideas stage to completion. Students will have basic exposure to
concept, analysis, master plan, costing, planting plan, construction
and maintenance. Student will be given a small site within campus to
study and apply the anatomy of project accordingly.
This project is to help students to understand basic landscape
architecture drawings as a means of communication and
representation of ideas.
Part 1: Presentation board
Preparing 2 A2 presentation boards which contain:
-Concept and Master Plan ¨C A2 board
-Planting Plan ¨C A2 board
Part 2: Green Space Proposer Report
Preparing a report which consist the following criteria:
- Introduction
- Site analysis
- Concept
- Master Plan
- Planting Plan
- Costing
- 2 construction details
- Maintenance Plan
SITE ANALYSIS
The picture above shown our site. The site is located at Block E
Basement, a 10mx10m place which beside the basement car park.
The picture show the site analysis of the site. Both arrows are
pointed the site. Red dot lines indicated the human circulation of the
site. Small blue colour arrows indicated the wind blow direction. The
red arrow to deep blue arrow show the sun path from early morning
to night.
CONCEPT
The major reason that we chose our current site is because lack of
hardscape. After the group discussion, we decided to add open space
concept to our site. For example, discussion table sets are added to
our site, and also green element like bamboo and some plants are
added to our site to improve it.
¡°Nature, Leisure, Countempory design.¡±
MASTER PLAN
PLANTING PLAN
PERSPECTIVE DRAWING
COSTING: BILL OF QUANTITY
Item Unit Quantity Rate Amount
Cut stone Pavement m? 12.88 RM350.00 RM4,508.00
Wood Pavement m? 48 RM400.00 RM19,200.00
Table set No 3 RM1,613.00 RM4,839.00
Wooden fancing m 33.5 RM22.50 RM753.75
Bamboo No 72 RM40.00 RM2,880.00
Bungur Tree No 1 RM400.00 RM400.00
Pine tree No 2 RM400.00 RM800.00
Buttercup No 12 RM4.75 RM57.00
Hibiscus No 8 RM90.00 RM720.00
Benches No 4 RM1,900.00 RM7,600.00
Dustbin No 1 RM420.00 RM420.00
Hole excavation
For trees No 3 RM30.00 RM90.00
For shrubs No 92 RM10.00 RM920.00
Maintenance month RM1,644.00 RM1,644.00
Sub-total RM44,831.75
Add Preliminaries 5% RM2,241.59
Add Contingencies 10% RM4,483.18
Total RM51,556.51
MAINTENANCE PLAN
Maintenance cost Amount
? Labour cost
1. 3 laborers @ RM 50/day x 4 times a month RM600.00
2. 1 supervisor @RM70/day x 4 times a month RM70.00
3. Transport-1 lorry @ RM100/day x 4 times a month RM400.00
? Material cost
1. Fertiliser; once a month RM100.00
2. Pest control, once a month RM100.00
3. Replacing dead plants RM100.00
Sub-total RM1,370.00
? Add Profit & overhead 20% RM274.00
Total RM1,644.00
CONSTRUCTION DETAILS:
Wooden fencing construction detail.
Construction detail drawing of cut stone slab on sand bed base.
References:
http://www.ehow.com/list_7224184_different-types-bamboo-
plants_.html
http://www.bhg.com/gardening/trees-shrubs-
vines/shrubs/bamboo-plants-for-the-garden/
https://times.taylors.edu.my/pluginfile.php/1723665/mod_resour
ce/content/1/Construction%2C%20maintenance%20and%20Costin
g%20%28part%20II%29.pdf
https://times.taylors.edu.my/pluginfile.php/1723662/mod_resour
ce/content/1/Construction%2C%20maintenance%20and%20Costin
g%20%28Part%20I%29.pdf
https://times.taylors.edu.my/pluginfile.php/1723659/mod_resour
ce/content/1/PLANT%20PALETTE%20and%20COSTING%20master.p
df
http://www.ikea.com/my/en/catalog/products/S19932228/
http://www.wellgrowhorti.com/Page/Lands
capePlants/ShrubList/Shrub%20List%20A.ht
m
http://bamboogarden.com/care.htm
http://gardendiscoveries.blogspot.com/2012
/06/yellow-daylilies.html
http://mygardendirectory.blogspot.com/201
1/12/buying-christmas-trees-and-pine-
trees.html
Cl final project