1. Combining SCADA Data and LiDAR to
Rectify Under Performance
WIND PROSPECT OPERATIONS
Reducing the Cost of Energy
Date: Oct 2016 | Author: KDA | Checked: DLE| Approved: BRO | Version: 3.3 | disclosure: commercial in confidence
Safe | Reliable | Fit-for-Purpose
2. Highlights
Established 2008,
70 staff in 24 offices or service points
#1 independent third-party asset
manager in France, UK & Ireland.
1.9 GW across 5 countries
616+ wind turbines (1,484 MW)
200+ solar PV plants (464 MWp)
100+ project companies
1,000+ site inspections p.a.
Wind Prospect Operations
Disclosure notice: commercial in confidence
4. Data analysis
Data analysis objectives
Optimise
asset
performance
Prevent majors
failures
Find asset issues
before the
maintenance
company
4
5. Real case : Performance analysis
Sonic anemometer (FT)
exchange between turbine
7 and 8
From 2015-05 to 2015-10 :
Turbine 7 is the one of the best performing turbines, its p
Turbine 8 is 5th performer of the site
From 2015-10 to 2016-06 :
Turbine 7 performance dramatically decreased
Turbine 8 performance improved
Turbine 7
Turbine 8
Turbine 9
Turbine 10
Turbine 11
Turbine 12
6. ALLA-05 and ALLA-08 temperature
higher than the other since
commissioning
Real case : Bearing failure
7. ALLA-05 generator bearing failure and replacement (19/09/2015).
Significant drop of the temperature while ALLA-08 remain really
high.
Real case : Bearing failure
8. • How much could have been saved :
– Hypothesis :
• 2 weeks before generator replacement.
• 30 % capacity factor
• 80 €/MWh
– Actual downtime : 8 days.
– Total downtime : 528 hrs. (8 days + 2 weeks)
– Production loss : 475 200 kW/h
– Revenue loss : €38k / £32K
Real case : Bearing failure
10. Presentation of the measurement
WPO developed a fully independent measurement system based on a two-beam
nacelle LiDAR and a specially developed real time data-logger.
The systems acquire the following values (1Hz sampling rate):
• Lidar radial Wind Speed
• Lidar relative direction
• Lidar tilt
• Lidar roll
• Lidar status
• Turbine power
• Ambient temperature
• Ambient pressure
• Ambient humidity
• Nacelle orientation
10
11. Lidar Power performance campaign
• Campaign objectives
– Accurately and independently measure the turbine power curve.
– Measure the turbine misalignment : yaw error.
12. Lidar Power performance options
• Depending on the customer needs 2 options are available:
– Option 1 : yaw error estimation, correction and validation.
• Installation and set up of the Lidar (≈ 1 day) ;
• Daily monitoring of the system and yaw measurement trends during the first phase (≈ 15
days*) ;
• Yaw correction recommendation ;
• Technical recommendation ;
• Daily monitoring of the system and the yaw measurement trends during the second phase
(≈ 15 days*);
– Option 2 : yaw error estimation, correction, validation and
operational power curve before and after correction.
• Installation and set up of theWind Iris Lidar (≈ 1 day) ;
• Daily monitoring of the system and yaw measurement trends + operational power curve
including air density correction during the first phase (≈ 30 days*) ;
• Yaw correction recommendation ;
• Technical recommendation ;
• Daily monitoring of the system and yaw measurement trends + operational power curve
including air density correction during the second phase (≈ 30 days*) ;
*Time is wind condition dependant.
13. Campaign example of results
The nacelle anemometer is showing a
very poor power curve
Comparison of the nacelle anemometer
and the Lidar shows a very good
correlation but indicates that the sonic
anemometer is overestimating the wind
speed.
13
14. Campaign example of results
This could be explained by the overestimation of wind speed measured by the
nacelle anemometer.The transfer function may need to be adjusted on this
turbine. Discussion are engaged with the wind turbine manufacturer
A power curve based on the Lidar data is better than the guaranteed power curve up
to 10 m/s and then under it.
14
15. Conclusion
• Various techniques can be used to identify and explain
performance issues. These can be applied one after the
other or in parallel.
• WPO strongly advises to begin with a data analysis study to
identify underperforming turbines.
• Once the underperforming turbines are identified and if the
data analysis does not provide answers then a Lidar
campaign is required to further investigate.
17. Asset Management Services
Single-entry desk for turnkey operations
Disclosure notice: commercial in confidence
17
Continuous Monitoring & Control
24/7 pro-active performance monitoring
Close follow-up with O&Ms & service providers
Data Acquisition, Storage,Analysis &
Reporting
Safe & regular storage of all SCADA data
Detailed technical & performance analysis
Regular & appropriate reporting
Data-sharing with clients
Site & HSE Management
Active HSE,WTSR & ICPE implementation
Regular & expert site inspections & audits
Statutory inspection compliance
Continuous review of all site maintenance activities
Commercial & Contracts
Management
Costumer Representative for all O&M Contracts
PPA, GCA and Land Lease Administration
Warranty & Insurance Claims Management
Public Relations
Procurement & appointment of third party providers
Financial Management &
Administration
Validation & management of all expenditure payments & revenue receipts
Monthly & Quarterly reporting
Maintain all financial records & provide audited accounts
Bank/Investor liaison & facility agreement compliance
Debt facility management
Corporate
Directorship
Company Secretarial
18. Legal
Review
Financial
Review
Energy
Production
Assessment
Technology
Review
Technology Review
o Site layout;
o Site inspection;
o Technology suitability;
o Equipment Review.
1
Energy Production Assessment
Review and opinion on:
o Measured data from the site;
o Long-term yield characteristics ;
o Expected net annual production;
o Uncertainty in the results.
Financial Review
Review of:
o Capital expenditures (contingencies);
o Operation & maintenance costs;
o Land lease & insurance costs;
o Grid connection costs.
Legal Review
Review of:
o Licences and permitting;
o Building permit, planning consent;
o Grid Connection agreement;
o EPC, TSA, BoP, O&M & TCM contracts.
2
34
1
2
34
Advisory &Transaction Services
The leading independent technical advisor on wind & solar projects
Wind Prospect has advised on 80 GW of renewable projects
Disclosure notice: commercial in confidence
18
19. Commissioning & Take-Over
Moving your asset into operations
……………………………………………...
 Documentary review (FCW, ARMMF)
 Run-tests analysis
 Complete visual inspection
 Civil works inspection
 Electrical infrastructure inspection
 Acceptance & take-over certificate
 Preparation of punch-list
Technical Audit & Site Inspections
Assessing the condition of your equipment
……………………………………………….
Wind:
 Tower, hub and nacelle inspection
 Electrical and mechanical thermography
 Video-endoscopy of gearbox
 Blade inspections
 Generator inspection
Solar:
 Thermography of electronic components
 Performance control of the solar panels
Power Curve Test by LIDAR
Assessing your asset performance
…………………………………………
 System supply
 Installation and commissioning
 Survey monitoring
 Data analysis
 Technical recommendations
 Activation of O&M process
 Training courses for technical users
Market leaders in detailed technical site inspections and analysis
We conduct over 1,000 wind and solar site inspections a year
Technical Audit Services
Disclosure notice: commercial in confidence