際際滷

際際滷Share a Scribd company logo
Jul 29, 2013
*
*Problem: I have been hired to re-design the
students lockers at a large public high school.
What Process would I use to tackles this
project?
*First: Find out about the facility  size of area,
dimensions, design of facility
*Second: Interview staff/administrators to find
out their ideas and interest for the new space
*Third: Ascertain the budget and timeline for
the project
*Third: Research companies and products that
manufacture high school lockers
*Fourth: Research costs of manufactured lockers
versus custom made lockers
*Fifth: Produce a few prototypes of what the
design and materials could look like at various
cost points (within budget)
*Sixth: Gain feedback from staff and students
on the new potential designs
*Seven: Whittle down the list of prospective
designs to the most liked based on feedback
*Eight: Put together a final budget for the re-
design
*Nine: Develop project plan to complete the
deconstruction and re-construction of the
lockers
*Ten: Determine if the work must be done in
waves, so that some lockers are always
available and how many lockers must be
available in the interim period of construction
*Eleven: Find a contractor  check references
*Twelve: Secure contract between school and
contractor
*Thirteen: Oversee the project during
construction.

More Related Content

Similar to Design thinking challenge1 redesign lockers (20)

Lockers2.0 - Assignment from course on design thinking
Lockers2.0 - Assignment from course on design thinkingLockers2.0 - Assignment from course on design thinking
Lockers2.0 - Assignment from course on design thinking
Nikos Palavitsinis, PhD
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
MylhyneMercelitaLuis
Project brief
Project briefProject brief
Project brief
Eelyn Cheong
GRD753 Project Presentation of the working model.pptx
GRD753 Project Presentation of the working model.pptxGRD753 Project Presentation of the working model.pptx
GRD753 Project Presentation of the working model.pptx
NavneelRam2
GENN001 Fall2013 Session #8 Problem Solving
GENN001 Fall2013 Session #8 Problem SolvingGENN001 Fall2013 Session #8 Problem Solving
GENN001 Fall2013 Session #8 Problem Solving
Esmail Bialy
The Case Problem (Experimental) Model.pptx
The Case Problem (Experimental) Model.pptxThe Case Problem (Experimental) Model.pptx
The Case Problem (Experimental) Model.pptx
SHAHEENPARVEEN56
7.REKABENTUK INSTRUKSI untuk pelajar.pptx
7.REKABENTUK INSTRUKSI untuk pelajar.pptx7.REKABENTUK INSTRUKSI untuk pelajar.pptx
7.REKABENTUK INSTRUKSI untuk pelajar.pptx
MOHAMADFAUZIAHMAD2
Materials Science and Engineering Introduction
Materials Science and Engineering IntroductionMaterials Science and Engineering Introduction
Materials Science and Engineering Introduction
JonathanRaphael7
Case Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docxCase Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docx
zebadiahsummers
Op4 outline : review
Op4 outline : reviewOp4 outline : review
Op4 outline : review
Simha Bode
Project Name
 Project Name                                       Project Name
Project Name
TatianaMajor22
From industry to academia: user-centred design driving library service innova...
From industry to academia: user-centred design driving library service innova...From industry to academia: user-centred design driving library service innova...
From industry to academia: user-centred design driving library service innova...
LIBER Europe
School Facilities & Learning Designs
School Facilities & Learning Designs School Facilities & Learning Designs
School Facilities & Learning Designs
Jana Bou Reslan
Delta Beacon Time Capsule
Delta Beacon Time CapsuleDelta Beacon Time Capsule
Delta Beacon Time Capsule
Tim淡 Ronan
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
ArchiLab 7
ch05.ppt
ch05.pptch05.ppt
ch05.ppt
NesrudinIbnAbdulmeli
Engineering design process
Engineering design processEngineering design process
Engineering design process
Kawaldeep Singh
The 2nd g and the project work support doc mars 2015
The 2nd g and the project work  support doc mars 2015The 2nd g and the project work  support doc mars 2015
The 2nd g and the project work support doc mars 2015
Mr Bounab Samir
Lesson 8. Higher Thinking Skills Through I.T- Based Projects
Lesson 8. Higher Thinking Skills Through I.T- Based ProjectsLesson 8. Higher Thinking Skills Through I.T- Based Projects
Lesson 8. Higher Thinking Skills Through I.T- Based Projects
ailyn amrinto
Lesson 8: Higher Thinking Skills Through I.T. based-projects
Lesson 8: Higher Thinking Skills Through I.T. based-projectsLesson 8: Higher Thinking Skills Through I.T. based-projects
Lesson 8: Higher Thinking Skills Through I.T. based-projects
Novelyn Dela Cruz
Lockers2.0 - Assignment from course on design thinking
Lockers2.0 - Assignment from course on design thinkingLockers2.0 - Assignment from course on design thinking
Lockers2.0 - Assignment from course on design thinking
Nikos Palavitsinis, PhD
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
Culminating Activity week 3- Writing a Concept on the Prepared Plan and Gener...
MylhyneMercelitaLuis
GRD753 Project Presentation of the working model.pptx
GRD753 Project Presentation of the working model.pptxGRD753 Project Presentation of the working model.pptx
GRD753 Project Presentation of the working model.pptx
NavneelRam2
GENN001 Fall2013 Session #8 Problem Solving
GENN001 Fall2013 Session #8 Problem SolvingGENN001 Fall2013 Session #8 Problem Solving
GENN001 Fall2013 Session #8 Problem Solving
Esmail Bialy
The Case Problem (Experimental) Model.pptx
The Case Problem (Experimental) Model.pptxThe Case Problem (Experimental) Model.pptx
The Case Problem (Experimental) Model.pptx
SHAHEENPARVEEN56
7.REKABENTUK INSTRUKSI untuk pelajar.pptx
7.REKABENTUK INSTRUKSI untuk pelajar.pptx7.REKABENTUK INSTRUKSI untuk pelajar.pptx
7.REKABENTUK INSTRUKSI untuk pelajar.pptx
MOHAMADFAUZIAHMAD2
Materials Science and Engineering Introduction
Materials Science and Engineering IntroductionMaterials Science and Engineering Introduction
Materials Science and Engineering Introduction
JonathanRaphael7
Case Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docxCase Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docx
zebadiahsummers
Op4 outline : review
Op4 outline : reviewOp4 outline : review
Op4 outline : review
Simha Bode
From industry to academia: user-centred design driving library service innova...
From industry to academia: user-centred design driving library service innova...From industry to academia: user-centred design driving library service innova...
From industry to academia: user-centred design driving library service innova...
LIBER Europe
School Facilities & Learning Designs
School Facilities & Learning Designs School Facilities & Learning Designs
School Facilities & Learning Designs
Jana Bou Reslan
Delta Beacon Time Capsule
Delta Beacon Time CapsuleDelta Beacon Time Capsule
Delta Beacon Time Capsule
Tim淡 Ronan
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
Dorst, kees and cross, nigel (2001): creativity in the design process co evol...
ArchiLab 7
Engineering design process
Engineering design processEngineering design process
Engineering design process
Kawaldeep Singh
The 2nd g and the project work support doc mars 2015
The 2nd g and the project work  support doc mars 2015The 2nd g and the project work  support doc mars 2015
The 2nd g and the project work support doc mars 2015
Mr Bounab Samir
Lesson 8. Higher Thinking Skills Through I.T- Based Projects
Lesson 8. Higher Thinking Skills Through I.T- Based ProjectsLesson 8. Higher Thinking Skills Through I.T- Based Projects
Lesson 8. Higher Thinking Skills Through I.T- Based Projects
ailyn amrinto
Lesson 8: Higher Thinking Skills Through I.T. based-projects
Lesson 8: Higher Thinking Skills Through I.T. based-projectsLesson 8: Higher Thinking Skills Through I.T. based-projects
Lesson 8: Higher Thinking Skills Through I.T. based-projects
Novelyn Dela Cruz

Design thinking challenge1 redesign lockers

  • 2. *Problem: I have been hired to re-design the students lockers at a large public high school. What Process would I use to tackles this project?
  • 3. *First: Find out about the facility size of area, dimensions, design of facility *Second: Interview staff/administrators to find out their ideas and interest for the new space *Third: Ascertain the budget and timeline for the project *Third: Research companies and products that manufacture high school lockers *Fourth: Research costs of manufactured lockers versus custom made lockers *Fifth: Produce a few prototypes of what the design and materials could look like at various cost points (within budget) *Sixth: Gain feedback from staff and students on the new potential designs
  • 4. *Seven: Whittle down the list of prospective designs to the most liked based on feedback *Eight: Put together a final budget for the re- design *Nine: Develop project plan to complete the deconstruction and re-construction of the lockers *Ten: Determine if the work must be done in waves, so that some lockers are always available and how many lockers must be available in the interim period of construction *Eleven: Find a contractor check references *Twelve: Secure contract between school and contractor *Thirteen: Oversee the project during construction.