際際滷

際際滷Share a Scribd company logo
FieldJointofCementlinedPipe
FireWaterLine
FieldJointofCementlinedPipe
FireWaterLine
PreparedByV.Johnson Prabu
Stages
 Mixingofcoatingmaterial
 Surfacepreparation
 Application
 Jointfitup
 Welding
 Testing
PreparedByV.JohnsonPrabu
CoatingMaterial
SINMAST
 SINMASTjoiningcompoundisusedfor
bondingcementlinedpipingcomponents.
 Sinmast isa2component,solventfree
productbasedonEpoxyResins
 ComponentA Resin(0.945kg)
 ComponentB Hardener(Ethylamine,
Isopropylideendifenol)(0.055kg)
PreparedByV.JohnsonPrabu
Coatingmaterial
 ComponentA
 ComponentB
PreparedByV.JohnsonPrabu
CoatingMaterial
Mixing
 BothcomponentA&Bmixedtogether
 Toavoidwastageitcanbedividedinto10
partsanduseitasrequired.
 Thepotlifeofmixedcomponentis25min@
20oCapprox.(WorkingTime)
 Thehardeningtimeis8hrs@20oCapprox.
PreparedByV.Johnson Prabu
CoatingMaterial
Mixing
 ComponentA
Totalweight =945gm
1/10part =94.5gm
PreparedByV.JohnsonPrabu
CoatingMaterial
Mixing
 UsuallyOnefullcapofthecanisequalto1/10
part.(Measureitbeforemixingandconform)
PreparedByV.JohnsonPrabu
CoatingMaterial
Mixing
PreparedByV.JohnsonPrabu
SurfacePreparation
 Thematingsteelsurfaceshallbefreefromoil,
rust,bursandotherforeignmaterial.
PreparedByV.JohnsonPrabu
Application
 Applythemixedcoatingmaterialgentily on
thesleevesideatanangleof45oapprox.
 Removetheexcessmaterial.
 Thejointhematingsurfaceandapplyslight
pressure.(usuallyafterjoiningyoucanfind
3mmdifference)
PreparedByV.JohnsonPrabu
Application
PreparedByV.JohnsonPrabu
JointFitup
PreparedByV.JohnsonPrabu
JointFitup
 Onlytackweldthejointatthreelocations
 Remember:Jointshallbeweldafter12hrs
PreparedByV.JohnsonPrabu
Welding
 Donotmovethejointafterfitup.
 Supportthelineadequatelytorestrictthe
movement.
 After12hrs (ie;hardeningtimeofcoating
material)thejointisreadyforwelding.
PreparedByV.JohnsonPrabu
Welding
 NowthejointisreadyforFurtherTesting
PreparedByV.JohnsonPrabu
Thankyou!
PreparedByV.JohnsonPrabu

More Related Content

Field Joint of Cement lined Pipe