際際滷

際際滷Share a Scribd company logo
PROFIL PERUSAHAAN




                          8 OKTOBER 2012
   PENDAHULUAN          Akuntansi Manajerial


                 JOB ORDER COSTING
                     LULU MAGHFURO (251201004)
                     MOKH. AFIFUDDIN (2512205005)
                                                    PENGAMBILAN DAN
                                                      PENGOLAHAN
                                                         DATA
METODOLOGI PENELITIAN


                                  ANALISIS DAN
        KESIMPULAN             INTERPRETASI DATA
                                                                1
PENDAHULUAN



         LATAR BELAKANG

UKM                     Kondisi Saing




PEMESANAN              Manajemen
KEAKURATAN PENENTUAN    Keuangan
  HARGA


                                        2
PENDAHULUAN



     RUMUSAN MASALAH


 HARGA AWAL     JOB ORDER
                 COSTING
 PEMESANAN
                     :
                PERHITUNGAN
                   AKTUAL


                              3
PENDAHULUAN



                 TUJUAN
   Merancang perhitungan pesanan
   menggunakan metode Job Order Costing

   Mengetahui perbandingan hasil antara
   metode Job Order Costing dengan kondisi aktual



              MANFAAT
   Bahan masukan UKM dalam penentuan HPP
                                                    4
PENDAHULUAN


                  BATASAN
   Objek amatan penelitian adalah CV Alam Karya Utama


      Produk amatan adalah rombong Sego NJamoer


                     ASUMSI
    Tidak terjadi perubahan signifikan pada proses bisnis




                                                            5
PROFIL PERUSAHAAN



                          SEJARAH
    CV Alam Karya
                                      Rombong
                                      Kitchen Set

   Permintaan             Kepuasan
                          Pelanggan      Bermula Dari Pesanan


15 rombong/ bulan                         10 orang
3-4 kitchen set/ bulan                     pekerja


                                                               6
PROFIL PERUSAHAAN



Sumber Daya




                              7
FLOW CHART




                              8
METODOLOGI PENELITIAN
BOM TREE




         PENGAMBILAN
       &PENGOLAHAN DATA   9
BOM
  Level 0     Level 1      Level 2      Level 3
                        Kerangka     Kerangka besi
            Kerangka    dasar        Roda
                        Tiang besi
                                    Multiplex
                        Badan Utama
                                    Melamin
            Badan                   Multiplex
Rombong     Rombong                 Melamin
                        Pintu
                                    Sekrup
                                    Engsel
                                    Multiplex
            Atap                    Melamin
            Rombong                 Hiasan
                                    Tambahan

                                  PENGAMBILAN
                                                     10
                                &PENGOLAHAN DATA
OPC




        PENGAMBILAN
                         11
      &PENGOLAHAN DATA
Biaya Bahan Baku (DM)
No           Material           Kebutuhan Harga / unit    Harga Total    Keterangan
1    Tiang besi (t= 50 cm, d=     2 buah    Rp   20.000   Rp   40.000
     3 cm, tebal= 0,5 cm)
2    Multiplex (p= 200 cm, l=    4 lembar   Rp   130.000 Rp    520.000
     40 cm)
3    Kerangka besi dan roda     1 perangkat Rp   300.000 Rp    300.000   Outsource
4    Melamin (pelapis)           5 lembar   Rp    85.000 Rp    425.000




                                                    PENGAMBILAN
                                                                              12
                                                  &PENGOLAHAN DATA
Biaya Bahan Baku (IDM)
No        Material         Kebutuhan         Harga / unit   Harga Total
1    Lem Fox 600 gram        1 kaleng        Rp   35.000    Rp   35.000
2    Sekrup             1 gross = 150 buah   Rp     1.750   Rp     1.750
3    Cat                3 warna @ 1 kaleng   Rp   35.000    Rp  105.000
4    Amplas                  5 lembar        Rp     2.500   Rp   12.500
5    Engsel Pintu            6 pasang        Rp     5.000   Rp   30.000




                                               PENGAMBILAN
                                                                      13
                                             &PENGOLAHAN DATA
Biaya Tenaga Kerja (Labor)
                                                                       Penyelesaian 1
       Nama                                         Gaji Borongan (1
No                       Job Description                                 Rombong        Hourly Rate
      Pekerja                                          rombong)
                                                                           (hari)
                  Proses Pertukangan (pengukuran,
1    Bpk Asep                                       Rp    357.143,00                    Rp 14.880,96
                  pemotongan dan penggabungan)
                                                                             3
                  Proses Pertukangan (pengukuran,
2    Bpk Budi                                       Rp    357.143,00                    Rp 14.880,96
                  pemotongan dan penggabungan)
                  Proses Penghalusan, Pemasangan
3    Bpk Prapto                                     Rp    178.572,00         2          Rp 11.160,75
                         Engsel (Serabutan)
4    Bpk Karyo      Proses Pengecatan, Finishing    Rp    250.000,00         3          Rp 10.416,67



     Biaya Overhead Pabrik(Labor)
                    Listrik rata-rata sebesar Rp. 200.000,00

                                                              PENGAMBILAN
                                                                                             14
                                                            &PENGOLAHAN DATA
Materials Requisition Form M1
                             Dunia Rombong Materials Requisition Form

Requisition No.        :   M1                               Date   :        02-Okt-12
Job No.                :   A1

                  Description                    Quantity    Unit Cost       Total Cost
Tiang besi (t= 50 cm, d= 3 cm, tebal= 0,5 cm)     2 buah    Rp     20.000    Rp 40.000
Total                                                                       Rp 40.000
                           Autorized
                                                CV Alam Karya
                           Signature            utama


                                                        PENGAMBILAN
                                                                                   15
                                                      &PENGOLAHAN DATA
Materials Requisition Form M2
                           Dunia Rombong Materials Requisition Form



Requisition No.        : M2                             Date          :   02-Okt-12
Job No.                : A1


                  Description                Quantity     Unit Cost        Total Cost
Multiplex (p= 200 cm, l= 40 cm, t = 12 mm)   3 lembar   Rp     130.000     Rp 390.000
Multiplex (p= 100 cm, l= 40 cm, t = 12 mm)      2       Rp      65.000    Rp 130.000
Total                                                                     Rp 520.000
                          Autorized
                          Signature          CV Alam Karya utama




                                                      PENGAMBILAN
                                                                                  16
                                                    &PENGOLAHAN DATA
Materials Requisition Form M3
                      Dunia Rombong Materials Requisition Form    
                                                                       


Requisition No.     : M3                             Date       :       02-Okt-12
Job No.             : A1
                                                                       
              Description               Quantity      Unit Cost         Total Cost
Kerangka besi dan roda                 1 perangkat   Rp   300.000       Rp 300.000
Total                                                                   Rp 300.000

                      Autorized
                    Signature        CV Alam Karya utama                 


                                                 PENGAMBILAN
                                                                                17
                                               &PENGOLAHAN DATA
Materials Requisition Form M4

                              Dunia Rombong Materials Requisition Form           
                                                                                  
Requisition No.        : M4                                  Date          :       02-Okt-12
Job No.                : A1
                                                                                  

                  Description                    Quantity      Unit Cost               Total Cost
Melamin (pelapis) warna putih                    5 lembar     Rp    85.000             Rp 425.000
Total                                                                                  Rp 425.000
                        Autorized
                     Signature              CV Alam Karya utama                     




                                                          PENGAMBILAN
                                                                                            18
                                                        &PENGOLAHAN DATA
Employee Time Ticket




              PENGAMBILAN
                               19
            &PENGOLAHAN DATA
Manufacturing Overhead Cost
Kebutuhan Listrik

Kebutuhan listrik 1 (satu bulan)   = Rp 200.000
Kebutuhan listrik 1 produk         =


Kebutuhan listrik 1 bulan          =



                                PENGAMBILAN
                                                  20
                              &PENGOLAHAN DATA
Manufacturing Overhead Cost
Bahan Baku Tidak Langsung

No        Material         Kebutuhan         Harga / unit   Harga Total
1    Lem Fox 600 gram        1 kaleng        Rp   35.000    Rp   35.000
2    Sekrup             1 gross = 150 buah   Rp     1.750   Rp     1.750
3    Cat                3 warna @ 1 kaleng   Rp   35.000    Rp  105.000
4    Amplas                  5 lembar        Rp     2.500   Rp   12.500
5    Engsel Pintu            6 pasang        Rp     5.000   Rp   30.000
                          Total                             Rp 184.250




                                               PENGAMBILAN
                                                                           21
                                             &PENGOLAHAN DATA
Manufacturing Overhead Cost
Jumlah Jam Kerja dalam 1 Produk

 Dihitungberdasarkanharikerjadikalikandengan
 jamkerjastandarharian.

 Jamkerja    =8harix8jam
               =64jam




                                      PENGAMBILAN
                                                       22
                                    &PENGOLAHAN DATA
Manufacturing Overhead Cost
Perhitungan POHR

            Budgeted manufacturing-overhead cost
POHR =
         Budgeted amount of cost driver (or activity base)




                                    PENGAMBILAN
                                                         23
                                  &PENGOLAHAN DATA
Job Order Cost Sheet
                            Dunia Rombong Job-Cost Shee t

Job No.  : A1                                                Date Initiated 02/10/2012
                                                                             :
Job Name : Rombong Sego N'Jamoer                             Date Completed 07/10/2012
                                                                             :

    Direct Materials               Direct Labor          Manufacturing Overhe ad
 Req. No      Amount     Ticke t Jam Kerja    Amount     Hours Rate Amount
M1          Rp    40.000    1        8      Rp   119.048    8    3191 Rp25.528
M2         Rp 520.000       2        8      Rp   119.048    8    3191 Rp25.528
M3         Rp 300.000       3        8      Rp   119.048    8    3191 Rp25.528
M4         Rp 425.000       4        8      Rp   119.048    8    3191 Rp25.528
                            5        8      Rp   119.048    8    3191 Rp25.528
                            6        8      Rp   119.048    8    3191 Rp25.528
                            7        8      Rp    89.286    8    3191 Rp25.528
                            8        8      Rp    89.286    8    3191 Rp25.528
                            9        8      Rp    83.333    8    3191 Rp25.528
                           10        8      Rp    83.333    8    3191 Rp25.528
                           11        8      Rp    83.333    8    3191 Rp25.528
Total      Rp 1.285.000             88      Rp 1.142.858   88    35101 Rp280.808

                         Cost Sumary
Direct Materials                             Rp 1.285.000
Direct Labor                                 Rp 1.142.858
Manufacturing Overhead                       Rp    280.808
Total Cost                                   Rp 2.708.666
Unit Cost                                    Rp 2.708.666

                                                          PENGAMBILAN                    24
                                                        &PENGOLAHAN DATA
Perhitungan Job Order Costing

     Tipe/Karakteristik   Nilai POHR
         Pesanan




               ANALISIS &              25
           INTERPRETASI DATA
Perbandingan Hasil Job Order
Costing dengan Perhitungan Aktual

            PERHITUNGAN AKTUAL
            1 unit rombong Sego NJamoer senilai Rp 5.300.000

JOB ORDER COSTING
1 unit rombong Sego NJamoer membutuhkan biaya produksi Rp 2.708.666.

                       KEUNTUNGAN
           Rp 2.591.334 = 48,9 % HARGA PRODUK



                         ANALISIS &                                26
                     INTERPRETASI DATA
KESIMPULAN
     1. Job Order Costing merupakan sistem kalkulasi biaya
        berdasarkan pesanan, dimana biaya yang dikumpulkan
        akan dibebankan ke unit produksi.

     2. Berdasarkan hasil perhitungan yang telah diuraikan
        sebelumnya maka didapat hasil perhitungan 1 unit
        rombong Sego NJamoer membutuhkan biaya produksi
         Rp 2.708.666.
         Dimana sebagai perbandingan, 1 unit rombong
         Sego NJamoer dijual senilai Rp 5.300.000.



KESIMPULAN & SARAN                                       27
SARAN
          Pengklasifikasian tipe/karakteristik pesanan
        rombong dengan POHR. Hal ini ditujukan untuk
         menyederhanakan dan memudahkan proses
     perhitungan kebutuhan biaya produksi menggunakan
                  metode Job Order Costing.




KESIMPULAN & SARAN                                       28
DOKUMENTASI KUNJUNGAN
Terima Kasih
 Terima Kasih



          30

More Related Content

Job oredr costing

  • 1. PROFIL PERUSAHAAN 8 OKTOBER 2012 PENDAHULUAN Akuntansi Manajerial JOB ORDER COSTING LULU MAGHFURO (251201004) MOKH. AFIFUDDIN (2512205005) PENGAMBILAN DAN PENGOLAHAN DATA METODOLOGI PENELITIAN ANALISIS DAN KESIMPULAN INTERPRETASI DATA 1
  • 2. PENDAHULUAN LATAR BELAKANG UKM Kondisi Saing PEMESANAN Manajemen KEAKURATAN PENENTUAN Keuangan HARGA 2
  • 3. PENDAHULUAN RUMUSAN MASALAH HARGA AWAL JOB ORDER COSTING PEMESANAN : PERHITUNGAN AKTUAL 3
  • 4. PENDAHULUAN TUJUAN Merancang perhitungan pesanan menggunakan metode Job Order Costing Mengetahui perbandingan hasil antara metode Job Order Costing dengan kondisi aktual MANFAAT Bahan masukan UKM dalam penentuan HPP 4
  • 5. PENDAHULUAN BATASAN Objek amatan penelitian adalah CV Alam Karya Utama Produk amatan adalah rombong Sego NJamoer ASUMSI Tidak terjadi perubahan signifikan pada proses bisnis 5
  • 6. PROFIL PERUSAHAAN SEJARAH CV Alam Karya Rombong Kitchen Set Permintaan Kepuasan Pelanggan Bermula Dari Pesanan 15 rombong/ bulan 10 orang 3-4 kitchen set/ bulan pekerja 6
  • 8. FLOW CHART 8 METODOLOGI PENELITIAN
  • 9. BOM TREE PENGAMBILAN &PENGOLAHAN DATA 9
  • 10. BOM Level 0 Level 1 Level 2 Level 3 Kerangka Kerangka besi Kerangka dasar Roda Tiang besi Multiplex Badan Utama Melamin Badan Multiplex Rombong Rombong Melamin Pintu Sekrup Engsel Multiplex Atap Melamin Rombong Hiasan Tambahan PENGAMBILAN 10 &PENGOLAHAN DATA
  • 11. OPC PENGAMBILAN 11 &PENGOLAHAN DATA
  • 12. Biaya Bahan Baku (DM) No Material Kebutuhan Harga / unit Harga Total Keterangan 1 Tiang besi (t= 50 cm, d= 2 buah Rp 20.000 Rp 40.000 3 cm, tebal= 0,5 cm) 2 Multiplex (p= 200 cm, l= 4 lembar Rp 130.000 Rp 520.000 40 cm) 3 Kerangka besi dan roda 1 perangkat Rp 300.000 Rp 300.000 Outsource 4 Melamin (pelapis) 5 lembar Rp 85.000 Rp 425.000 PENGAMBILAN 12 &PENGOLAHAN DATA
  • 13. Biaya Bahan Baku (IDM) No Material Kebutuhan Harga / unit Harga Total 1 Lem Fox 600 gram 1 kaleng Rp 35.000 Rp 35.000 2 Sekrup 1 gross = 150 buah Rp 1.750 Rp 1.750 3 Cat 3 warna @ 1 kaleng Rp 35.000 Rp 105.000 4 Amplas 5 lembar Rp 2.500 Rp 12.500 5 Engsel Pintu 6 pasang Rp 5.000 Rp 30.000 PENGAMBILAN 13 &PENGOLAHAN DATA
  • 14. Biaya Tenaga Kerja (Labor) Penyelesaian 1 Nama Gaji Borongan (1 No Job Description Rombong Hourly Rate Pekerja rombong) (hari) Proses Pertukangan (pengukuran, 1 Bpk Asep Rp 357.143,00 Rp 14.880,96 pemotongan dan penggabungan) 3 Proses Pertukangan (pengukuran, 2 Bpk Budi Rp 357.143,00 Rp 14.880,96 pemotongan dan penggabungan) Proses Penghalusan, Pemasangan 3 Bpk Prapto Rp 178.572,00 2 Rp 11.160,75 Engsel (Serabutan) 4 Bpk Karyo Proses Pengecatan, Finishing Rp 250.000,00 3 Rp 10.416,67 Biaya Overhead Pabrik(Labor) Listrik rata-rata sebesar Rp. 200.000,00 PENGAMBILAN 14 &PENGOLAHAN DATA
  • 15. Materials Requisition Form M1 Dunia Rombong Materials Requisition Form Requisition No. : M1 Date : 02-Okt-12 Job No. : A1 Description Quantity Unit Cost Total Cost Tiang besi (t= 50 cm, d= 3 cm, tebal= 0,5 cm) 2 buah Rp 20.000 Rp 40.000 Total Rp 40.000 Autorized CV Alam Karya Signature utama PENGAMBILAN 15 &PENGOLAHAN DATA
  • 16. Materials Requisition Form M2 Dunia Rombong Materials Requisition Form Requisition No. : M2 Date : 02-Okt-12 Job No. : A1 Description Quantity Unit Cost Total Cost Multiplex (p= 200 cm, l= 40 cm, t = 12 mm) 3 lembar Rp 130.000 Rp 390.000 Multiplex (p= 100 cm, l= 40 cm, t = 12 mm) 2 Rp 65.000 Rp 130.000 Total Rp 520.000 Autorized Signature CV Alam Karya utama PENGAMBILAN 16 &PENGOLAHAN DATA
  • 17. Materials Requisition Form M3 Dunia Rombong Materials Requisition Form Requisition No. : M3 Date : 02-Okt-12 Job No. : A1 Description Quantity Unit Cost Total Cost Kerangka besi dan roda 1 perangkat Rp 300.000 Rp 300.000 Total Rp 300.000 Autorized Signature CV Alam Karya utama PENGAMBILAN 17 &PENGOLAHAN DATA
  • 18. Materials Requisition Form M4 Dunia Rombong Materials Requisition Form Requisition No. : M4 Date : 02-Okt-12 Job No. : A1 Description Quantity Unit Cost Total Cost Melamin (pelapis) warna putih 5 lembar Rp 85.000 Rp 425.000 Total Rp 425.000 Autorized Signature CV Alam Karya utama PENGAMBILAN 18 &PENGOLAHAN DATA
  • 19. Employee Time Ticket PENGAMBILAN 19 &PENGOLAHAN DATA
  • 20. Manufacturing Overhead Cost Kebutuhan Listrik Kebutuhan listrik 1 (satu bulan) = Rp 200.000 Kebutuhan listrik 1 produk = Kebutuhan listrik 1 bulan = PENGAMBILAN 20 &PENGOLAHAN DATA
  • 21. Manufacturing Overhead Cost Bahan Baku Tidak Langsung No Material Kebutuhan Harga / unit Harga Total 1 Lem Fox 600 gram 1 kaleng Rp 35.000 Rp 35.000 2 Sekrup 1 gross = 150 buah Rp 1.750 Rp 1.750 3 Cat 3 warna @ 1 kaleng Rp 35.000 Rp 105.000 4 Amplas 5 lembar Rp 2.500 Rp 12.500 5 Engsel Pintu 6 pasang Rp 5.000 Rp 30.000 Total Rp 184.250 PENGAMBILAN 21 &PENGOLAHAN DATA
  • 22. Manufacturing Overhead Cost Jumlah Jam Kerja dalam 1 Produk Dihitungberdasarkanharikerjadikalikandengan jamkerjastandarharian. Jamkerja =8harix8jam =64jam PENGAMBILAN 22 &PENGOLAHAN DATA
  • 23. Manufacturing Overhead Cost Perhitungan POHR Budgeted manufacturing-overhead cost POHR = Budgeted amount of cost driver (or activity base) PENGAMBILAN 23 &PENGOLAHAN DATA
  • 24. Job Order Cost Sheet Dunia Rombong Job-Cost Shee t Job No. : A1 Date Initiated 02/10/2012 : Job Name : Rombong Sego N'Jamoer Date Completed 07/10/2012 : Direct Materials Direct Labor Manufacturing Overhe ad Req. No Amount Ticke t Jam Kerja Amount Hours Rate Amount M1 Rp 40.000 1 8 Rp 119.048 8 3191 Rp25.528 M2 Rp 520.000 2 8 Rp 119.048 8 3191 Rp25.528 M3 Rp 300.000 3 8 Rp 119.048 8 3191 Rp25.528 M4 Rp 425.000 4 8 Rp 119.048 8 3191 Rp25.528 5 8 Rp 119.048 8 3191 Rp25.528 6 8 Rp 119.048 8 3191 Rp25.528 7 8 Rp 89.286 8 3191 Rp25.528 8 8 Rp 89.286 8 3191 Rp25.528 9 8 Rp 83.333 8 3191 Rp25.528 10 8 Rp 83.333 8 3191 Rp25.528 11 8 Rp 83.333 8 3191 Rp25.528 Total Rp 1.285.000 88 Rp 1.142.858 88 35101 Rp280.808 Cost Sumary Direct Materials Rp 1.285.000 Direct Labor Rp 1.142.858 Manufacturing Overhead Rp 280.808 Total Cost Rp 2.708.666 Unit Cost Rp 2.708.666 PENGAMBILAN 24 &PENGOLAHAN DATA
  • 25. Perhitungan Job Order Costing Tipe/Karakteristik Nilai POHR Pesanan ANALISIS & 25 INTERPRETASI DATA
  • 26. Perbandingan Hasil Job Order Costing dengan Perhitungan Aktual PERHITUNGAN AKTUAL 1 unit rombong Sego NJamoer senilai Rp 5.300.000 JOB ORDER COSTING 1 unit rombong Sego NJamoer membutuhkan biaya produksi Rp 2.708.666. KEUNTUNGAN Rp 2.591.334 = 48,9 % HARGA PRODUK ANALISIS & 26 INTERPRETASI DATA
  • 27. KESIMPULAN 1. Job Order Costing merupakan sistem kalkulasi biaya berdasarkan pesanan, dimana biaya yang dikumpulkan akan dibebankan ke unit produksi. 2. Berdasarkan hasil perhitungan yang telah diuraikan sebelumnya maka didapat hasil perhitungan 1 unit rombong Sego NJamoer membutuhkan biaya produksi Rp 2.708.666. Dimana sebagai perbandingan, 1 unit rombong Sego NJamoer dijual senilai Rp 5.300.000. KESIMPULAN & SARAN 27