ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
MADAN MOHAN
 +917358670182, +918587843345
 madan.mohan22@gmail.com
Seeking assignments in the field ofSeeking assignments in the field of
Telecommunication as a RF/WirelessTelecommunication as a RF/Wireless
analysis, Planning, Optimization, Projectanalysis, Planning, Optimization, Project
Management and contribute towardsManagement and contribute towards
organization success in India & overseas.organization success in India & overseas.
Current Company
21st
October 2015- to Present
Future Focus Infotech Pvt. Ltd (TCS)
Current Project:
Optus Australia Nokia GDC
Current Location
Chennai
Personal Data
Father’s Name : Shyam Sunder chaturvedi
Mother’s name : Geeta Devi
Sex : Male
Nationality : Indian
Marital Status : Married
Languages : English, Hindi, Bengali
Passport No : K3908921
Summary
• 8 Year Experience As RNO ( GSM,WCDMA,LTE )
• Working with Nokia Global as RNO(LTE, 2G, 3G) from 21st
October 2015
• Able to handle Team and able to do Team Management. coordination
• Good communication skills, Able to handle Pressure
Education
• B.TECH. in computer science from Anand Engineering College (College of
UP Technical University) in 2004-2007.
• Three Years Diploma in Electronics and communication from M.G.
Polytechnic U.P (2001-2004)
• One Month Training on GSM in 2007
• Intermediate(12th
) from UP Board Lucknow
• High school(10th
) from UP Board Lucknow
Areas of Proficiency / Core Competencies
• Wireless Network RF Parameter tuning, Optimization layer 3 analysis
• Network Pre & Post launch Optimization(LTE, 3G, GSM)
• Network Performance monitoring & KPI improvement
•
Professional Experience
• Future focus Infotech Pvt ltd(TCS)(21st
Oct 2015 to till date) as RNO Nokia ( LTE,2G, 3G )
• Worked with SamaxTelecom (25August. 2014to21July2015)as RNO Nokia GDC(LTE,3G )
• Worked with Decon const.(14th
June. 2013 to 23rd
August 2014) as RNO Vodafone (2G, 3G)
• Worked with Out worx (p) ltd (14th
Jan. 2013 to 31st
May 2013) as RNO Vodafone (2G, 3G)
• Worked with Shivam Infocom Pvt ltd. (1st
Dec. 2011 to 12th
Jan 2013) Vodafone (2G ,3G)
• Worked with GTL (22nd
Dec. 2009 to 25th
April2011) RF optimizer Huawei RCOM (2G)
• Worked with Prithvi information Solution(19th
Sept.2008 to 8th
Oct 2009)RF Data Analyser Engineer
Huawei RCOM (2G)
Tools
• Nokia OSS RAS( CM Editor, CM Configuration manager, Reporting
Suite, Optimizer, NetAct Monitor) , Plan editor
• Ericsson OSS RAN (NAS, FAS, RPMO),CNA
• Huawei M2000 and LMT , Genex probe and Assistant
• Planning tool Atoll, Daisy tool, BTS manager
• Post processing tool Actix MapInfo (11.5), NEMO Windcatcher, XCAP
• TEMS 10.5,MCOM,MIPT,PIANO,GOOGLE EARTH, Global Mapper10
• Microsoft Excel: Ability to plot KPI’s & Comparison
• Microsoft Windows 98/2000/XP/Windows 7
• Microsoft Office, Excel, Access, Word, PowerPoint
•
Technologies
• GSM, GPRS,CDMA
• UMTS/HSDPA/HSUPA
• NOKIA LTE (L700, L1900, L2100)
RAN Equipment Vendors
• ERICSSON, HUAWEI , NOKIA
Strengths
• Flexible, able to respond to rapid changes
• Comprehensive problem solving abilities
Work Experience
Duration 21st
October 2015 to 30th
may 2016
Project Name Nokia Global EE Darwin(2G,LTE)
Responsibilities: • counter and KPI report analysis for , RACH setup ,RRC setup fail, ERAB setup fail,
S1 and X2 ho fail, CSFB attempt, PRB use, PDCCH AGG used, load and traffic
sharing between different layer,
• Create KPI and Report by reporting suite, making Work set, recommendation for
neighbor addition deletion, RET, Azimuth change,
• Analysis for poor dominant area, poor coverage and quality, ping pong ho,
interference, low traffic, identify poor UL and Dl problem, layer 3 analysis for ho fail
and other kpi,
• Editing basic parameter like threshold,offset, hysteresis, CIO, Thresh x high ,Thresh
x low cell power,Po nominal pusch and other from cm editor, consistency check for
capacity parameter service activation checking RET through monitor tool, OSS
dump and object addition and editing with configuration manager
• Analysis RRC and ERAB Setup Success Rate, Radio Bearer Drop Rate, CSFB
Preparation Success Rate, Intra and inter frequency handover success rate , UL
and Dl throughput, Traffic Volume
• Knowledge of call flow, parameter for (PRACH, RACH, RRC, DRX, Paging,BSR,
SR, CQI,RI, MIMO, DCI, PDCCH, PUCCH, Power control, and hand over control,
load control) VOLTE, CSFB interface, protocol
•
Organization: Samax Telecom Pvt Ltd
Duration 25th
August 2014 to 21st
July 2015
Project Name Nokia Global US cellular(LTE) and Vodafone Australia(2G,3G, LTE)
Responsibilities: • Report analysis( DSA24, DSA7) for new technology and old technology to check overall effect sector
swap, RTWP, RSSI TMA Power, RET, Poor KPI for gsm , 3G , LTE, MIMO RANKING ,
• RS power
• Analysis RRC Setup and Access Complete Ratio, CS and PS RAB Setup Success Ratio, 3G drop call
rate, SLA_R99 Retainability, HSDPA Accessibility, dl throughput, mimo rank
• Analysis GSM,TCH Assignment Success Rate, Immediate assignment Success rate CS Service
Success Rate, 2G Voice Drop Rate, SDCCH Success Rate, utilization,traffic sharing
• Knowledge of 3g Congestion (code ,power, CE, Iub) admission control, , IRAT, IFHO, SHO, Access
control PRACH , Paging ,3g power control, cell selection and reselection, pilot pollution ,
•
•
Organization: Decon Construction Pvt . ltd.
Duration 14th
June 2013 to 23rd
August 2014
Project Name Vodafone Delhi (GSM and 3G) Optimization
Responsibilities: • Coordination of drive test engineer for physical optimization to improving kpi
• Parameter tunning and monitoring of gsm site through ericssion citrix tool, RPMO, CAN , NCS,
FAS
• Handling customer complain, and poor coverage and quality issue
• Analysis of gsm cell report(NBH and BBH) for VSWR case, overshooting, low traffic, high sd
drop, tch drop and utilization And KPI improvement
• Analyzing DT log using TEMS investigation drive test tool and actix
• Identify any CO BCCH BSIC issue through map info piano tool, google earth, and drive test log
files for poor accessibility and tch and SD call drop
• Improving RTWP and by power control parameter, and reduce ul interference, load sharing
through handover and cell reselction parameter
• Improving accessibility through admission control parameter
Organization: Outworx (p)ltd
Duration 14rd
Jan 2013 10 To 31st
May 2013
Project Name Vodafone (GSM & WCDMA)
Responsibilities: • Benchmarking Log Analysis regarding GSM voice & data kpi
• Benchmarking Log Analysis regarding UMTS voice & data kpi
• KPIs GSM & UMTS voice (CSSR, CCSR, MOS, Coverage, Call setup time), Scoring evolution
• KPIs GSM & 3G plots , pilot pollution, CQI, RSCP, Ec/Io, Bler, SHO, IRAT, IFHO, modulation
scheme, rx qul, rx lev, c/I, bcch,etc
• Recommendation for quality, coverage, Throughput, Interference, etc.
• Optimization and reporting & analysis using Actix Post Processing Tool
Organization: Shivan Infocom (p) ltd
Duration 1st
Dec 11 To 12th
Jan 2013
Project Name Vodafone Ericssion Delhi GSM and 3G
Responsibilities: • Handover analysis & missing neighbor analysis (3g-3g, 3g-2g)
• Schedule the activities of Cluster Drive Test team – drive routes, type of tests, data
to process.
• Optimizing the Clusters and preparing the punch list of cluster area problems with
recommendations.
• Primary optimization for verifying existing coverage, sites design objectives, pointing
coverage holes.
• Neighbors’ optimization with the help of Map Info Professional and OMCR Report.
• Handling SCFT & Cluster Optimization of New Sites & handling the problems of
coverage, quality, call drops interference.
• Analysis done on daily basis to improve/escalate degraded issues.
• Analyzing all major KPI’s such as DCR, CSSR, HOSR, UL/DL quality, TCH blocking,
SD blocking, Dual band traffic share, HR/FR settings etc to improve network level
KPI’s.
Organization: Global Innov source pvt. Ltd. (GTL)
Duration 22nd
Dec 2009 To 25th
April 2011
Project Name RCOM Huawei Mumbai GSM data analysis
Responsibilities: • GSM log file analysis layer 3 analysis for poor coverage, poor quality , overshooting,
swap, high interference , co BCCH, and neighbor analysis
• Analysis TA, handover report for neighbor analysis, path imbalance report for ul, dl
balance, quality checking interferenceon , and checking poor TASR, IASR, HOSR,
sd and TCH bloackig
• Physical and parameter tuning for traffic shift, load control, access fail and poor
coverage, tch drop , sd drop , handover fail
• Neighbor addition and deletion , and physical tuning of antenna tilt azimuth, find out
low traffic cell and share high traffic of congested cell to neighbor cell
•
Organization: Prithvi Information Solution (p) ltd
Duration 19th
Sept 2008 to 8th
Oct 2009
Project Name RCOM Huawei Karnataka drive test and data analysis
Responsibilities: • Drive test through Genex prove and data analysis through Genex Assistant
• ,RF survey, transmission survey, reporting and submission
• SCFT of 500 sites in Bangalore and uduppi, mysore
• Collecting site data and validation as per plan , Bcch, azimuth, height, swap,
lat long ,
• Checking for site neighbor addition and deletion as per coverage, handover
issue , call drop, mos test, gprs test
• Testing rx lev, rxqul, C/I, bcch, gprs, call setup time, , Call setup success rate,
Call completion success rate, handover failure, tch drop
•
DECLARATION:
I hereby declare that the above-furnished information is correct to the best of my knowledge and belief.
Date: 06/08/2016 Yours sincerely
Place: Chennai Madan Mohan

More Related Content

madan resume. august

  • 1. MADAN MOHAN  +917358670182, +918587843345  madan.mohan22@gmail.com Seeking assignments in the field ofSeeking assignments in the field of Telecommunication as a RF/WirelessTelecommunication as a RF/Wireless analysis, Planning, Optimization, Projectanalysis, Planning, Optimization, Project Management and contribute towardsManagement and contribute towards organization success in India & overseas.organization success in India & overseas. Current Company 21st October 2015- to Present Future Focus Infotech Pvt. Ltd (TCS) Current Project: Optus Australia Nokia GDC Current Location Chennai Personal Data Father’s Name : Shyam Sunder chaturvedi Mother’s name : Geeta Devi Sex : Male Nationality : Indian Marital Status : Married Languages : English, Hindi, Bengali Passport No : K3908921 Summary • 8 Year Experience As RNO ( GSM,WCDMA,LTE ) • Working with Nokia Global as RNO(LTE, 2G, 3G) from 21st October 2015 • Able to handle Team and able to do Team Management. coordination • Good communication skills, Able to handle Pressure Education • B.TECH. in computer science from Anand Engineering College (College of UP Technical University) in 2004-2007. • Three Years Diploma in Electronics and communication from M.G. Polytechnic U.P (2001-2004) • One Month Training on GSM in 2007 • Intermediate(12th ) from UP Board Lucknow • High school(10th ) from UP Board Lucknow Areas of Proficiency / Core Competencies • Wireless Network RF Parameter tuning, Optimization layer 3 analysis • Network Pre & Post launch Optimization(LTE, 3G, GSM) • Network Performance monitoring & KPI improvement • Professional Experience • Future focus Infotech Pvt ltd(TCS)(21st Oct 2015 to till date) as RNO Nokia ( LTE,2G, 3G ) • Worked with SamaxTelecom (25August. 2014to21July2015)as RNO Nokia GDC(LTE,3G ) • Worked with Decon const.(14th June. 2013 to 23rd August 2014) as RNO Vodafone (2G, 3G) • Worked with Out worx (p) ltd (14th Jan. 2013 to 31st May 2013) as RNO Vodafone (2G, 3G) • Worked with Shivam Infocom Pvt ltd. (1st Dec. 2011 to 12th Jan 2013) Vodafone (2G ,3G) • Worked with GTL (22nd Dec. 2009 to 25th April2011) RF optimizer Huawei RCOM (2G) • Worked with Prithvi information Solution(19th Sept.2008 to 8th Oct 2009)RF Data Analyser Engineer Huawei RCOM (2G) Tools • Nokia OSS RAS( CM Editor, CM Configuration manager, Reporting Suite, Optimizer, NetAct Monitor) , Plan editor • Ericsson OSS RAN (NAS, FAS, RPMO),CNA • Huawei M2000 and LMT , Genex probe and Assistant • Planning tool Atoll, Daisy tool, BTS manager • Post processing tool Actix MapInfo (11.5), NEMO Windcatcher, XCAP • TEMS 10.5,MCOM,MIPT,PIANO,GOOGLE EARTH, Global Mapper10 • Microsoft Excel: Ability to plot KPI’s & Comparison • Microsoft Windows 98/2000/XP/Windows 7 • Microsoft Office, Excel, Access, Word, PowerPoint • Technologies • GSM, GPRS,CDMA • UMTS/HSDPA/HSUPA • NOKIA LTE (L700, L1900, L2100) RAN Equipment Vendors • ERICSSON, HUAWEI , NOKIA Strengths • Flexible, able to respond to rapid changes • Comprehensive problem solving abilities
  • 2. Work Experience Duration 21st October 2015 to 30th may 2016 Project Name Nokia Global EE Darwin(2G,LTE) Responsibilities: • counter and KPI report analysis for , RACH setup ,RRC setup fail, ERAB setup fail, S1 and X2 ho fail, CSFB attempt, PRB use, PDCCH AGG used, load and traffic sharing between different layer, • Create KPI and Report by reporting suite, making Work set, recommendation for neighbor addition deletion, RET, Azimuth change, • Analysis for poor dominant area, poor coverage and quality, ping pong ho, interference, low traffic, identify poor UL and Dl problem, layer 3 analysis for ho fail and other kpi, • Editing basic parameter like threshold,offset, hysteresis, CIO, Thresh x high ,Thresh x low cell power,Po nominal pusch and other from cm editor, consistency check for capacity parameter service activation checking RET through monitor tool, OSS dump and object addition and editing with configuration manager • Analysis RRC and ERAB Setup Success Rate, Radio Bearer Drop Rate, CSFB Preparation Success Rate, Intra and inter frequency handover success rate , UL and Dl throughput, Traffic Volume • Knowledge of call flow, parameter for (PRACH, RACH, RRC, DRX, Paging,BSR, SR, CQI,RI, MIMO, DCI, PDCCH, PUCCH, Power control, and hand over control, load control) VOLTE, CSFB interface, protocol • Organization: Samax Telecom Pvt Ltd Duration 25th August 2014 to 21st July 2015 Project Name Nokia Global US cellular(LTE) and Vodafone Australia(2G,3G, LTE) Responsibilities: • Report analysis( DSA24, DSA7) for new technology and old technology to check overall effect sector swap, RTWP, RSSI TMA Power, RET, Poor KPI for gsm , 3G , LTE, MIMO RANKING , • RS power • Analysis RRC Setup and Access Complete Ratio, CS and PS RAB Setup Success Ratio, 3G drop call rate, SLA_R99 Retainability, HSDPA Accessibility, dl throughput, mimo rank • Analysis GSM,TCH Assignment Success Rate, Immediate assignment Success rate CS Service Success Rate, 2G Voice Drop Rate, SDCCH Success Rate, utilization,traffic sharing • Knowledge of 3g Congestion (code ,power, CE, Iub) admission control, , IRAT, IFHO, SHO, Access control PRACH , Paging ,3g power control, cell selection and reselection, pilot pollution , • • Organization: Decon Construction Pvt . ltd. Duration 14th June 2013 to 23rd August 2014 Project Name Vodafone Delhi (GSM and 3G) Optimization Responsibilities: • Coordination of drive test engineer for physical optimization to improving kpi • Parameter tunning and monitoring of gsm site through ericssion citrix tool, RPMO, CAN , NCS, FAS • Handling customer complain, and poor coverage and quality issue • Analysis of gsm cell report(NBH and BBH) for VSWR case, overshooting, low traffic, high sd drop, tch drop and utilization And KPI improvement • Analyzing DT log using TEMS investigation drive test tool and actix • Identify any CO BCCH BSIC issue through map info piano tool, google earth, and drive test log files for poor accessibility and tch and SD call drop • Improving RTWP and by power control parameter, and reduce ul interference, load sharing through handover and cell reselction parameter • Improving accessibility through admission control parameter Organization: Outworx (p)ltd Duration 14rd Jan 2013 10 To 31st May 2013
  • 3. Project Name Vodafone (GSM & WCDMA) Responsibilities: • Benchmarking Log Analysis regarding GSM voice & data kpi • Benchmarking Log Analysis regarding UMTS voice & data kpi • KPIs GSM & UMTS voice (CSSR, CCSR, MOS, Coverage, Call setup time), Scoring evolution • KPIs GSM & 3G plots , pilot pollution, CQI, RSCP, Ec/Io, Bler, SHO, IRAT, IFHO, modulation scheme, rx qul, rx lev, c/I, bcch,etc • Recommendation for quality, coverage, Throughput, Interference, etc. • Optimization and reporting & analysis using Actix Post Processing Tool Organization: Shivan Infocom (p) ltd Duration 1st Dec 11 To 12th Jan 2013 Project Name Vodafone Ericssion Delhi GSM and 3G Responsibilities: • Handover analysis & missing neighbor analysis (3g-3g, 3g-2g) • Schedule the activities of Cluster Drive Test team – drive routes, type of tests, data to process. • Optimizing the Clusters and preparing the punch list of cluster area problems with recommendations. • Primary optimization for verifying existing coverage, sites design objectives, pointing coverage holes. • Neighbors’ optimization with the help of Map Info Professional and OMCR Report. • Handling SCFT & Cluster Optimization of New Sites & handling the problems of coverage, quality, call drops interference. • Analysis done on daily basis to improve/escalate degraded issues. • Analyzing all major KPI’s such as DCR, CSSR, HOSR, UL/DL quality, TCH blocking, SD blocking, Dual band traffic share, HR/FR settings etc to improve network level KPI’s. Organization: Global Innov source pvt. Ltd. (GTL) Duration 22nd Dec 2009 To 25th April 2011 Project Name RCOM Huawei Mumbai GSM data analysis Responsibilities: • GSM log file analysis layer 3 analysis for poor coverage, poor quality , overshooting, swap, high interference , co BCCH, and neighbor analysis • Analysis TA, handover report for neighbor analysis, path imbalance report for ul, dl balance, quality checking interferenceon , and checking poor TASR, IASR, HOSR, sd and TCH bloackig • Physical and parameter tuning for traffic shift, load control, access fail and poor coverage, tch drop , sd drop , handover fail • Neighbor addition and deletion , and physical tuning of antenna tilt azimuth, find out low traffic cell and share high traffic of congested cell to neighbor cell • Organization: Prithvi Information Solution (p) ltd Duration 19th Sept 2008 to 8th Oct 2009 Project Name RCOM Huawei Karnataka drive test and data analysis Responsibilities: • Drive test through Genex prove and data analysis through Genex Assistant • ,RF survey, transmission survey, reporting and submission • SCFT of 500 sites in Bangalore and uduppi, mysore • Collecting site data and validation as per plan , Bcch, azimuth, height, swap, lat long , • Checking for site neighbor addition and deletion as per coverage, handover issue , call drop, mos test, gprs test • Testing rx lev, rxqul, C/I, bcch, gprs, call setup time, , Call setup success rate, Call completion success rate, handover failure, tch drop • DECLARATION: I hereby declare that the above-furnished information is correct to the best of my knowledge and belief.
  • 4. Date: 06/08/2016 Yours sincerely Place: Chennai Madan Mohan