KONECRANES INDIA PVT.LTD INDIA, PUNE
15th Apr 2013 to Still Date.
Design Engineer
Work analyze.
Time estimation.
Distribution of work
Quality Check & Error Analysis and take action to prevent them
3D Modeling,2D detailing
Isometric Drawings of parts, Assembly sequence and Exploded views
Handling team for the operational work during the event.
26th Jul 2010 to 15th Apr 2013.
Documentation Engineer
Communicate with client.
Work analyze.
Time estimation.
Distribution of work
Quality Check & Error Analysis and take action to prevent them
3D Modeling, 2D detailing
Isometric Drawings of parts, Assembly sequence and Exploded views
Hand...