狠狠撸

狠狠撸Share a Scribd company logo
Serial No. Depot No. of based Coaches
1 Minor 50 – 100
2 Medium 100 – 250
3 Major Above 250
CLASSIFICATION OF COACHING
MAINTENANCE DEPOTS
? ICF- Integral Coach Factory(Chennai)
? RCF- Rail Coach Factory( Kapurthala , Punjab)
? LHB- Link Holfmann Bushh (Fiat Bogies)
? HYBRID- LHB body on modified ICF bogies
COACHES
ICF/RCF LHB/HYBRID
Length over buffer 22296(mm) 24000(mm)
Length over head
stock
21336(mm) 23540(mm)
Width 3245(mm) 3030(mm)
Codal life 25 years 30 years
DIMENSIONS OF COACH SHELL
?Washing Line
1. Trip Schedule : After every trip by primary maintenance depot.
? Sick Line
1. Schedule A : Monthly (1 month + 7 days)
2. Schedule B : Quarterly (3 months + 15 days)
3. Schedule C : After 180 days or 6 Months
4. IOH : Every 9 months
5. POH : Every 18 months
MAINTENANCE SCHEDULE AND
CATEGORY
SICK LINE
? Sick line is the workshop for the major and periodical
maintenance of the coaches.
? It consists of modern facilities like pit for working
under frame And crane for separation of coach &
bogie for repair of all type of defects.
1. Wheel and Axle Assembly
2. Bogie Maintenance
3. Buffer Maintenance
4. Air Brake System Maintenance
5. Trolley Maintenance
6. Lifting of Coaches
7. Riding Index
WORKS CARRIED OUT IN SICK LINE
1. Width of wheel = 127 mm
2. Wheel Diameter = 915 (new), 825 (condemn)
Permissible diameter variation in wheel
Coaching
? On same axle – 0.5 mm
? On same bogie – 5.0 mm
? On same coach – 13.0 mm
Goods
? On same axle – 0.5 mm
? On same bogie – 13.0 mm
? On same coach – 25.0 mm
Fig. 1 Wheel profile (all length dimension are in mm)
Wheel and Axle Assembly
?Wheels are fixed on the axle with the help of bearings.
?Like wheel, it is also made up of steel.
?Brake cylinder are attached to axle.
?Braking discs are fixed on the axle
Fig. 2 Axle
Buffer height adjustment
Causes of low buffer height in ICF coaching stock :
a) excessive wear of wheel
b) Due to loss of proper stiffness of coil spring
c) Due to excessive wear on side bearer’s metal & bronze piece.
Maximum buffer height = 1105 mm [In empty condition]
Minimum buffer height = 1030 mm [In loaded condition]
To achieve buffer height a standard size of wooden packing pieces are used
which are kept below the Dash Pot Flange on axle Box wings of primary
suspension.
Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm)
1. Below 889 up to 863 13
2. Below 863 up to 839 26
3. Below 839 up to 819 38
4. 819 & below 48
In Air Brake system compressed air is used for operating the
brake system. The locomotive compressor charges the feed
pipe and the brake pipes throughout the length of the train.
The feed pipe is connected to the auxiliary reservoirs and the
brake pipe is connected to the brake cylinders through the
distributor valve. Brake application takes place by dropping the
pressure in the brake pipe.
TYPES:
1. Direct Release System- brakes are released immediately,
as soon as releasing of brakes is initiated.
2. Gradguate Release System - brake cylinder pressure can
be reduced gradually in steps in proportion to the increase in
brake pipe pressure.
AIR BRAKE SYSTEM
? Single Pipe Air Brake System:- There is only one
pipe called brake pipe running from loco to the
brake van in order to get continuity of air for the
application & release of brakes.
? Twin Pipe Air Brake System :- In addition to brake
pipe, there is one more pipe called feed pipe ,
running loco to the brake van to charge the
auxiliary reservoir continuously to 6 kg/cm2
Types of Gradguate Release System
Trolley Maintenance
Parts of Trolley
1. Trolley Frame
2. Center pivot
3. Side Bearing
4. Brake Cylinder
Fig. 3 Trolley
Lifting of coaches
Require tools and equipments
1. With the use of Mechanical Jacks
2. With the use of Hydraulic Jacks
3. With the use of Electrical operated Travelling Crane
4. With the use of Whiting Jacks
PLATFORM TRAIN DUTY
? Rolling In
?Rolling out
?Axle box feeling
?Brake Power Certificate
?Safe to Run
ROLLING IN/ROLLING OUT
When train enters in station Examiner staff take up positions on
both sides inspect the train enters at the speed of 8 Km/hr
?Whistling sound of hot axle boxes.
? Any hanging part or loose fitting of vehicle.
?Any component or spring suspension bracket loose/broken.
? Abnormal behaviour of vehicle.
Axle box feeling
?After the train come to halt, all axle boxes are felt within 20
minutes. The temp. of axle is checked by touching with hand
?Temp. is found high then it is checked by the temp. gun which
gives exact temp.
?If this temp. is found more than 30 degree than atm. temp.
then the cause is inspected and coach is sent to workshop
BRAKE POWER Certificate
? This certificate is jointly signed by Guard , Driver, and C&W
supervisor.
?The incoming driver shall handover the brake power
certificate to Reliving driver or Deposit it the nominated
authority, who will give it to the outgoing Driver.
?The outgoing driver and guard will satisfy themselves from
the listed coach numbers that the Brake Power Certificate
pertains to their train.
Safe to run
If all of above factors like no hanging parts brakes are
working correctly the temp of axle box is with in range
and the train is in good and safe condition of running
then the train is announced as safe to run.
Riding is a quality of comfort experienced by passenger,
depends not only upon acceleration, rate of change of
acceleration & vibration but also some other factors as like
noise, moisture temperature etc.
Ride Index =
10
0.896 ∑ ?3
∑?
?(?)
b : Amplitude of acceleration
f : Frequency of acceleration
F(f) : a correction factor dependent on the frequency
Ride index for ICF: <3.5
for LHB<2.75
RIDING INDEX
THANK YOU ALL FOR YOUR KIND ATTENTION

More Related Content

Similar to amitppt_151004200417_lva1_app6891_(1).pptx (20)

Northern railway
Northern railwayNorthern railway
Northern railway
sometech
?
Project Report
Project Report Project Report
Project Report
Praveen Kumar
?
Harish rathi
Harish rathiHarish rathi
Harish rathi
Harish Rathee
?
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
pradeep verma
?
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training
hisham munir
?
Wagon Repair Shop Raipur presentation file
Wagon Repair Shop Raipur presentation fileWagon Repair Shop Raipur presentation file
Wagon Repair Shop Raipur presentation file
ankitnishad267898
?
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
Awanish Kumar
?
Presentation1 lhb coaches.pptx lhb coach
Presentation1 lhb coaches.pptx lhb coachPresentation1 lhb coaches.pptx lhb coach
Presentation1 lhb coaches.pptx lhb coach
ChandrashekharPandey31
?
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
Itnesh Kumar
?
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
kalyan kumar
?
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
Mohammad Adnan
?
Coach Care Complex,NWR Jaipur
Coach Care Complex,NWR JaipurCoach Care Complex,NWR Jaipur
Coach Care Complex,NWR Jaipur
National Institute of Technology, Hamirpur
?
trainingppt-150327125203-conversion-gate01.pdf
trainingppt-150327125203-conversion-gate01.pdftrainingppt-150327125203-conversion-gate01.pdf
trainingppt-150327125203-conversion-gate01.pdf
meepramodkumar2005
?
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
?
Dlw training session
Dlw training sessionDlw training session
Dlw training session
Shubham Khendkar
?
Jaipur metro bogie
Jaipur metro bogieJaipur metro bogie
Jaipur metro bogie
TusharAgarwal161
?
Prashant patel
Prashant patelPrashant patel
Prashant patel
PRASHANT KUMAR PATEL
?
Bogie
BogieBogie
Bogie
Ajeet Kumar
?
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
Sahil arora
?
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
gauravjagdale
?
Northern railway
Northern railwayNorthern railway
Northern railway
sometech
?
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
pradeep verma
?
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training
hisham munir
?
Wagon Repair Shop Raipur presentation file
Wagon Repair Shop Raipur presentation fileWagon Repair Shop Raipur presentation file
Wagon Repair Shop Raipur presentation file
ankitnishad267898
?
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
Awanish Kumar
?
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
Itnesh Kumar
?
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
kalyan kumar
?
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
Mohammad Adnan
?
trainingppt-150327125203-conversion-gate01.pdf
trainingppt-150327125203-conversion-gate01.pdftrainingppt-150327125203-conversion-gate01.pdf
trainingppt-150327125203-conversion-gate01.pdf
meepramodkumar2005
?
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
?
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
Sahil arora
?

More from AryanYadav924184 (7)

Disorder of local abuse impact in public
Disorder of local abuse impact in publicDisorder of local abuse impact in public
Disorder of local abuse impact in public
AryanYadav924184
?
lasercutting (1) (1).pptx
lasercutting (1) (1).pptxlasercutting (1) (1).pptx
lasercutting (1) (1).pptx
AryanYadav924184
?
Water Management SIH 1.pptx
Water Management SIH 1.pptxWater Management SIH 1.pptx
Water Management SIH 1.pptx
AryanYadav924184
?
compressors ppt-1_20220914_232604.pptx
compressors ppt-1_20220914_232604.pptxcompressors ppt-1_20220914_232604.pptx
compressors ppt-1_20220914_232604.pptx
AryanYadav924184
?
PDFen_organized.pptx
PDFen_organized.pptxPDFen_organized.pptx
PDFen_organized.pptx
AryanYadav924184
?
processes-biofuels-and-bioproducts.ppt
processes-biofuels-and-bioproducts.pptprocesses-biofuels-and-bioproducts.ppt
processes-biofuels-and-bioproducts.ppt
AryanYadav924184
?
MODULE_4.ppt
MODULE_4.pptMODULE_4.ppt
MODULE_4.ppt
AryanYadav924184
?

Recently uploaded (20)

Kaggle & Datathons: A Practical Guide to AI Competitions
Kaggle & Datathons: A Practical Guide to AI CompetitionsKaggle & Datathons: A Practical Guide to AI Competitions
Kaggle & Datathons: A Practical Guide to AI Competitions
rasheedsrq
?
A Relative Information Gain-based Query Performance Prediction Framework with...
A Relative Information Gain-based Query Performance Prediction Framework with...A Relative Information Gain-based Query Performance Prediction Framework with...
A Relative Information Gain-based Query Performance Prediction Framework with...
suchanadatta3
?
Introduction to database and analysis software’s suitable for.pptx
Introduction to database and analysis software’s suitable for.pptxIntroduction to database and analysis software’s suitable for.pptx
Introduction to database and analysis software’s suitable for.pptx
nabinparajuli9
?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?AI + Disability. Coded Futures: Better opportunities or biased outcomes?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?
Christine Hemphill
?
"MIAO Ecosystem Financial Management PPT
"MIAO Ecosystem Financial Management PPT"MIAO Ecosystem Financial Management PPT
"MIAO Ecosystem Financial Management PPT
miao22
?
Presentation.2 .reversal. reversal. pptx
Presentation.2 .reversal. reversal. pptxPresentation.2 .reversal. reversal. pptx
Presentation.2 .reversal. reversal. pptx
siliaselim87
?
Stasiun kernel pabrik kelapa sawit indonesia
Stasiun kernel pabrik kelapa sawit indonesiaStasiun kernel pabrik kelapa sawit indonesia
Stasiun kernel pabrik kelapa sawit indonesia
fikrimanurung1
?
19th Edition Of International Research Data Analysis Excellence Awards
19th Edition Of International Research Data Analysis Excellence Awards19th Edition Of International Research Data Analysis Excellence Awards
19th Edition Of International Research Data Analysis Excellence Awards
dataanalysisconferen
?
exampleexampleexampleexampleexampleexampleexampleexample
exampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexample
exampleexampleexampleexampleexampleexampleexampleexample
lembiczkat
?
Monitoring Imam Ririn di Pilkada Kota Depok 2024
Monitoring Imam Ririn di Pilkada Kota Depok 2024Monitoring Imam Ririn di Pilkada Kota Depok 2024
Monitoring Imam Ririn di Pilkada Kota Depok 2024
Deddy Rahman
?
Boosting MySQL with Vector Search Scale22X 2025.pdf
Boosting MySQL with Vector Search Scale22X 2025.pdfBoosting MySQL with Vector Search Scale22X 2025.pdf
Boosting MySQL with Vector Search Scale22X 2025.pdf
Alkin Tezuysal
?
The truth behind the numbers: spotting statistical misuse.pptx
The truth behind the numbers: spotting statistical misuse.pptxThe truth behind the numbers: spotting statistical misuse.pptx
The truth behind the numbers: spotting statistical misuse.pptx
andyprosser3
?
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo GuruThe Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
kenyoncenteno12
?
CH. 4.pptxt and I will be there in about
CH. 4.pptxt and I will be there in aboutCH. 4.pptxt and I will be there in about
CH. 4.pptxt and I will be there in about
miesoabdela57
?
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdfstages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
esguerramark1991
?
Valkey 101 - SCaLE 22x March 2025 Stokes.pdf
Valkey 101 - SCaLE 22x March 2025 Stokes.pdfValkey 101 - SCaLE 22x March 2025 Stokes.pdf
Valkey 101 - SCaLE 22x March 2025 Stokes.pdf
Dave Stokes
?
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
taqyed
?
Presentation1.pptx for data and table analysis
Presentation1.pptx for data and table analysisPresentation1.pptx for data and table analysis
Presentation1.pptx for data and table analysis
vatsalsingla4
?
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
Timothy Spann
?
CloudMonitor - Architecture Audit Review February 2025.pdf
CloudMonitor - Architecture Audit Review February 2025.pdfCloudMonitor - Architecture Audit Review February 2025.pdf
CloudMonitor - Architecture Audit Review February 2025.pdf
Rodney Joyce
?
Kaggle & Datathons: A Practical Guide to AI Competitions
Kaggle & Datathons: A Practical Guide to AI CompetitionsKaggle & Datathons: A Practical Guide to AI Competitions
Kaggle & Datathons: A Practical Guide to AI Competitions
rasheedsrq
?
A Relative Information Gain-based Query Performance Prediction Framework with...
A Relative Information Gain-based Query Performance Prediction Framework with...A Relative Information Gain-based Query Performance Prediction Framework with...
A Relative Information Gain-based Query Performance Prediction Framework with...
suchanadatta3
?
Introduction to database and analysis software’s suitable for.pptx
Introduction to database and analysis software’s suitable for.pptxIntroduction to database and analysis software’s suitable for.pptx
Introduction to database and analysis software’s suitable for.pptx
nabinparajuli9
?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?AI + Disability. Coded Futures: Better opportunities or biased outcomes?
AI + Disability. Coded Futures: Better opportunities or biased outcomes?
Christine Hemphill
?
"MIAO Ecosystem Financial Management PPT
"MIAO Ecosystem Financial Management PPT"MIAO Ecosystem Financial Management PPT
"MIAO Ecosystem Financial Management PPT
miao22
?
Presentation.2 .reversal. reversal. pptx
Presentation.2 .reversal. reversal. pptxPresentation.2 .reversal. reversal. pptx
Presentation.2 .reversal. reversal. pptx
siliaselim87
?
Stasiun kernel pabrik kelapa sawit indonesia
Stasiun kernel pabrik kelapa sawit indonesiaStasiun kernel pabrik kelapa sawit indonesia
Stasiun kernel pabrik kelapa sawit indonesia
fikrimanurung1
?
19th Edition Of International Research Data Analysis Excellence Awards
19th Edition Of International Research Data Analysis Excellence Awards19th Edition Of International Research Data Analysis Excellence Awards
19th Edition Of International Research Data Analysis Excellence Awards
dataanalysisconferen
?
exampleexampleexampleexampleexampleexampleexampleexample
exampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexampleexample
exampleexampleexampleexampleexampleexampleexampleexample
lembiczkat
?
Monitoring Imam Ririn di Pilkada Kota Depok 2024
Monitoring Imam Ririn di Pilkada Kota Depok 2024Monitoring Imam Ririn di Pilkada Kota Depok 2024
Monitoring Imam Ririn di Pilkada Kota Depok 2024
Deddy Rahman
?
Boosting MySQL with Vector Search Scale22X 2025.pdf
Boosting MySQL with Vector Search Scale22X 2025.pdfBoosting MySQL with Vector Search Scale22X 2025.pdf
Boosting MySQL with Vector Search Scale22X 2025.pdf
Alkin Tezuysal
?
The truth behind the numbers: spotting statistical misuse.pptx
The truth behind the numbers: spotting statistical misuse.pptxThe truth behind the numbers: spotting statistical misuse.pptx
The truth behind the numbers: spotting statistical misuse.pptx
andyprosser3
?
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo GuruThe Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
The Marketability of Rice Straw Yarn Among Selected Customers of Gantsilyo Guru
kenyoncenteno12
?
CH. 4.pptxt and I will be there in about
CH. 4.pptxt and I will be there in aboutCH. 4.pptxt and I will be there in about
CH. 4.pptxt and I will be there in about
miesoabdela57
?
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdfstages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
stages-of-moral-development-lawrence-kohlberg-pdf-free.pdf
esguerramark1991
?
Valkey 101 - SCaLE 22x March 2025 Stokes.pdf
Valkey 101 - SCaLE 22x March 2025 Stokes.pdfValkey 101 - SCaLE 22x March 2025 Stokes.pdf
Valkey 101 - SCaLE 22x March 2025 Stokes.pdf
Dave Stokes
?
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
加拿大成绩单购买原版(顿补濒毕业证书)戴尔豪斯大学毕业证文凭
taqyed
?
Presentation1.pptx for data and table analysis
Presentation1.pptx for data and table analysisPresentation1.pptx for data and table analysis
Presentation1.pptx for data and table analysis
vatsalsingla4
?
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
2025-03-03-Philly-AAAI-GoodData-Build Secure RAG Apps With Open LLM
Timothy Spann
?
CloudMonitor - Architecture Audit Review February 2025.pdf
CloudMonitor - Architecture Audit Review February 2025.pdfCloudMonitor - Architecture Audit Review February 2025.pdf
CloudMonitor - Architecture Audit Review February 2025.pdf
Rodney Joyce
?

amitppt_151004200417_lva1_app6891_(1).pptx

  • 1. Serial No. Depot No. of based Coaches 1 Minor 50 – 100 2 Medium 100 – 250 3 Major Above 250 CLASSIFICATION OF COACHING MAINTENANCE DEPOTS
  • 2. ? ICF- Integral Coach Factory(Chennai) ? RCF- Rail Coach Factory( Kapurthala , Punjab) ? LHB- Link Holfmann Bushh (Fiat Bogies) ? HYBRID- LHB body on modified ICF bogies COACHES
  • 3. ICF/RCF LHB/HYBRID Length over buffer 22296(mm) 24000(mm) Length over head stock 21336(mm) 23540(mm) Width 3245(mm) 3030(mm) Codal life 25 years 30 years DIMENSIONS OF COACH SHELL
  • 4. ?Washing Line 1. Trip Schedule : After every trip by primary maintenance depot. ? Sick Line 1. Schedule A : Monthly (1 month + 7 days) 2. Schedule B : Quarterly (3 months + 15 days) 3. Schedule C : After 180 days or 6 Months 4. IOH : Every 9 months 5. POH : Every 18 months MAINTENANCE SCHEDULE AND CATEGORY
  • 5. SICK LINE ? Sick line is the workshop for the major and periodical maintenance of the coaches. ? It consists of modern facilities like pit for working under frame And crane for separation of coach & bogie for repair of all type of defects.
  • 6. 1. Wheel and Axle Assembly 2. Bogie Maintenance 3. Buffer Maintenance 4. Air Brake System Maintenance 5. Trolley Maintenance 6. Lifting of Coaches 7. Riding Index WORKS CARRIED OUT IN SICK LINE
  • 7. 1. Width of wheel = 127 mm 2. Wheel Diameter = 915 (new), 825 (condemn) Permissible diameter variation in wheel Coaching ? On same axle – 0.5 mm ? On same bogie – 5.0 mm ? On same coach – 13.0 mm Goods ? On same axle – 0.5 mm ? On same bogie – 13.0 mm ? On same coach – 25.0 mm Fig. 1 Wheel profile (all length dimension are in mm) Wheel and Axle Assembly
  • 8. ?Wheels are fixed on the axle with the help of bearings. ?Like wheel, it is also made up of steel. ?Brake cylinder are attached to axle. ?Braking discs are fixed on the axle Fig. 2 Axle
  • 9. Buffer height adjustment Causes of low buffer height in ICF coaching stock : a) excessive wear of wheel b) Due to loss of proper stiffness of coil spring c) Due to excessive wear on side bearer’s metal & bronze piece. Maximum buffer height = 1105 mm [In empty condition] Minimum buffer height = 1030 mm [In loaded condition] To achieve buffer height a standard size of wooden packing pieces are used which are kept below the Dash Pot Flange on axle Box wings of primary suspension. Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 1. Below 889 up to 863 13 2. Below 863 up to 839 26 3. Below 839 up to 819 38 4. 819 & below 48
  • 10. In Air Brake system compressed air is used for operating the brake system. The locomotive compressor charges the feed pipe and the brake pipes throughout the length of the train. The feed pipe is connected to the auxiliary reservoirs and the brake pipe is connected to the brake cylinders through the distributor valve. Brake application takes place by dropping the pressure in the brake pipe. TYPES: 1. Direct Release System- brakes are released immediately, as soon as releasing of brakes is initiated. 2. Gradguate Release System - brake cylinder pressure can be reduced gradually in steps in proportion to the increase in brake pipe pressure. AIR BRAKE SYSTEM
  • 11. ? Single Pipe Air Brake System:- There is only one pipe called brake pipe running from loco to the brake van in order to get continuity of air for the application & release of brakes. ? Twin Pipe Air Brake System :- In addition to brake pipe, there is one more pipe called feed pipe , running loco to the brake van to charge the auxiliary reservoir continuously to 6 kg/cm2 Types of Gradguate Release System
  • 12. Trolley Maintenance Parts of Trolley 1. Trolley Frame 2. Center pivot 3. Side Bearing 4. Brake Cylinder Fig. 3 Trolley
  • 13. Lifting of coaches Require tools and equipments 1. With the use of Mechanical Jacks 2. With the use of Hydraulic Jacks 3. With the use of Electrical operated Travelling Crane 4. With the use of Whiting Jacks
  • 14. PLATFORM TRAIN DUTY ? Rolling In ?Rolling out ?Axle box feeling ?Brake Power Certificate ?Safe to Run
  • 15. ROLLING IN/ROLLING OUT When train enters in station Examiner staff take up positions on both sides inspect the train enters at the speed of 8 Km/hr ?Whistling sound of hot axle boxes. ? Any hanging part or loose fitting of vehicle. ?Any component or spring suspension bracket loose/broken. ? Abnormal behaviour of vehicle.
  • 16. Axle box feeling ?After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is checked by touching with hand ?Temp. is found high then it is checked by the temp. gun which gives exact temp. ?If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and coach is sent to workshop
  • 17. BRAKE POWER Certificate ? This certificate is jointly signed by Guard , Driver, and C&W supervisor. ?The incoming driver shall handover the brake power certificate to Reliving driver or Deposit it the nominated authority, who will give it to the outgoing Driver. ?The outgoing driver and guard will satisfy themselves from the listed coach numbers that the Brake Power Certificate pertains to their train.
  • 18. Safe to run If all of above factors like no hanging parts brakes are working correctly the temp of axle box is with in range and the train is in good and safe condition of running then the train is announced as safe to run.
  • 19. Riding is a quality of comfort experienced by passenger, depends not only upon acceleration, rate of change of acceleration & vibration but also some other factors as like noise, moisture temperature etc. Ride Index = 10 0.896 ∑ ?3 ∑? ?(?) b : Amplitude of acceleration f : Frequency of acceleration F(f) : a correction factor dependent on the frequency Ride index for ICF: <3.5 for LHB<2.75 RIDING INDEX
  • 20. THANK YOU ALL FOR YOUR KIND ATTENTION