Personal Information
Organization / Workplace
Delhi, India India
Occupation
.HSE Admin cum Officer
Industry
Real Estate/ Construction / Architecture
About
Looking for a New Job.
Contact Details
Tags
concrete pump checks on arrival to site prior to s
gas
sewerage
falling materials
work at height
see it
say it
sort it
dont walk by
1 purpose
worker struck by vehicle
reversing vehicles
workers in plant operating radius
very high risk of fatality
plant reversing risk of serious injury to pede
incident due to use of defective plant or associ
operator visibility
plant / pedestrian interaction
failure due to use of un-certificated plant
water
telecoms
access to work areas by personnel and plant. mater
project health
safety
and environmental plan
prevent vertically stored objects from sliding or
ensure stability of piles of products/materials
worker competency
manual handling
prior to / at site delivery hazardous substances
grader and roller operation (plant operator) ope
removal of waste concrete and rebar truck operat
use of hand held breakers
undertaking breaking works manual operation usin
demolition (supervision) plant operations around
unauthorized use of plant by untrained personnel
collision with plant and live traffic within sit
workers struck by working plant
demolition of concrete structure excavator break
plant operation supervision plant operations aro
plant checks on arrival to site prior to site acce
etc.
ducting
plant operator unable to see task screen cover
lift shafts
rupture/failure in pipe lines during testing
uncontrolled stored energy release
piling rig checks on arrival to site prior to use
pressure testing high pressure to pipework
12 sheet piling operations (temporary works) risk
sheet piling rig checks on arrival to site prior t
13 initial project site office set-up risk assessm
inadequate signage to test area
signage to test area personnel in area unautho
worker struck by high pressure water release
working adjacent to public areas vehicles/plant
workers struck by flying materials
septic tank excavation etc. works at height (offic
establishing exclusion zones personnel in area
disposal of used/empty containers
emergency procedures action to be taken in an em
use of substances and chemicals on site use of s
grader /roller checks on arrival to site prior to
unauthorized use of mewp by untrained personnel
operators climbing onto hand rails
collision with other plant and live traffic with
workers struck by working mewp
vessels
mewp operation (supervision) mewp operations aro
workers in mewp operating radius
cradle checks on arrival to site prior to use us
pre-use checks of suspended access cradle or platf
collapse of cradle through damage or failure of
cradle operation
fall from height
material fall from height
machine malfunction at height
workers trapped at height
planned confined space work in areas where live se
prior to entry confined space working deep ex
15 formwork (temporary works) risk assessment temp
formwork installation (classified as temporary str
pipework
access to work areas by personnel and plant. scaff
scaffold design and erection standards (classifie
17 traffic operations - working on live roads risk
road works road delineation diversions clo
vehicles/plant equipment movements for block deliv
forklifts etc. access scaffolding
working platforms for high level block laying loa
19 use of mobile elevated work platforms risk asse
mewp checks on arrival to site prior to site acces
mewp operation (operator) operator competency
bridge decks
ndrc pits
manholes
mewp overturning
tanks
immediately remove packaging upon delivery
provide designated combustible material waste area
conduct fire prevention controls as per fire risk
immediately report and act on non compliances
conduct weekly electrical & fire inspections
workers are you in a safe place to perform your ta
please continue to work safelyand maintain in high
resolve before permitting/ instructing them to wor
10 ways to prevent electrical fire
check & direct
combustible materials store
delivery from store to workplace in building.
temporary fire managed storage area
10 ways for working safely @ heights
poor housekeeping
potential falls
tyre wear-visual check
crane & lifting operations in adverse weather
driving in fog
fire prevention
slips trips falls and bumps
no seat belt
not in cab
no outriggers
no t locks
slope
how to work
responsibility
all clear safe to work
plant-task selection matrix
dont walk by : look-up for hazards
look-up for safety : up to 50% of injures are caus
danger of falling materials
no harness no cover on cradle danger of falling ma
incomplete platform
prepare fire prevention & combustible materials ma
order materials in non combustible packing
construct fully compliant combustible materials st
send combustible materials to combustible stores.
provide temporary fire protection during installat
provide extinguishers and operational firehose ree
provide regular tool box talks
adverse weather
4.15 hse mandatory signage
consultation and communication management hse-01
health
safety and environmental manual
environmental impacts register evaluation
1 = applicable regulation not available)
environmental control measures
1 guide to use risk assessment templates
2 fire risk assessment template risk assessment te
3 emergency management risk assessment templates
4 cofferdams (temporary works) risk assessment tem
5 trial trenches (temporary works) risk assessment
planned excavation in areas where live services ma
prior to works use of excavator for excavating and
use of powered access equipment for assembly of fa
crane checks on arrival to site prior to use acces
crane supervision crane maintenance (revised 06-06
9 lifting operations with tower crane risk assessm
access of tower crane sections to work areas tow
setting up and testing of tower crane lifting of e
10 use of mobile concrete pump risk assessment tem
mobile elevated work platforms
workers live matter
see it !!
say it !!
sort it !!
1. introduction 4 1.1 benefits of construction was
disposal and handling 16 9 inspection and monitori
hse construction environment management plan
12. waste management control plan 25
emergency escape route and assembly
organization chart of response team
fire prevention & protection plan project name
legislation and references
working at heights and fall prevention plan
1. introduction 3 2. scope 3
2 responsibility
2 acronyms and abbreviations 4
monitoring schedule plan
contents 1 purpose 3 2 performance measurement 3 3
temporary works management plan
1 purpose 3 2 responsibility 3 3 kpis and objecti
11 piling operations with rebar cage installation
forklift safety
a forklift is a powered truck used to carry
lift
stack or tier materials. they include pallet truck
rider operated forklifts
fork trucks
or lift trucks.
safe operation & carrying loads
never:
lift loads greater than the capacity of the forkli
unless trained
certified and authorised to do so travel with a bu
unless the forklift is designed specifically for t
competent and authorised to do so use a forklift o
unless it is designed so you can do this stand on
an authorised dealer
or manufacturer has derated the forklift [reduced
except in an emergency. in case of emergency alway
environmental objectives
risks and opportunities
sustainability objectives
health and safely objective
there are several safety tips to follow to help pr
are you good cricket player? join compnay team c
cricket team-poster
tournament 2020
safety man and machine presentation june-2019 rev-
construction plant and equipment
headache cough sore throat fever general feeling
trouble breathing persistent pain or pressure in t
fire risk evaluation & reduction levels
basic risk start point
wet trades
building works & mep 1st fix
superstructure (concrete)
substructure
permanent flss controlled floors removal of packin
arc welding is safe if the unit is properly instal
however
from the primary (input) voltage if you touch a le
the arc welder is very safe. if used improperly
the unit can expose welders to fire
explosion
and retinal burns.
short temper
difficulty concentrating
workplace stress
guide to use risk assessment
work area
including access
use of mobile crane
lift planning
where works are undertaken at
ensure that the works areas
presence of live underground
risk of damage to low depth
hazardous chemicals
hazardous che safety poster
chemicals saffety
3-stop falls
clean up
pick u
stop falls
pick up
2-there's a safe way to do eve
4 - safety is the lifeline of
business operations
aerial lifts are vehicle
aerial lift accidents
could face falls
broken bone
brakes and wheel chocks
if working near traffic
use outriggers
if provided.
boom collapse
falling objects
foot & leg protection
forklifts
grinders & saws
flu prevention
hand tools
hazcom
head protection
power cords safety
scaffolding safety
frequent headaches
inability to sleep
5 - clowns belong in the circu
dismantling of edge protection works at height
injury from fall from heights
injury from falling objects
manual handling injuries
use of unsupervised or untrained personnel
maintenance of edge protection adverse weather
edge protection erected for long periods
temporary electric supply for temporary lighting
electric shock or electrocution from incorrect i
work undertaken by incompetent workers
burns from halogen lights
injury from broken glass from halogen lights
works undertaken in areas of low light or night wo
slips and trips
incident due to insufficient lighting
workers blinded by direct light source when movi
emergency lighting power failure workers unabl
installation of distribution boards to work areas
fire
temporary electrics - offices electrical connect
use of substandard electrical fixtures and fitti
use of substandard connections
valve/connection failure
instrument failure resulting in system over-pres
end caps/plugs ejecting under high pressure
weld/seal/fitting failure
flying objects
high pressure water/air injection. emergency pro
emergency procedures not briefed to task workers
poor response in the event of an emergency
re-testing in the event of failure re-testing wi
worker injury due to working on pressurized syst
injury due to failure to ensure adequate pre-che
edge protection design and erection standards (cl
protection specific design
use of unsupervised or untrained personnel to er
edge protection installation (hand rails
boards etc.) to leading edges (classified as temp
boards etc.) to risers and penetrations (classifi
hole protection installation (hand rails
mesh
boards etc.) to lift shafts (classified as tempor
working over other trades
installation of protection
scaffold erected for long periods
worker exposure to direct sun whist working on sca
code of practice c.o.p # 01 fire prevention requi
heat and oxygen) if we remove 1 element
fire will end. fire is a major risk both to person
or you can help start/allow them. in order to mini
it is vital that everyone is aware of the common c
subcontractor and employee cultural issues
is even higher in the g.c.c. and the region. the c
even knowing this the planning
control and management of combustible materials ar
qhse at "company name" construction is given utmos
"company name" construction has the following qhse
hse alert # power cords
safe work practices and tips
moving falling objects safety
never allow people to be below a suspended load at
night work safety
occupational health and fitness to work
reduced visibility for equipment and other
grinders & saws safely use
safe work practices & tips:
non-adherence to colour coding of wiring
incorrect earthing
tripping hazard
damage to unprotected cables
use of incorrectly rated fuses
site generators offices and site temporary su
incident due to incorrect earthing
fuel leakage environmental risk
fuel storage
noise
planned excavation for ndrc pit in areas where liv
prior to works use of excavator for excavating ndr
access to work areas by personnel aluminum tower
vehicles and workers in same working area
storage of materials for scaffold
use of plant forklift etc.
tower scaffold design
components and erection standards (classified as
scaffold specific design
aluminium tower scaffold erection and use (classif
dismantling of tower scaffold works at height
maintenance of tower scaffold adverse weather
man and machine interface