Yongin, Gyeonggi-do, Korea Korea, South
My major work experience is developed the simulator for power plant. Especially, I did integrate, test and delivery the simulator. I had participated to develop the all of fossil power plant simulator at Korea by ProTRAX system. Through these projects, I did familiar for the major DCS systems as Siemens, ABB, Emerson, GE. I also interested in the microgrid and smartgrid using the simulation skills.
On the power plant, the enigneering analysis is very important and useful for precomissioning and commissioning plant. The dynamic simulation is one of best solution of engineering analysis. This simulation skill can use from design to commissioning for power plant. The simulator development e...