KCMO Eco Devo
New Downtown Apartment Building
2014 Construction Photos
http://onelightkc.com/
Pulled the shot back to give context to the project as a reminder:
Economic Development affects more than a building’s footprint.
5.12.2014
Check out the awesome blades for cutting footing holes (lower left)
5.08.2014
Formwork and rebar for the footings being installed
5.07.2014
5.05.2014
Holes for the footings begin
4.30.2014
As site construction commences, a photo to show project context:
roof top swimming pool (The Jones) and public art installation, H&R Block HQ,
The KC Rep, Midland Theatre, and Mark Twain Tower
4.28.2014
4.21.2014
Material and equipment staging begins
4.17.2014
Parking Lot demolition and site prep
4.04.2014
Deconstruction of the existing egress stairs and brick paver sidewalk begin
Downtown KCMO -- Project Location Map