際際滷

際際滷Share a Scribd company logo
Kendall Pinder Work Profile
Overview:
An active leader, learner, and mentor in the field of Electrical
Engineering, Substation Operation & Maintenance, Commissioning ,
and Non Destructive Testing (NDT) of Substation Apparatus.
Career High Lights/Committees:
 Attended Numerous IEEE Meetings at Hardly Rd Facility NJ
promoted by Mr. Ron Quade
 Attended Numerous Doble Conferences and Classes
 Sat on numerous Substation Committees:
 Strategic Maintenance 69kV and above
 Substation NERC Maintenance and adherence
 Critical Equipment /asset and ID and planning
 5&10 Year Load impact transformer ID and Change out
 Substation Testing Procedures and Protocols
Major Projects:
 Storm Sandy with PSEG in NJ
 138 to 230KV Upgrades from PA to NY (22 plus Substations)
 Critical load plan via transformer re-allocation
 LTC- Maintenance and change out Program
 Manage the largest NDT Testing group in USA 20 plus employees
Safety First-Safety Always
1
Power Transformer Testing
Acceptance test 230-34.5kV Transformer
Pre-Acceptance test:
 Dew Point < 0.5%
 Insulation resistance
 Physical Inspection
 Impact Recorder
 Bushings C1 &C2
Safety First-Safety Always
2
Power Transformer Testing Hands on
Experience using various test sets
Doble, Leakage Reactance, SFRA, Winding Resistance, Meggar
Safety First-Safety Always
3
YY 3 230kV SMITH Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
Safety First-Safety Always
4
Single  500kV SIEMENS Auto Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
Safety First-Safety Always
5
3 Single Tank 230kV HYUNDI Auto Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
6
Safety First-Safety Always
Testing of an water Cooled Arc
Furnace Transformer
Water cooled arc furnace transformer; coolant water used must be
pure and ionized or CL will be high
7
Safety First-Safety Always
Testing of an water Cooled Arc
Furnace Transformer
Commissioning Test: TTR, Double PF, SFRA, Leakage, Winding
Resistance, Insulation Resistance, Excitation, Alarms
8
Safety First-Safety Always
Worked on many different types of LTCs
Rebuilt/Maintenance/Changing of
reversing and contact finger on the
TLH-21 Allis Chalmers LTC.Planed
Outage, ID parts, scheduled crews,
Maintained, Commissioned and test
9
Safety First-Safety Always
Profile
Maintenance/Changing reversing and
contact finger on the UZD LTC
10
Safety First-Safety Always
Profile
Emergency Corrective
Maintenance on a Waukesha
UZD load tap changer,
replacing reversing switch and
contacts very common with
this type of LTC.Fault was
identified by loss of one phase
on the distribution lineI ID
the problem and made
corrective action to the
installation process of the
reversing switch.
11
Safety First-Safety Always
Worked on many Transformer LTC
Problems
Investigating and correcting
problems on a GE LR65 LTC
Broken Support Rod on a GE LR65
LTC as a result bad mechanism
timing and coordination
12
Safety First-Safety Always
Transformer Commissioning and Processing
Always check CT wells/
cabinet to ensure that correct
torque and to address and
correcting oil leaks (230-
34.5kV 150MVA TX)
Safety First-Safety Always 13
Transformer Lock Out Relay Test
Critical Testing of the lock-out (68) relay on a Vacuum Type LTC..Before
filling of the LTC
Safety First-Safety Always 14
Emergency Transformer Change out
Emergency Removal, replacement, and commissioning of
10 MVA bank
15
Safety First-Safety Always
Profile
Emergency Removal, replacement, and commissioning of
10 MVA bank
Safety First-Safety Always 16
Bushing Change out U-Type and degrading
program
U-Type Bushing replacement project
Safety First-Safety Always 17
Transformer High side bushing
Bottom connected
Prep for 24hrs standing in rack to ensure paper is
immersed in oil before testing
18
Safety First-Safety Always
Profile
Draw Lead Bushing replacement project
Safety First-Safety Always 19
Breaker Projects: Maintenance, Commissioning,
Emergency: GCB/VCB/OCB/ACB
Maintenance/Repair 230kV S&C
circuit switcher combo with a gang
operated disconnect.
20
Safety First-Safety Always
Profile
Maintenance on an ABB 230kV
Single pressure (SP) puffer type
circuit breaker with AHMA
hydraulic-spring mechanism
21Safety First-Safety Always
Profile
Corrective Maintenance on
ABB SF6 48PM.
Degasification, changing
interrupters, and bushings
22
Safety First-Safety Always
Profile
Corrective Maintenance on a GE FKA 339 (3000amp),
replacing bushings, bullets, and interrupters
Safety First-Safety Always 23
Profile
Corrective Maintenance on a GE
FKA 339 (3000amp), replacing
bushings, bullets, and interrupters
24
Safety First-Safety Always
Profile
Corrective Maintenance on a GE
FKA 339 (3000amp), replacing
bushings, bullets, and interrupters
25
Safety First-Safety Always
Profile
Corrective Maintenance on a GE FKA 339 (3000amp),
replacing bushings, bullets, and interrupters
Safety First-Safety Always 26
Profile
Doble Testing and timing of
S&C circuit switcher
Safety First-Safety Always 27
GIS-Substation
Timing and Doble testing of a
230kV SF6 encapsulated bus
system
Safety First-Safety Always
28
GCB Commissioning, Testing, Gas
Gassing, Timing, CTs, Doble
testing of a 340kV SF6 ABB
GCB
Safety First-Safety Always
29
GCB Commissioning, Testing, Gas
Gassing, mech placement, Timing, CTs,
Doble testing of a 230kV SF6 ABB GCB
Safety First-Safety Always
30
GCB Commissioning, Testing, Gas
Gassing, mech placement, Timing, CTs,
Doble testing of a 230kV SF6 ABB GCB
Safety First-Safety Always
31
Profile
Corrective Maintenance on 230KV gang
operated disconnect
Safety First-Safety Always 32
Mobile Substation Scheduling, Commissioning,
Testing, and Maintenance
230-34.5kV Mobile substation.
Test and commissioned
Safety First-Safety Always 33
Profile
Commission of 20MVA 34.5-
12/7.2kV mobile substation
Safety First-Safety Always 34
Profile
Commission of 20MVA 34.5-
12/7.2kV mobile substation
Safety First-Safety Always 35
Profile
Emergency Removal,
replacement, and
commissioning of
24MVA Mobile
Substation
Safety First-Safety Always 36
Profile
Commissioning of
New 24MVA Mobile
Substation
Safety First-Safety Always 37
Protection and Control and Relays
Commissioning and Testing
Functional Trip checks, Load angle checks, secondary
injection during commission of a new 34.5kv ABB breaker
Safety First-Safety Always
38
Protection and Control and Relays
Commissioning and Testing
Electromechanical Relays maintenance testing
Safety First-Safety Always
39
Commissioning of
SEL 251/351 and
487 SEL relays
Safety First-Safety Always
40
Profile
Kelman Portable DGA analysis
Safety First-Safety Always 41
Substation Battery Commission Routine
Maintenance and Testing
Impedance, Specific Gravity, 80% capacity Load Testing and
Commissioning
Safety First-Safety Always
42
Substation Battery Commission Routine
Maintenance and Testing
TORKEL840/860 - Battery Load
Tester - Megger
80% capacity Load Testing and
Commissioning
Safety First-Safety Always
43
Miscellaneous Projects
Replacement/Repairs 230kV Bus
work. No weep holes resulted Thermal
expansion that compromised A
structure
Safety First-Safety Always 44
Miscellaneous Projects
Commissioning and testing
230 Kv double grounded
WYE capacitor bank, GCB
45Safety First-Safety Always
Miscellaneous Projects
Testing,
Commissioning, and
phasing Cable
Inspecting Ground
Sleeve cable and
back bone for new
subdivision
Safety First-Safety Always 46
Miscellaneous Projects
Installation of ground sleeve,
cables, Load Break Elbows
phasing
Safety First-Safety Always 47
Miscellaneous Projects
Repairing faulty 34.5kV 1000kcmil
cable, L.A.s, and insulators terminated
into MOD Sub
Safety First-Safety Always 48
Miscellaneous Projects
ABB Type ESVA 12kV vacuum type circuit breaker
Replace bushings, interrupters, and test
Safety First-Safety Always 49
Thank You
Safety First-Safety Always 50

More Related Content

Electrical Power Experience1

  • 1. Kendall Pinder Work Profile Overview: An active leader, learner, and mentor in the field of Electrical Engineering, Substation Operation & Maintenance, Commissioning , and Non Destructive Testing (NDT) of Substation Apparatus. Career High Lights/Committees: Attended Numerous IEEE Meetings at Hardly Rd Facility NJ promoted by Mr. Ron Quade Attended Numerous Doble Conferences and Classes Sat on numerous Substation Committees: Strategic Maintenance 69kV and above Substation NERC Maintenance and adherence Critical Equipment /asset and ID and planning 5&10 Year Load impact transformer ID and Change out Substation Testing Procedures and Protocols Major Projects: Storm Sandy with PSEG in NJ 138 to 230KV Upgrades from PA to NY (22 plus Substations) Critical load plan via transformer re-allocation LTC- Maintenance and change out Program Manage the largest NDT Testing group in USA 20 plus employees Safety First-Safety Always 1
  • 2. Power Transformer Testing Acceptance test 230-34.5kV Transformer Pre-Acceptance test: Dew Point < 0.5% Insulation resistance Physical Inspection Impact Recorder Bushings C1 &C2 Safety First-Safety Always 2
  • 3. Power Transformer Testing Hands on Experience using various test sets Doble, Leakage Reactance, SFRA, Winding Resistance, Meggar Safety First-Safety Always 3
  • 4. YY 3 230kV SMITH Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals Safety First-Safety Always 4
  • 5. Single 500kV SIEMENS Auto Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals Safety First-Safety Always 5
  • 6. 3 Single Tank 230kV HYUNDI Auto Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals 6 Safety First-Safety Always
  • 7. Testing of an water Cooled Arc Furnace Transformer Water cooled arc furnace transformer; coolant water used must be pure and ionized or CL will be high 7 Safety First-Safety Always
  • 8. Testing of an water Cooled Arc Furnace Transformer Commissioning Test: TTR, Double PF, SFRA, Leakage, Winding Resistance, Insulation Resistance, Excitation, Alarms 8 Safety First-Safety Always
  • 9. Worked on many different types of LTCs Rebuilt/Maintenance/Changing of reversing and contact finger on the TLH-21 Allis Chalmers LTC.Planed Outage, ID parts, scheduled crews, Maintained, Commissioned and test 9 Safety First-Safety Always
  • 10. Profile Maintenance/Changing reversing and contact finger on the UZD LTC 10 Safety First-Safety Always
  • 11. Profile Emergency Corrective Maintenance on a Waukesha UZD load tap changer, replacing reversing switch and contacts very common with this type of LTC.Fault was identified by loss of one phase on the distribution lineI ID the problem and made corrective action to the installation process of the reversing switch. 11 Safety First-Safety Always
  • 12. Worked on many Transformer LTC Problems Investigating and correcting problems on a GE LR65 LTC Broken Support Rod on a GE LR65 LTC as a result bad mechanism timing and coordination 12 Safety First-Safety Always
  • 13. Transformer Commissioning and Processing Always check CT wells/ cabinet to ensure that correct torque and to address and correcting oil leaks (230- 34.5kV 150MVA TX) Safety First-Safety Always 13
  • 14. Transformer Lock Out Relay Test Critical Testing of the lock-out (68) relay on a Vacuum Type LTC..Before filling of the LTC Safety First-Safety Always 14
  • 15. Emergency Transformer Change out Emergency Removal, replacement, and commissioning of 10 MVA bank 15 Safety First-Safety Always
  • 16. Profile Emergency Removal, replacement, and commissioning of 10 MVA bank Safety First-Safety Always 16
  • 17. Bushing Change out U-Type and degrading program U-Type Bushing replacement project Safety First-Safety Always 17
  • 18. Transformer High side bushing Bottom connected Prep for 24hrs standing in rack to ensure paper is immersed in oil before testing 18 Safety First-Safety Always
  • 19. Profile Draw Lead Bushing replacement project Safety First-Safety Always 19
  • 20. Breaker Projects: Maintenance, Commissioning, Emergency: GCB/VCB/OCB/ACB Maintenance/Repair 230kV S&C circuit switcher combo with a gang operated disconnect. 20 Safety First-Safety Always
  • 21. Profile Maintenance on an ABB 230kV Single pressure (SP) puffer type circuit breaker with AHMA hydraulic-spring mechanism 21Safety First-Safety Always
  • 22. Profile Corrective Maintenance on ABB SF6 48PM. Degasification, changing interrupters, and bushings 22 Safety First-Safety Always
  • 23. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters Safety First-Safety Always 23
  • 24. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters 24 Safety First-Safety Always
  • 25. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters 25 Safety First-Safety Always
  • 26. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters Safety First-Safety Always 26
  • 27. Profile Doble Testing and timing of S&C circuit switcher Safety First-Safety Always 27
  • 28. GIS-Substation Timing and Doble testing of a 230kV SF6 encapsulated bus system Safety First-Safety Always 28
  • 29. GCB Commissioning, Testing, Gas Gassing, Timing, CTs, Doble testing of a 340kV SF6 ABB GCB Safety First-Safety Always 29
  • 30. GCB Commissioning, Testing, Gas Gassing, mech placement, Timing, CTs, Doble testing of a 230kV SF6 ABB GCB Safety First-Safety Always 30
  • 31. GCB Commissioning, Testing, Gas Gassing, mech placement, Timing, CTs, Doble testing of a 230kV SF6 ABB GCB Safety First-Safety Always 31
  • 32. Profile Corrective Maintenance on 230KV gang operated disconnect Safety First-Safety Always 32
  • 33. Mobile Substation Scheduling, Commissioning, Testing, and Maintenance 230-34.5kV Mobile substation. Test and commissioned Safety First-Safety Always 33
  • 34. Profile Commission of 20MVA 34.5- 12/7.2kV mobile substation Safety First-Safety Always 34
  • 35. Profile Commission of 20MVA 34.5- 12/7.2kV mobile substation Safety First-Safety Always 35
  • 36. Profile Emergency Removal, replacement, and commissioning of 24MVA Mobile Substation Safety First-Safety Always 36
  • 37. Profile Commissioning of New 24MVA Mobile Substation Safety First-Safety Always 37
  • 38. Protection and Control and Relays Commissioning and Testing Functional Trip checks, Load angle checks, secondary injection during commission of a new 34.5kv ABB breaker Safety First-Safety Always 38
  • 39. Protection and Control and Relays Commissioning and Testing Electromechanical Relays maintenance testing Safety First-Safety Always 39
  • 40. Commissioning of SEL 251/351 and 487 SEL relays Safety First-Safety Always 40
  • 41. Profile Kelman Portable DGA analysis Safety First-Safety Always 41
  • 42. Substation Battery Commission Routine Maintenance and Testing Impedance, Specific Gravity, 80% capacity Load Testing and Commissioning Safety First-Safety Always 42
  • 43. Substation Battery Commission Routine Maintenance and Testing TORKEL840/860 - Battery Load Tester - Megger 80% capacity Load Testing and Commissioning Safety First-Safety Always 43
  • 44. Miscellaneous Projects Replacement/Repairs 230kV Bus work. No weep holes resulted Thermal expansion that compromised A structure Safety First-Safety Always 44
  • 45. Miscellaneous Projects Commissioning and testing 230 Kv double grounded WYE capacitor bank, GCB 45Safety First-Safety Always
  • 46. Miscellaneous Projects Testing, Commissioning, and phasing Cable Inspecting Ground Sleeve cable and back bone for new subdivision Safety First-Safety Always 46
  • 47. Miscellaneous Projects Installation of ground sleeve, cables, Load Break Elbows phasing Safety First-Safety Always 47
  • 48. Miscellaneous Projects Repairing faulty 34.5kV 1000kcmil cable, L.A.s, and insulators terminated into MOD Sub Safety First-Safety Always 48
  • 49. Miscellaneous Projects ABB Type ESVA 12kV vacuum type circuit breaker Replace bushings, interrupters, and test Safety First-Safety Always 49