Personal Information
Organization / Workplace
Madrid Area, Spain Spain
Occupation
at AF-Mercados EMI
Industry
Energy / Oil
Website
http://www.ceb.lk
About
More than 15 years experiences in the Design/Construction of Transmission/ Distribution lines in Sri lanka.
Activities in Design:
• Selection of transmission line routes;
• Profile Design
• Determination of basic line parameters;
• Sag & tension calculations;
• Tower loadings and loading trees;
• Tower Design by using PLS Tower Software;
• Plan & profile, drawings,3D Modeling by using PLS CADD Software;
• Preparation of Line & Material Schedule;
• Review of Soil Report,Recommendation for Foundation Type
• Foundation Design (Shallow Depth Foundation, Pile Foundation etc)
• Stub Setting Calculations;
• Preparation of stringing charts;
• Rearrangement of existing li
Contact Details
Users following Kumara Chandana