Work Description:
Produced shop drawing in Structure discipline using Bocad / PDMS and Auto Cad system. Review and study structure drawing base on client drawing. Preparation of material take-off for fitting and others miscellaneous items. Preparation material cutting plan. Preparation NDE drawing. Revised drawing by client comment. Preparation as-built drawing.
Preparation tie-down drawing.
List of project at AKER SOLUTION (2014 to currently)
1. BERGADING details design
List of project at THHE Fabricator Sdn. Bhd. (2012 to 2014)
1. WEST DESARU EPS DEVELOPMENT PETROFAC (MALAYSIA-PM304) LIMITED
2. LAILA FIELD DEVELOPMENT PROJECT & D12 FIELD DEVELOPMENT
PROJECT
3. EPCC OF PERMAS PRODU...