• MATINDOK GAS DEVELOPMENT PROGRAM (EPCIC)
(January 2014 – Present )
Client : PT Pertamina EP
Responsibilities:
1. Prepare technical clarification of ITB document (incl. Feed doc/dwg) in early project
2. Check Interdicipline documents and drawings
3. Prepare document electrical project specification and Datasheet
4. Prepare Electrical Calculation document
5. Review electrical drawing such as one line diagram, schematic, typical installation, layout, etc.
6. Prepare electrical material requsition
7. Prepare TBE
8. Review technical vendor proposal
9. Review vendor document and drawing
• PCSB Blanket Engineering Service
Client: Petronas Carigali Sdn Bhd
Responsibilities:
1. Provid...