Role of work:
• Preparation of Heat Load Calculation,
• Preparation of Concept Layout, Tender Dwg. GFC Dwg. Equipment Layout. VRV Piping, Schematics Layout , Ventilation Ducting
• Preparation of Co-ordinations drawings connecting all MEP works, Material Quantity
• HVAC Base Building Design.
• Checking the quality work on site
Projects Handled:
• JDA –BANGLORE ( 3 Lack Sq.ft.)
• KPMG-KOCHI ( 6.5 Thousand Sq.ft.)
• DOLBY – MUMABI (5.5 Thousand Sq.ft.)
• PIZZA EXPRESS- MUMABI,THANE (11 Thousand Sq.ft.)
• KELLOGGS INDIA PVT.LTD. MUMABI (26 Thousand Sq.ft.)
• DOW CHEMICAL @ NOIDA (6 Thousand Sq.ft.)
• COMPUCOM –PUNE (37 Thousand Sq.ft.)
• LUPIN LAB- ...