The document presents a project to automate tollgates. It aims to automatically track vehicle movement, record time and vehicle details to deduct toll fees. Key aspects include using RFID tags on vehicles to identify them at toll plazas and deduct fees electronically. The system is designed to save time by reducing queues and manual processes while improving traffic flow. It uses hardware like an RF receiver and microcontroller along with software modules for administration, vehicle registration and tracking details.
The document presents a project on automating tollgates. It discusses implementing a system to automatically track vehicle movement through tollgates using RFID tags, record details like owner name and vehicle model, and deduct toll fees. The system aims to save time and reduce traffic by automating the toll collection process. It consists of modules for administration, vehicle registration, and tracking vehicle details. Hardware requirements include a processor, RAM, and hard disk, while software requirements include Java, Tomcat web server, and MySQL database. The system architecture and input/output design are also covered, along with screenshots of the user interface. Testing procedures and conclusions state the goals of the automation project have been achieved by creating a user-friendly system.
This document provides an overview and outline of an HR Management System project. It includes sections on the current problems with the existing system, the proposed new system, key modules like Time Management and ATS (Apprentice Training), and technologies used like .NET, C#, Oracle 11g, and the Spiral model of software development. Feasibility aspects like technical, economic and operational feasibility are also summarized. The goal of the project is to develop a centralized web-based system to replace manual and decentralized existing systems for better management of employee attendance, leave, payroll and student training functions.
Arunkumar is a software engineer with 3.9 years of experience in automotive software development. He has worked on projects involving fuel filter drain functions, fuel sensor drivers, rail pressure monitoring, and fuel economy assistance. His skills include requirements engineering, model-based design, unit testing, and automotive standards like AUTOSAR. He is seeking new opportunities to apply his expertise in embedded systems, C/C++, automotive protocols, and the software development process.
This document summarizes a customer relationship management (CRM) system created for an automobile industry. The objectives of the CRM system are to simplify marketing and sales processes and improve customer service. The system allows users to manage customer lists and records, automobile parts, service tasks, insurance policies, and billing. It also includes modules for user login/authentication, data entry and retrieval, report generation, and testing to ensure proper functionality. The CRM system was developed using technologies like Java, SQL Server, and follows a typical software development life cycle process.
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
Ìý
Identified huge error count and US$1.7M excess expense in product engineering and product development; Spearheaded from scratch product roadmap and end-to-end engineering and deployment of a custom novel software for automatic creation of error-free verification infrastructure for a customizable Network-interconnect, across 6 global teams, saved 70+ man hours per integration and testing cycle and reduced time-to-first-test by 60%, resulting in an estimated annual savings of US$4.5M in purchased product licenses and 100% reduction in error-count in engineering process. Enabled a 4-member cross-cultural global team in Seoul for 6+ months for E2E-auto-testbench product during its’ adoption, prototype testing, and life cycle. Conducted 120+ user interviews, market analysis, customer research to define key product requirements for new features resulting in 100% user adoption, 80% increase in user satisfaction. Received appreciation award from VP of Engineering, Samsung Memory Solutions.
Disclaimer: - The slides presented here are a minimised version of the actual detailed content/implementation/publication presented to the stakeholders.
If the originals are needed, they will be provided based on mutual agreement.
(All Rights Reserved)
An e-commerce application that enables two types of users to use the digitized way for toll-tax bill pay settlements. Admin is a user who has authority to create and delete an operator and on the other hand users as operators keep track of vehicle details and generate bills.
This document describes a proposed gate pass management system to improve upon existing paper-based systems. It outlines the existing system's disadvantages like lack of authentication and proposes a new computerized system with modules for admin, manager, gate pass, guard, vehicle, and person to overcome these issues. The proposed system would use technologies like Java, Spring Tools Suite for development and require hardware like Intel processors, 1GB RAM, and 2GB storage. It is intended to provide user satisfaction, time efficiency, easy inquiry and a more secure method for managing gate passes compared to current paper registers.
This document outlines an inventory management system project. It includes sections on objectives, technical specifications using HTML, PHP and databases, software used including Visual Studio Code and XAMPP, a 3-tier architecture, modules for inventory, services, customers etc., a use case diagram, debugging and testing, and future scope. The system allows adding, deleting and viewing inventory, services, customers and generating quotations and invoices for accounting.
Marwa Ezzat Ahmed Ali is seeking a challenging position as a testing team leader. She has over 10 years of experience in software testing and quality assurance. She has worked on projects in various industries including automotive, banking, and telecom. Her technical skills include Java, C++, Matlab, and testing tools such as HP ALM, Testlink, and Bugzilla. She is ISTQB certified at the foundation and advanced levels.
This document discusses deployment pipelines and best practices for continuous delivery. It covers topics like the basic components of a deployment pipeline including different stages like commit, testing, and release. It also discusses practices for deployment pipeline like deploying the same way to every environment, automating deployments, and making the deployment process idempotent. Scripting tools for automating deployments and metrics for monitoring pipelines are also covered at a high level.
Test automation efforts often result in failure or lack of long term commitment due to complexity and costs associated with maintaining test scripts. When testers find it difficult to construct, execute, or update scripts, expectations of management are not realized, resullting in project termination. We avoided test automation failure by utilizing an innovative framework which reduces maintenance burdens associated with test scripts while increases user productivity.
Kent Melville and Annie Wise from Inductive Automation, and water/wastewater controls professionals Henry Palechek and Jason Hamlin, cover 10 steps for building a sustainable SCADA system that survives and even thrives using only your operational expenditure budget.
You'll learn about:
• What type of hardware and operating systems to use
• Utilizing smart devices and MQTT
• The advantages of server-centric architecture and web-based deployment
• Rapid development with templates and UDTs
• Powerful alarming and reporting tools
• And more
Kent Melville and Annie Wise from Inductive Automation, and water/wastewater controls professionals Henry Palechek and Jason Hamlin, cover 10 steps for building a sustainable SCADA system that survives and even thrives using only your operational expenditure budget.
You'll learn about:
• What type of hardware and operating systems to use
• Utilizing smart devices and MQTT
• The advantages of server-centric architecture and web-based deployment
• Rapid development with templates and UDTs
• Powerful alarming and reporting tools
• And more
This document describes Tanmay Acharya's loan management system project. It includes:
1. An introduction that outlines the purpose, scope, definitions, overview and waterfall process model of the project.
2. Sections on the existing system, proposed system, feasibility study, hardware/software requirements, entity relationship diagram, data flow diagrams, input screens and output screens.
3. The feasibility study evaluates the technical, economic and operational feasibility of the proposed system.
4. The hardware and software requirements include minimum specifications for servers, clients, and required software.
This presentation includes:
- Why performance matters for digital businesses?
- Use Cases for performance / load testing
- Load Test Design Considerations
- Tools and Technologies
- Methodology and Approach
- Activities and Deliverables
- Load Testing Success Stories
Questions for successful test automation projectsDaniel Ionita
Ìý
Test automation is not only about coding. Successful test automation involves critical thinking and clarity of objectives before actually beginning development. This material provides guidance in putting some of the right questions and how to think as for having an efficient and effective test automation in the context of your project.
Voting Solutions For All People: UX Case StudyJon Fox
Ìý
The Voting Solutions for All People (VSAP) was developed by the Registrar-Recorder/County Clerk (RR/CC) in 2009 to address an aging voting system and an increasingly large and complex electorate. The project seeks a collaborative approach to voting system design that will put voters at the center and maximize stakeholder participation.
Through field research and coalition building, the RR/CC has pioneered a voter-centered approach to voting system design and development.
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...Fatima Qayyum
Ìý
This document describes a low-cost IoT application to monitor urban traffic using wireless sensors and GSM technology. The system aims to address issues like traffic congestion, accidents, pollution and fuel consumption. It implements a distributed multilayer model using Arduino boards, laser sensors and a GSM module. Real-time traffic data is collected and stored in a database. Data mining techniques are then applied using the Pentaho platform to analyze traffic trends and patterns under different conditions. Functional and unit testing was performed to validate the system. The results from the deployment provide valuable traffic insights to help address congestion problems.
Why test automation is getting more difficult, and what can be done about it. This slides are from a presentation by Group Director, Product Management at TestPlant, Gordon McKeown, which was presented at the Northern Lights conference in Manchester in April 2016.
This document discusses key factors for ensuring the success of a test automation framework (TAF). It outlines various elements that should be considered when setting up a TAF, including supporting different application types like web, mobile, and APIs. Important TAF features that are described include being keyword/data-driven, handling test flows and errors, and generating execution and historical reports. The document also provides recommendations for integrating the TAF with continuous integration systems for scheduling tests, notifications, load balancing and distributed execution to save time.
Choosing the Best Approach for Monitoring Citrix User Experience: Should You ...eG Innovations
Ìý
A great user experience is key for the success of any Citrix application virtualization or desktop virtualization initiative. To ensure user satisfaction and productivity, Citrix administrators should monitor the user experience proactively, detect times when users are likely to be seeing slowness, pinpoint the cause of such issues and initiate corrective actions to quickly resolve issues, thereby ensuring user satisfaction and productivity.
A key question is where should the monitoring of the Citrix infrastructure be performed from - the network, the server infrastructure, or from the client?
View this presentation to:
• Learn about the different approaches to Citrix user experience monitoring, their benefits and shortcomings
• Hear about a hybrid approach that provides the most cost-effective yet comprehensive monitoring for a Citrix server farm
• See a live demonstration of the hybrid Citrix monitoring approach and its ability to cover all aspects of Citrix user experience
This presentation provides an overview of load testing and the load testing tool LoadRunner. It discusses what automation testing and load testing are, why LoadRunner is used, the applications it supports, its architecture including components like Virtual User Generator, Controller, and Analyzer. Benefits of automation testing for companies like reducing costs and increasing coverage are also highlighted. The presentation contains an agenda and slides on various load testing related topics.
ATAGTR2017 Unified APM: The new age performance monitoring for production sys...Agile Testing Alliance
Ìý
The presentation on Unified APM: The new age performance monitoring for production systems was done during #ATAGTR2017, one of the largest global testing conference. All copyright belongs to the author.
Author and presenter : Kaushik Raghavan
Sangeetha Gopalkrishnan has over 1 year of experience in ASIC design and verification. She has skills in Verilog, SystemVerilog, and EDA tools like VCS and ModelSim. Her experience includes designing RTL modules for unified cache and DMA engine and verifying designs for real-time clock, dual-port RAM, SPI master core, and UART using verification methodologies like coverage-driven verification. She is looking for opportunities in ASIC design and verification.
1) The document discusses DevOps practices presented at India Agile Week 2013. It describes challenges of manual development and operations processes, including delays, failures, and finger pointing between teams.
2) DevOps aims to streamline the software development lifecycle by involving operations throughout the process. This is achieved by establishing a collaborative culture, adding operations stories to the product backlog, and having operations participate in sprints.
3) Automating tools and workflows provides visibility across the entire release and deployment pipeline. This allows for traceability, continuous integration and deployment, and standardized environments and processes.
This document provides an overview and introduction to robotic process automation (RPA). It defines RPA as using software "robots" to capture and interpret existing applications in order to automate transactions, manipulate data, and communicate between systems. The key benefits of RPA include cost savings, improved accuracy, scalability, and increased efficiency. The document discusses the RPA landscape and some of the major RPA tools on the market, including UiPath, Blue Prism, and Automation Anywhere.
This document outlines an inventory management system project. It includes sections on objectives, technical specifications using HTML, PHP and databases, software used including Visual Studio Code and XAMPP, a 3-tier architecture, modules for inventory, services, customers etc., a use case diagram, debugging and testing, and future scope. The system allows adding, deleting and viewing inventory, services, customers and generating quotations and invoices for accounting.
Marwa Ezzat Ahmed Ali is seeking a challenging position as a testing team leader. She has over 10 years of experience in software testing and quality assurance. She has worked on projects in various industries including automotive, banking, and telecom. Her technical skills include Java, C++, Matlab, and testing tools such as HP ALM, Testlink, and Bugzilla. She is ISTQB certified at the foundation and advanced levels.
This document discusses deployment pipelines and best practices for continuous delivery. It covers topics like the basic components of a deployment pipeline including different stages like commit, testing, and release. It also discusses practices for deployment pipeline like deploying the same way to every environment, automating deployments, and making the deployment process idempotent. Scripting tools for automating deployments and metrics for monitoring pipelines are also covered at a high level.
Test automation efforts often result in failure or lack of long term commitment due to complexity and costs associated with maintaining test scripts. When testers find it difficult to construct, execute, or update scripts, expectations of management are not realized, resullting in project termination. We avoided test automation failure by utilizing an innovative framework which reduces maintenance burdens associated with test scripts while increases user productivity.
Kent Melville and Annie Wise from Inductive Automation, and water/wastewater controls professionals Henry Palechek and Jason Hamlin, cover 10 steps for building a sustainable SCADA system that survives and even thrives using only your operational expenditure budget.
You'll learn about:
• What type of hardware and operating systems to use
• Utilizing smart devices and MQTT
• The advantages of server-centric architecture and web-based deployment
• Rapid development with templates and UDTs
• Powerful alarming and reporting tools
• And more
Kent Melville and Annie Wise from Inductive Automation, and water/wastewater controls professionals Henry Palechek and Jason Hamlin, cover 10 steps for building a sustainable SCADA system that survives and even thrives using only your operational expenditure budget.
You'll learn about:
• What type of hardware and operating systems to use
• Utilizing smart devices and MQTT
• The advantages of server-centric architecture and web-based deployment
• Rapid development with templates and UDTs
• Powerful alarming and reporting tools
• And more
This document describes Tanmay Acharya's loan management system project. It includes:
1. An introduction that outlines the purpose, scope, definitions, overview and waterfall process model of the project.
2. Sections on the existing system, proposed system, feasibility study, hardware/software requirements, entity relationship diagram, data flow diagrams, input screens and output screens.
3. The feasibility study evaluates the technical, economic and operational feasibility of the proposed system.
4. The hardware and software requirements include minimum specifications for servers, clients, and required software.
This presentation includes:
- Why performance matters for digital businesses?
- Use Cases for performance / load testing
- Load Test Design Considerations
- Tools and Technologies
- Methodology and Approach
- Activities and Deliverables
- Load Testing Success Stories
Questions for successful test automation projectsDaniel Ionita
Ìý
Test automation is not only about coding. Successful test automation involves critical thinking and clarity of objectives before actually beginning development. This material provides guidance in putting some of the right questions and how to think as for having an efficient and effective test automation in the context of your project.
Voting Solutions For All People: UX Case StudyJon Fox
Ìý
The Voting Solutions for All People (VSAP) was developed by the Registrar-Recorder/County Clerk (RR/CC) in 2009 to address an aging voting system and an increasingly large and complex electorate. The project seeks a collaborative approach to voting system design that will put voters at the center and maximize stakeholder participation.
Through field research and coalition building, the RR/CC has pioneered a voter-centered approach to voting system design and development.
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...Fatima Qayyum
Ìý
This document describes a low-cost IoT application to monitor urban traffic using wireless sensors and GSM technology. The system aims to address issues like traffic congestion, accidents, pollution and fuel consumption. It implements a distributed multilayer model using Arduino boards, laser sensors and a GSM module. Real-time traffic data is collected and stored in a database. Data mining techniques are then applied using the Pentaho platform to analyze traffic trends and patterns under different conditions. Functional and unit testing was performed to validate the system. The results from the deployment provide valuable traffic insights to help address congestion problems.
Why test automation is getting more difficult, and what can be done about it. This slides are from a presentation by Group Director, Product Management at TestPlant, Gordon McKeown, which was presented at the Northern Lights conference in Manchester in April 2016.
This document discusses key factors for ensuring the success of a test automation framework (TAF). It outlines various elements that should be considered when setting up a TAF, including supporting different application types like web, mobile, and APIs. Important TAF features that are described include being keyword/data-driven, handling test flows and errors, and generating execution and historical reports. The document also provides recommendations for integrating the TAF with continuous integration systems for scheduling tests, notifications, load balancing and distributed execution to save time.
Choosing the Best Approach for Monitoring Citrix User Experience: Should You ...eG Innovations
Ìý
A great user experience is key for the success of any Citrix application virtualization or desktop virtualization initiative. To ensure user satisfaction and productivity, Citrix administrators should monitor the user experience proactively, detect times when users are likely to be seeing slowness, pinpoint the cause of such issues and initiate corrective actions to quickly resolve issues, thereby ensuring user satisfaction and productivity.
A key question is where should the monitoring of the Citrix infrastructure be performed from - the network, the server infrastructure, or from the client?
View this presentation to:
• Learn about the different approaches to Citrix user experience monitoring, their benefits and shortcomings
• Hear about a hybrid approach that provides the most cost-effective yet comprehensive monitoring for a Citrix server farm
• See a live demonstration of the hybrid Citrix monitoring approach and its ability to cover all aspects of Citrix user experience
This presentation provides an overview of load testing and the load testing tool LoadRunner. It discusses what automation testing and load testing are, why LoadRunner is used, the applications it supports, its architecture including components like Virtual User Generator, Controller, and Analyzer. Benefits of automation testing for companies like reducing costs and increasing coverage are also highlighted. The presentation contains an agenda and slides on various load testing related topics.
ATAGTR2017 Unified APM: The new age performance monitoring for production sys...Agile Testing Alliance
Ìý
The presentation on Unified APM: The new age performance monitoring for production systems was done during #ATAGTR2017, one of the largest global testing conference. All copyright belongs to the author.
Author and presenter : Kaushik Raghavan
Sangeetha Gopalkrishnan has over 1 year of experience in ASIC design and verification. She has skills in Verilog, SystemVerilog, and EDA tools like VCS and ModelSim. Her experience includes designing RTL modules for unified cache and DMA engine and verifying designs for real-time clock, dual-port RAM, SPI master core, and UART using verification methodologies like coverage-driven verification. She is looking for opportunities in ASIC design and verification.
1) The document discusses DevOps practices presented at India Agile Week 2013. It describes challenges of manual development and operations processes, including delays, failures, and finger pointing between teams.
2) DevOps aims to streamline the software development lifecycle by involving operations throughout the process. This is achieved by establishing a collaborative culture, adding operations stories to the product backlog, and having operations participate in sprints.
3) Automating tools and workflows provides visibility across the entire release and deployment pipeline. This allows for traceability, continuous integration and deployment, and standardized environments and processes.
This document provides an overview and introduction to robotic process automation (RPA). It defines RPA as using software "robots" to capture and interpret existing applications in order to automate transactions, manipulate data, and communicate between systems. The key benefits of RPA include cost savings, improved accuracy, scalability, and increased efficiency. The document discusses the RPA landscape and some of the major RPA tools on the market, including UiPath, Blue Prism, and Automation Anywhere.
Latest-Iobit Driver Booster Pro Crack Free Downloadcrackstore786
Ìý
COPY & PASTE LINK👉👉👉 https://crackedstore.co/after-verification-click-go-to-download-page/
About. Driver Booster is a lightweight software application whose purpose is to help you manage outdated drivers for all your devices. The tool ...
COPY & PASTE LINK👉👉👉 https://up-community.net/after-verification-click-go-to-download-page/ Adobe Photoshop Lightroom Crack 2025 for Windows PC gives you everything you need to edit, organize, store, and share your photos across desktop.
Adobe Photoshop CC Crack Download Latest Versionabbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/Adobe Photoshop CC Crack created the potent image editing program 94fbr Adobe Photoshop CC 2025. It is the mainstream technology for
Password Depot 17.2.1 Full Crack Free Download [Latest]abbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/Password Depot Crack is a powerful and easy-to-use password manager software that helps you organize all your passwords for example, credit card or software licenses. This powerful software provides security for your password – in three ways: it securely stores your password, guarantees you access to secure data and helps you get a secure password.
Download iTop VPN Crack Latest Version 2025?abbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/Itop VPN Crack increases download speed with built-in download logic accelerator, resume and schedule downloads.
Download Capcut Pro 5.7.1.2152 Crack Latest Versionabbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/
CapCut 5.7.1 Crack is an advanced version of the popular CapCut PC video editing app, offering premium features for professional-quality ...
https://crackedios.com/after-verification-click-go-to-download-page/
Internet Download Manager (IDM) is a download accelerator to increase download speeds by up to 8 times, resume, organize and schedule downloads. IDM will also repair broken and resume interrupted downloads due to lost connections, network problems, computer shutdowns, or unexpected power outages.
https://crackedios.com/after-verification-click-go-to-download-page/
4K Video Downloader Crack 4.28.0.5600 + License Key [2024]abbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/
4K Video Downloader Crack Free Download allows you to download video, audio, and subtitles from YouTube in high-quality and as fast as your computer and connection. If you want that video on your iPad, iPhone, or other devices, we’ve got you covered. Downloading is simple and straightforward: copy the video link from your browser and click ‘Paste Url.’ Done! Save entire YouTube playlists and channels in MP4, MKV, M4A, MP3, FLV, 3GP.
Wondershare Dr.Fone V13.1.0.19 Final Crack Full Versionabbaskanju3
Ìý
Direct License file Link Below👇 https://click4pc.com/after-verification-click-go-to-download-page/
Wondershare Dr.Fone Crack Free Download 2025. For the former, you need to connect the device to your PC, and then the application will scan its ..
2. INTRODUCTION
• Toll gate Automation is designed to automatically keep track of the vehicle’s movement, record
the time and the details like Owner’s name, date of registration, vehicle model etc.
• This system is very useful for automatic vehicle tracking, time management and also for
automation of Toll gate. This project explains the implementation of Toll Gate Automation which is
a step of monitoring of vehicles, traveling in predetermined routes.
•Then this information about the source (vehicle) is displayed and Toll is deducted and stored for
future use.
3. SYSTEM ANALYSIS
•Existing System :
•First is the traditional manual method where one person collects the money and issues a receipt. There are two
ways of collecting toll tax being in practice at present. other is two way receipt exists for 24 hours
• The other one is Smart Card system where the person needs to show the smart card to the system
installed at the toll tax depot to open the barrier
• Proposed System :
• Each vehicle will be provided by an RF TX tag containing a unique ID. When the vehicle will reach at the toll
booth the RF receiver will detect these RF signals.
• The signals are amplified and are passed to microcontroller.
• Now, with the help of PC interface unit the data collected is passed to PC through serial port.
4. ADVANTAGES
• Automatically keep track of the vehicle’s movement.
• Record the time and the details like Owner’s name.
• Date of registration, vehicle model etc.
• Used for reference of Ciber crime enquiry in future.
• Automatic collection of toll tax.
• Time Saving.
• Free Flow of Traffic.etc
5. MODULES:
•Admin:
•Toll gate Automation is designed to automatically keep track of the vehicle’s movement, record the time and the details like
Owner’s name, date of registration, vehicle model etc.
•Registration of owner:
• Automation of toll gate records the time and the details like Owner’s name, date of registration, vehicle model.
•Track details:
• It explains the implementation of Toll Gate Automation which is a step of monitoring of vehicles, traveling in predetermined
routes.
6. 3.FEASIBILITY STUDY
•“All projects are feasible given unlimited resources and infinite time“.
•Feasibility has applied to Maintenance of Elementary School Data pertains to the following areas:
ï‚· Technical feasibility
ï‚· Operational feasibility
ï‚· Economical feasibilty
7. HARDWARE AND SOFTWARE REQUIREMENTS
•Hardware Requirements
• Processor : Dual Core
• Ram : 1GB (or) Higher
• Hard disk : 160GB
8. •Requirements
•
• Technology : Java 2 Standard Edition, JDBC
• Web Server : Tomcat 7.0
• Client Side Technologies: HTML, CSS, JavaScript
• Server Side Technologies: Servlets, JSP
• Data Base Software : MySQL
• Operating System : Microsoft Windows
• IDE : Eclipse
•
•
9. SYSTEM ANALYSIS
• SOFTWARE REQUIREMENT SPECIFICATION
• The SRS is the means of translating the ideas of the minds of clients (the input) into a formal document (the output of the requirement
phase.)
•The SRS phase consists of two basic activities:
1) Problem/Requirement Analysis:
• The process is order and more nebulous of the two, deals with understand the problem, the goal and constraints.
1) Requirement Specification:
• The Requirement phase terminates with the production of the validate SRS document. Producing the SRS document is the basic goal of
this phase.
10. 5.SYSTEM DESIGN
• System design is transition from a user oriented document to programmers or data base personnel.
• It provides the understanding and procedural details necessary for implementing the system recommended
in the feasibility study.
•SOFTWARE DESIGN
•In designing the software following principles are followed:
• Modularity and partitioning
• Coupling:
• Cohesion:
• Shared use
11. 2INPUT/OUTPUT DESIGN
• Input Design:
• The input design has been done keeping in view that, the interaction of the user with the system being the
most effective and simplified way.
•
 Controlling the amount of input
 Avoid unauthorized access to the classroom.
 Eliminating extra steps
 Keeping the process simple
• At this stage the input forms and screens are designed
12. • Output design:
• All the screens of the system are designed with a view to provide the user with easy operations in simpler
and efficient way, minimum key strokes possible.
• user can operate the system without much help from the operating manual.
13. IMPLEMENTATION
• OVERVIEW OF SOFTWARE DEVELOPMENT TOOLS
• 6.1 HTML
• Html is a language which is used to create web pages with html marking up a page to indicate its format,
telling the web browser where you want a new line to begin or how you want text or images aligned
and more are possible.
14. • 6.2 JAVA SCRIPT
• Java script originally supported by Netscape navigator is the most popular web scripting language today
• . Java script lets you embedded programs right in your web pages and run these programs using the
web browser.
•6.3 MySql
•JDBC DRIVERS:
• The JDBC API only defines interfaces for objects used for performing various database-related tasks like
opening and closing connections, executing SQL commands, and retrieving the results.
• JAVA SERVER PAGES (JSP)
• Java Server Pages (JSP) technology enables you to mix regular, static HTML with dynamically generated
content.
15. •6.5Apache Tomcat
• Apache Tomcat is a web Server.Tomcat is the Servlet/JSP container that implements the Servlet 2.4 and
JavaServer Pages 2.0 specification.
• . It also includes many additional features that make it a useful platform for developing and deploying web
applications and web services.
16. SOFTWARE TESTING
• Testing
• Software testing is a critical element of software quality assurance and represents the ultimate review of
specification, design and code generation
•TEST CASE DESIGN:
•White box testing
•White box testing is a testing case design method that uses the control structure of the procedure design to
derive test cases.
•Black Box Testing:
• Black Box Testing attempts to find errors in following areas or categories, incorrect or missing functions,
interface error, errors in data structures, performance error and initialization and termination error
17. • Unit Testing:
• Unit testing is essentially for the verification of the code produced during the coding phase
and the goal is test the internal logic of the module/program.
• In this phase all the drivers are tested they are rightly connected or not.
•Integration Testing:
• All the tested modules are combined into sub systems, which are then tested. The goal is to
see if the modules are properly integrated, and the emphasis being on the testing interfaces between the
modules.
• Validation Testing
• This testing concentrates on confirming that the software is error-free in all respects. All the specified
validations are verified and the software is subjected to hard-core testing.
18. •System Testing
•
• This testing is a series of different tests whose primary is to fully exercise the computer-based system.
This involves:
ï‚· Implementing the system in a simulated production environment and testing it.
ï‚· Introducing errors and testing for error handling.
•
22. CONCLUSION:
• The Automation Of Toll Gate project has been successfully completed. The goal of the system is
achieved and the problems are solved. This project is developed in this manner that is user friendly and
required help is provided at different levels.
• By doing automation of toll plaza we can have the best solution over money loss at toll plaza by
reducing the man power required for collection of money and also can reduce the traffic indirectly
resulting in reduction of time at toll plaza.
•