Rajesh Kannan R
BGAS certified coating inspector level 2 (cert.No:683254)
Mobile #: +971-55 1929557 / E-mail: rajeshkannan.kkya@gmail.com
PROFILE SNOPSYS:
Bgas certified coating inspector having more than three years experience in inspection and supervision of
blasting and painting activities of pre-engineered and structural fabricated members.
EDUCATION AND CERTIFICATIONS:
Diploma in Mechanical engineering from theni kammavar sangam polytechnic college, Theni-
(2010-2013).
B.Tech in Mechanical engineering from Karnataka University, Madurai- (2014-on progress).
Bgas Certified Coating Inspector level 2- cert. no: 683254 (valid up to January 2021).
Certified Inspector British galvanizers association.
American society for non-destructive testing Certified Inspector level 2 (valid up to August 2018)
(UT, MPI, LPT, VT, RT and RTFI).
Other Trainings & Certifications:
 Attended the workshop on Productivity improvement in Blast cleaning by SSPC-UAE chapter.
 Attended the workshop on PFP coating technology & advancement in DFT measurements by SSPC 
UAE.
 Paint school training by Jotun paints Middle East.
PROFESSIONAL SKILS:
 Quality Assurance / Control.
 Surface defects/Failure analysis and trouble shooting
 Testing and Inspection
 Supervise Blasting/ Surface Preparation and coating activities
 Counselling workers
 Drafting reports
 Making method statement and painting procedures
 Evolution and reviewing specification
 Process improvement and innovation
 Welding and Fit up checking as per dimension and elevation mention in drawing
COMPUTER SKILS:
 MS.Office, Excel, Word and Power point.
1
 Auto cad
 Architectural Cad
Familiar Coating Systems:
 Inorganic (Zinc silicate) and organic zinc rich primers
 Epoxy paints including amine ,amide ,phenol alkamine cured and glass flake epoxy coatings
 Hot dip galvanizing
 Duplex Paint systems on HDG surfaces
 Polyurethane and matured polysilioxane top coats
 Alkyd Paint systems
Familiar Surface preparation and Paint application Methods:
 Centrifugal wheel abrasive blast cleaning
 Compressed air blasting
 Hand and Power tool cleaning
 Solvent cleaning and degreasing
 Airless Spray and Air spray application
 Automatic Paint line (booth ) with force curing
 Brush and Roller applications
PROFESSIONAL EXPERIENCE:
MABANI BUILDING SYSTEMS & CONSTRUCTION GROUP  (RAK UAE)
POSISTION: Quality Inspector (coating)-September 2013 to Till date.
Mabani building system is a one of the leading manufacturer of Pre-engineered Building and structures
in the Middle East.Mabani has achieved ISO 9001 accreditation in Quality Management System and ISO
14001 Environmental Management System.
Major projects handled:
1. Project: Aircraft Maintenance Hangars
Location: Jeddah, Kingdom of Saudi Arabia.
Client: TAL Joint Venture
End user: Saudi Aerospace Engineering Industries
Position: QC inspector
2. Project: AL Ain International Airport MRO Facility
Location: Al ain, UAE
Client: Al Faraa General Contracting
End user: Government
Position: QC inspector
3. Project: EPC expansion of storage facilities at BAB-13
Location: BAB-13, 180 Km south west of Abu Dhabi, UAE
2
Client: Khansaheb Civil Engineering LLC
End user: ADCO
Position: QC inspector
4. Project: New aviation fuel depot for Abu Dhabi international airport
Client: Larsen & Toubro Limited
End user: Takreer
Position: QC inspector
5. Project: EICP OF GAS SWEETENING FACILITIES
Location: Qatar
Client: Petrofac Engineering & Construction
End user: Qatar Petroleum
Position: QC inspector
6. Project: New Gathering Centre GC31 at North Kuwait
Location: KOC GC31, Kuwait
Client: Dodsal Engineering & Construction
Position: QC inspector
7. Project: Bader Almulla & Sons Showroom
Location: Kuwait
Client: Asian Group Co. General Trading & Contracting
End user: Bader Almulla & Sons
Position: QC inspector
8. Project: King Faisal corniche development
Location: Bahrain
Client: ARC Steel construction WLL
Position: QC inspector
9. Project: Gas Compression & Reinjection Station, ZCINA, North Algeria
Location: Hessi Messoud, North Algeria
Client: Dodsal Engineering and Construction Pvt Ltd
End user: Gas Compression & Reinjection Station, ZCINA, North Algeria
Position: QC inspector
10. Project: COIL COATING LINE FOR OARC
Location: Sohar, Oman
Client: Habtoor Leighton Group
End user: Oman Aluminium Rolling Company
Position: QC inspector
Roles & Responsibilities:
 Stage wise Inspection of coating on steel structures
 Verify surface and weld defects to be removed before starts of surface preparations
3
 Monitor weather condition for surface preparation and paint application.
 Execute Painting / coating inspection work as per company project inspection test plan.
 Giving adequate training and advises to blasters ,painters ,foreman and supervisor to improve
quality on regular basis
 Monitor performance of the blasters and painters
 Responsible for incoming painting material inspection and has to ensure whether these materials
suits to meets the requirements of project specifications.
 Prepare all necessary QA / QC documents related to painting and handed over to clients review.
 Review of calibration status of all testing and inspection equipments.
 To undertake test qualifications for spray painters and abrasive blasters.
 To co-ordinate and conduct trials for paint systems for prior approvals
 Maintain standards of safety and comply with company safety health and environment
management systems.
 Coordination with client regarding inspection requirements and schedule of inspection
 Ensure dry film thickness as per specifications and standards.
 Conduct adhesion and curing tests.
 Check colour, gloss level and uniformity of the applied paint.
Chennai petroleum corporation Ltd (Chennai, India) From April 2013 to September 2013.
POSISTION: Quality control Inspector
Roles & Responsibilities:
 Responsible for all field inspections and coordination of inspection activities to
ensure the quality level in contract & working as a team member of project
management team.
 Attend pre-inspection meeting with main contractor prior to the start of any work to
clarify requirements, plans and procedures.
 Ensures that the QC/Inspection work proceeds in accordance with project quality
plan, control procedures and inspection procedures agreed with the contractor
Familiar inspection correspondence to international standards:
 Familiar with monitoring environmental parameters using dew check meter and psychometric dew
point meter (ASTM E 337 )
 Evolution of dust level by pressure sensitivity tape method as per ISO-8502-3
 Visual surface roughness by using pre-blasted profile comparator,testex method (ISO-8503-1)
 Visual assessment of rust grades as per ISO 8501-1
 Surface preparation by solvent cleaning ,hand and power tool cleaning (SSPC SP1,SP2,SP3)
 Evolution of blast cleaning with reference to ISO-8501- Sa3,Sa2.5,Sa2 and Sa 1
 Salt test by using bressle patch and SCM 400 Salt contamination meter as per ISO 8502-6 and ISO-
8502-9
 WFT measurement as per ISO-2808
4
 Dry film thickness verification as per SSPC PA2 ,ISO-19840 and ISO-2808
 Adhesion tape test (ASTM D 3359 & ISO-2409 ) X-cut ,Cross cut tests
 Evolution of curing in inorganic coatings MEK resistance test as per ASTM D 4752
 Pull off adhesion test as per ASTM D 4541
 PERSONAL DETAILS:
Sex Male
Fathers Name V. Ramasubbu
Nationality Indian
Marital Status Single
Date of birth 03-03-1991
Passport No K8968994
Languages known
English ,Tamil (read, write and speak),Hindi, Malayalam and Telugu
(To speak).
Permanent address
5/24, Koolipatti, Neeravi (Po), Kamuthi (Tk), Ramanathapuram (Dt)
Tamilnadu, India-623603.
DECLERATION:
I hereby declare that that all the above details are true and correct to the best of my knowledge
and belief. I promise you that I will be a Dynamic Personality who is very truthful and loyal to contribute
to the organizations goal.
DATE: 02/7/2016 TRUTHFULLY
Ras Al khaimah, UAE RAJESH KANNAN. R
5
 Dry film thickness verification as per SSPC PA2 ,ISO-19840 and ISO-2808
 Adhesion tape test (ASTM D 3359 & ISO-2409 ) X-cut ,Cross cut tests
 Evolution of curing in inorganic coatings MEK resistance test as per ASTM D 4752
 Pull off adhesion test as per ASTM D 4541
 PERSONAL DETAILS:
Sex Male
Fathers Name V. Ramasubbu
Nationality Indian
Marital Status Single
Date of birth 03-03-1991
Passport No K8968994
Languages known
English ,Tamil (read, write and speak),Hindi, Malayalam and Telugu
(To speak).
Permanent address
5/24, Koolipatti, Neeravi (Po), Kamuthi (Tk), Ramanathapuram (Dt)
Tamilnadu, India-623603.
DECLERATION:
I hereby declare that that all the above details are true and correct to the best of my knowledge
and belief. I promise you that I will be a Dynamic Personality who is very truthful and loyal to contribute
to the organizations goal.
DATE: 02/7/2016 TRUTHFULLY
Ras Al khaimah, UAE RAJESH KANNAN. R
5

More Related Content

What's hot (20)

PDF
Final Bills of Quantity
Arissa Loh
PPTX
BS course bldg diagnostic
Adiirfan Che-ani
PDF
Professional Practice I Assignment
ashleyyeap
PDF
Assignment - Final Account
Kai Yun Pang
PPTX
Sgp4813 measurement of quantities
alanchong88
PPTX
Basement remodel rev eh
esands2437
PDF
PP2 Seminar Presentation
ashleyyeap
PDF
Scale of fees (rev. 2004)
helmie84
DOCX
Pp group assignment
wendyteosy
PPTX
Pp2 chapter 1 cheeyong & yih shyang
Emilia Chian Chee Yong
RTF
5) int walls finishes bq
Jeanne Hoo
PPT
Lecture 1 & 2 estate agency
Mohamad Isa Abdullah
PDF
Pp2 asignment-1
Jessyca Than
PDF
Funding Confirmation Letter - Manger Care Centre (2)
Eduard Ellis
PDF
M3 EG BQ metal frame door
Est
PPTX
Payments in the construction industry
Kheng Hoe Advocates
PPTX
Price variation in works contracts
Dr K M SONI
PDF
Pp2 final report
Pui Chun Shian
PDF
Degree Certificate
Mohd Luthfi
PDF
Value Management Group Assignment
Arissa Loh
Final Bills of Quantity
Arissa Loh
BS course bldg diagnostic
Adiirfan Che-ani
Professional Practice I Assignment
ashleyyeap
Assignment - Final Account
Kai Yun Pang
Sgp4813 measurement of quantities
alanchong88
Basement remodel rev eh
esands2437
PP2 Seminar Presentation
ashleyyeap
Scale of fees (rev. 2004)
helmie84
Pp group assignment
wendyteosy
Pp2 chapter 1 cheeyong & yih shyang
Emilia Chian Chee Yong
5) int walls finishes bq
Jeanne Hoo
Lecture 1 & 2 estate agency
Mohamad Isa Abdullah
Pp2 asignment-1
Jessyca Than
Funding Confirmation Letter - Manger Care Centre (2)
Eduard Ellis
M3 EG BQ metal frame door
Est
Payments in the construction industry
Kheng Hoe Advocates
Price variation in works contracts
Dr K M SONI
Pp2 final report
Pui Chun Shian
Degree Certificate
Mohd Luthfi
Value Management Group Assignment
Arissa Loh

Similar to Rajesh kannan -BGAS level 2 CV (20)

DOCX
RAJ UPDATED CV IN WORD
saravana raj
DOCX
hari cv up dated 2015
HAREESH HARIDAS
DOC
CV santosh Kumar 1st Mar 2016 doc
Santosh kumar K Velayudhan
DOCX
CV_FAIZ
Faiz Irshad
DOCX
A.G.sajid cv
abdul ghaffar
DOCX
JAGJEEVAN WARIYA
Jagjeevan Wariya NACE-2
DOC
ANAND CV
mariyan dsouza
DOC
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
sarmad Azeem
DOC
Coating Insulation Inspector-NACE Level 2
Sundar Rajan
DOC
QA_QC PAINTING & COATING INSPECTOR - MOHAMMED IMAMUDDIN
Mohammed Imamuddin BGAS LEVEL '2
DOC
senthilkumar CV
senthil kumar
DOCX
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl
DOC
Copy (2) of Jana CV - Copy.doc( rev6)_1
janarthana raja
DOC
Ananda_Mariyan_DsouzaCV
mariyan dsouza
DOC
CURRICULUM VITE
JAFAR UL HASAN
DOC
Neel CV_Updated
Neelkanth Gavhankar
DOC
Akbar cv
MD AKBAR
DOC
BGAS_RESUME_2-2
Kalaiyazhagan Elangeeran
DOC
senthilkumar CV
senthil kumar
DOCX
qaiserQAQcEngg002
Qaiser Reza
RAJ UPDATED CV IN WORD
saravana raj
hari cv up dated 2015
HAREESH HARIDAS
CV santosh Kumar 1st Mar 2016 doc
Santosh kumar K Velayudhan
CV_FAIZ
Faiz Irshad
A.G.sajid cv
abdul ghaffar
JAGJEEVAN WARIYA
Jagjeevan Wariya NACE-2
ANAND CV
mariyan dsouza
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
sarmad Azeem
Coating Insulation Inspector-NACE Level 2
Sundar Rajan
QA_QC PAINTING & COATING INSPECTOR - MOHAMMED IMAMUDDIN
Mohammed Imamuddin BGAS LEVEL '2
senthilkumar CV
senthil kumar
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl
Copy (2) of Jana CV - Copy.doc( rev6)_1
janarthana raja
Ananda_Mariyan_DsouzaCV
mariyan dsouza
CURRICULUM VITE
JAFAR UL HASAN
Neel CV_Updated
Neelkanth Gavhankar
Akbar cv
MD AKBAR
BGAS_RESUME_2-2
Kalaiyazhagan Elangeeran
senthilkumar CV
senthil kumar
qaiserQAQcEngg002
Qaiser Reza
Ad

Rajesh kannan -BGAS level 2 CV

  • 1. Rajesh Kannan R BGAS certified coating inspector level 2 (cert.No:683254) Mobile #: +971-55 1929557 / E-mail: rajeshkannan.kkya@gmail.com PROFILE SNOPSYS: Bgas certified coating inspector having more than three years experience in inspection and supervision of blasting and painting activities of pre-engineered and structural fabricated members. EDUCATION AND CERTIFICATIONS: Diploma in Mechanical engineering from theni kammavar sangam polytechnic college, Theni- (2010-2013). B.Tech in Mechanical engineering from Karnataka University, Madurai- (2014-on progress). Bgas Certified Coating Inspector level 2- cert. no: 683254 (valid up to January 2021). Certified Inspector British galvanizers association. American society for non-destructive testing Certified Inspector level 2 (valid up to August 2018) (UT, MPI, LPT, VT, RT and RTFI). Other Trainings & Certifications: Attended the workshop on Productivity improvement in Blast cleaning by SSPC-UAE chapter. Attended the workshop on PFP coating technology & advancement in DFT measurements by SSPC UAE. Paint school training by Jotun paints Middle East. PROFESSIONAL SKILS: Quality Assurance / Control. Surface defects/Failure analysis and trouble shooting Testing and Inspection Supervise Blasting/ Surface Preparation and coating activities Counselling workers Drafting reports Making method statement and painting procedures Evolution and reviewing specification Process improvement and innovation Welding and Fit up checking as per dimension and elevation mention in drawing COMPUTER SKILS: MS.Office, Excel, Word and Power point. 1
  • 2. Auto cad Architectural Cad Familiar Coating Systems: Inorganic (Zinc silicate) and organic zinc rich primers Epoxy paints including amine ,amide ,phenol alkamine cured and glass flake epoxy coatings Hot dip galvanizing Duplex Paint systems on HDG surfaces Polyurethane and matured polysilioxane top coats Alkyd Paint systems Familiar Surface preparation and Paint application Methods: Centrifugal wheel abrasive blast cleaning Compressed air blasting Hand and Power tool cleaning Solvent cleaning and degreasing Airless Spray and Air spray application Automatic Paint line (booth ) with force curing Brush and Roller applications PROFESSIONAL EXPERIENCE: MABANI BUILDING SYSTEMS & CONSTRUCTION GROUP (RAK UAE) POSISTION: Quality Inspector (coating)-September 2013 to Till date. Mabani building system is a one of the leading manufacturer of Pre-engineered Building and structures in the Middle East.Mabani has achieved ISO 9001 accreditation in Quality Management System and ISO 14001 Environmental Management System. Major projects handled: 1. Project: Aircraft Maintenance Hangars Location: Jeddah, Kingdom of Saudi Arabia. Client: TAL Joint Venture End user: Saudi Aerospace Engineering Industries Position: QC inspector 2. Project: AL Ain International Airport MRO Facility Location: Al ain, UAE Client: Al Faraa General Contracting End user: Government Position: QC inspector 3. Project: EPC expansion of storage facilities at BAB-13 Location: BAB-13, 180 Km south west of Abu Dhabi, UAE 2
  • 3. Client: Khansaheb Civil Engineering LLC End user: ADCO Position: QC inspector 4. Project: New aviation fuel depot for Abu Dhabi international airport Client: Larsen & Toubro Limited End user: Takreer Position: QC inspector 5. Project: EICP OF GAS SWEETENING FACILITIES Location: Qatar Client: Petrofac Engineering & Construction End user: Qatar Petroleum Position: QC inspector 6. Project: New Gathering Centre GC31 at North Kuwait Location: KOC GC31, Kuwait Client: Dodsal Engineering & Construction Position: QC inspector 7. Project: Bader Almulla & Sons Showroom Location: Kuwait Client: Asian Group Co. General Trading & Contracting End user: Bader Almulla & Sons Position: QC inspector 8. Project: King Faisal corniche development Location: Bahrain Client: ARC Steel construction WLL Position: QC inspector 9. Project: Gas Compression & Reinjection Station, ZCINA, North Algeria Location: Hessi Messoud, North Algeria Client: Dodsal Engineering and Construction Pvt Ltd End user: Gas Compression & Reinjection Station, ZCINA, North Algeria Position: QC inspector 10. Project: COIL COATING LINE FOR OARC Location: Sohar, Oman Client: Habtoor Leighton Group End user: Oman Aluminium Rolling Company Position: QC inspector Roles & Responsibilities: Stage wise Inspection of coating on steel structures Verify surface and weld defects to be removed before starts of surface preparations 3
  • 4. Monitor weather condition for surface preparation and paint application. Execute Painting / coating inspection work as per company project inspection test plan. Giving adequate training and advises to blasters ,painters ,foreman and supervisor to improve quality on regular basis Monitor performance of the blasters and painters Responsible for incoming painting material inspection and has to ensure whether these materials suits to meets the requirements of project specifications. Prepare all necessary QA / QC documents related to painting and handed over to clients review. Review of calibration status of all testing and inspection equipments. To undertake test qualifications for spray painters and abrasive blasters. To co-ordinate and conduct trials for paint systems for prior approvals Maintain standards of safety and comply with company safety health and environment management systems. Coordination with client regarding inspection requirements and schedule of inspection Ensure dry film thickness as per specifications and standards. Conduct adhesion and curing tests. Check colour, gloss level and uniformity of the applied paint. Chennai petroleum corporation Ltd (Chennai, India) From April 2013 to September 2013. POSISTION: Quality control Inspector Roles & Responsibilities: Responsible for all field inspections and coordination of inspection activities to ensure the quality level in contract & working as a team member of project management team. Attend pre-inspection meeting with main contractor prior to the start of any work to clarify requirements, plans and procedures. Ensures that the QC/Inspection work proceeds in accordance with project quality plan, control procedures and inspection procedures agreed with the contractor Familiar inspection correspondence to international standards: Familiar with monitoring environmental parameters using dew check meter and psychometric dew point meter (ASTM E 337 ) Evolution of dust level by pressure sensitivity tape method as per ISO-8502-3 Visual surface roughness by using pre-blasted profile comparator,testex method (ISO-8503-1) Visual assessment of rust grades as per ISO 8501-1 Surface preparation by solvent cleaning ,hand and power tool cleaning (SSPC SP1,SP2,SP3) Evolution of blast cleaning with reference to ISO-8501- Sa3,Sa2.5,Sa2 and Sa 1 Salt test by using bressle patch and SCM 400 Salt contamination meter as per ISO 8502-6 and ISO- 8502-9 WFT measurement as per ISO-2808 4
  • 5. Dry film thickness verification as per SSPC PA2 ,ISO-19840 and ISO-2808 Adhesion tape test (ASTM D 3359 & ISO-2409 ) X-cut ,Cross cut tests Evolution of curing in inorganic coatings MEK resistance test as per ASTM D 4752 Pull off adhesion test as per ASTM D 4541 PERSONAL DETAILS: Sex Male Fathers Name V. Ramasubbu Nationality Indian Marital Status Single Date of birth 03-03-1991 Passport No K8968994 Languages known English ,Tamil (read, write and speak),Hindi, Malayalam and Telugu (To speak). Permanent address 5/24, Koolipatti, Neeravi (Po), Kamuthi (Tk), Ramanathapuram (Dt) Tamilnadu, India-623603. DECLERATION: I hereby declare that that all the above details are true and correct to the best of my knowledge and belief. I promise you that I will be a Dynamic Personality who is very truthful and loyal to contribute to the organizations goal. DATE: 02/7/2016 TRUTHFULLY Ras Al khaimah, UAE RAJESH KANNAN. R 5
  • 6. Dry film thickness verification as per SSPC PA2 ,ISO-19840 and ISO-2808 Adhesion tape test (ASTM D 3359 & ISO-2409 ) X-cut ,Cross cut tests Evolution of curing in inorganic coatings MEK resistance test as per ASTM D 4752 Pull off adhesion test as per ASTM D 4541 PERSONAL DETAILS: Sex Male Fathers Name V. Ramasubbu Nationality Indian Marital Status Single Date of birth 03-03-1991 Passport No K8968994 Languages known English ,Tamil (read, write and speak),Hindi, Malayalam and Telugu (To speak). Permanent address 5/24, Koolipatti, Neeravi (Po), Kamuthi (Tk), Ramanathapuram (Dt) Tamilnadu, India-623603. DECLERATION: I hereby declare that that all the above details are true and correct to the best of my knowledge and belief. I promise you that I will be a Dynamic Personality who is very truthful and loyal to contribute to the organizations goal. DATE: 02/7/2016 TRUTHFULLY Ras Al khaimah, UAE RAJESH KANNAN. R 5