A swimming pool project for a 4-star hotel was handled by Stream Century Co., Ltd. from 2013-12. The project involved producing mosaic tiles for the pool in batches, with pictures taken of each batch for customer review before loading and shipment. Feedback from the jobsite was 100% satisfactory.