Personal Information
Organization / Workplace
Indonesia Indonesia
Occupation
safety watchman
About
Performed Quality Audits to verify conformance to scope of work, PO’s ,Vendor drawing and Specifications, Codes and Manufacturer’s Data Sheet. Reviewed and approved contractor submittals on quality plan and all relevant and critical procedures contractually required by the project engineering.
Reviewed, verifies , and approves NDT ( RT, UT,MT and PT ) results and requirement levels based on the project approved QC and NDT plans.
Experience with Down Hole equipment such as Packers, ADPTR, CTRZR, Liner Wiper Plug System, TSRV and Gas Lift Mandrel. And familiar with Drill Pipe and OCTG tubular connection such as API Connection (Buttress Connection, EUE 8 RD & 10 RD and LTC & STC Connection)...
Contact Details
Users following agus faizal