CONSIDERATIONS IN
AGILE ADOPTION AND ADAPTATION
    A PRESENTATION TO THE AGILE KNOXVILLE
              SOFTWARE GROUP




             April 18, 2012 Meeting
      Presenter: Alston E. Hodge, CSP, PMP
2012 04 18 Knoxville Agile Adoption&Adaptation
AGENDA
 Agile vs. Scrum
 Principles vs. Practices
 Risks and consequences
 Case Studies in Adoption and Adaptation
 Summary
AGILE VS. SCRUM
 Agile  an umbrella term for all iterative and incremental
  development approaches
     eXtreme Programming
     DSDM
     Crystal Orange
     Scrum

 Scrum  an Agile project management framework
     Over 70% of Agile companies use Scrum or Scrum/XP
COMPARISON OF AGILE TOOLS
PRINCIPLES AND PRACTICES

Core Principles                        Core Practices
   Early and continuous delivery          3 roles
   Short duration iterations              4 ceremonies
   Business and developers together       Small cross-functional teams
   Empowered teams                        Knowledgeable PO
   Face to face conversations             Senior level championship
   Working software is the metric         One project at a time
   Emergent architecture & design         Time-boxed
   Continuous improvement                 Design-Build-Test-concurrently
ADOPT OR ADAPT?
Is it OK to adapt Scrum to fit our culture and work environment?
 Adopt the values and principles  these are foundational.
 Adapt the practices and techniques  make accommodations to
  match current reality


But realize the work and our world are constantly changing, so we
need to change (adapt) our practices accordingly.
BUT UNDERSTAND THE RISKS
UNDERSTAND THE CONSEQUENCES:

     CASE STUDIES REVIEW
CASE STUDY:
NGO
         Introduced Scrum 4 years ago
         One 40-member team  Five 8-member teams
         16 offshore people (QA Testing, Production Support)
         Mini-waterfall (Scrum-lite)
         High turnover
         No acceptance criteria, no definition of done
         Stakeholders do not attend Demos
         Stories injected mid-sprint
         Most managers/leads work 60 hr weeks
         Frustrations at all levels, organization polarized
         CST refused to give certificates to participants in training
ADOPTION/ADAPTATION CHALLENGES:
NGO
 No ScrumMaster
       PO served as SM
       No one protecting the team
       No checks and balances
       No retrospectives
 Agile Champion = Theory X Vice President
     Highest number of HR complaints
     Injects stories without informing PO
     Threatens employees with termination
 Training incomplete
     Managers heckled trainer
     Trainer left after completing 75% of training
NGO:
PRINCIPLES AND PRACTICES VIOLATED

Core Principles                        Core Practices
   Early and continuous delivery          3 roles
   Short duration iterations              4 ceremonies
   Business and developers together       Small cross-functional teams
   Empowered teams                        Knowledgeable PO
   Face to face conversations             Senior level championship
   Working software is the metric         One project at a time
   Emergent architecture & design         Time-boxed
   Continuous improvement                 Design-Build-Test concurrently
CASE STUDY:
EMERGENCY MEDICAL SERVICES
 Fast-pace work environment
 Four Product Owners
 High-turnover
 Stories injected mid-sprint
 Mini-waterfall (Scrum-lite)
 Offshore QA testing
ADOPTION/ADAPTATION CHALLENGES:
EMERGENCY MEDICAL SERVICES
 Certified ScrumMaster replaced by IT director
 Uncomfortable with cultural diversity
 No lead Product Owner
 Business side not trained in Agile
 No retrospectives
Product Owner



                  Team



   Scrum Master



Simple Scrum
Product
               Owner 4


     Product
     Owner 3


Product                  Scrum
Owner 2                  Team


      Scrum
      Master
                                 Product
                                 Owner 1
EMS:
PRINCIPLES AND PRACTICES VIOLATED

Core Principles                        Core Practices
   Early and continuous delivery          3 roles
   Short duration iterations              4 ceremonies
   Business and developers together       Small cross-functional teams
   Empowered teams                        Knowledgeable PO
   Face to face conversations             Senior level championship
   Working software is the metric         One project at a time
   Emergent architecture & design         Time-boxed
   Continuous improvement                 Design-Build-Test concurrently
CASE STUDY:
VACATION OWNERSHIP COMPANY
   New to Scrum
   $24M program
   Director was senior developer promoted, XP experience
   PMO director ex-military officer
   Recent down-sizing then re-hiring
   Big-bang Agile implementation
   Big up-front requirements gathering
   Big up-Front design effort
   Highly specialized team members
   Off-shore testing
VACATION OWNERSHIP:
ADOPTION/ADAPTATION CHALLENGES:
 Lack of Scrum training
 SMs go to director for all issues and ideas
 Reluctance to start until all requirements known
 60% contractors with different opinions of Scrum/XP
 4 different contract companies working on one team
 Contracts dis-allow cross-functional development
 Command/Control leadership
 Leadership not on same page (IT, PMO, Business)
VACATION OWNERSHIP:
PRINCIPLES AND PRACTICES VIOLATED

Core Principles                        Core Practices
   Early and continuous delivery          3 roles
   Short duration iterations              4 ceremonies
   Business and developers together       Small cross-functional teams
   Empowered teams                        Knowledgeable PO
   Face to face conversations             Senior level championship
   Working software is the metric         One project at a time
   Emergent architecture & design         Time-boxed
   Continuous improvement                 Design-Build-Test concurrently
CASE STUDY:
HEALTHCARE SERVICES COMPANY
 Introduced Scrum 4 years ago
 Heavy offshore utilization
 Common practice to have 3 to 4 projects per sprint
 Only 55% of teams adopting Scrum
 Sprints vary from 2 to 10 weeks
ADOPTION/ADAPTATION CHALLENGES:
HEALTHCARE SERVICES
 Business Partners not part of early adoption
 Various Sprint models
 In-effective retrospectives
 Large scale adoption not coordinated
Product Owner




                Team



 Scrum Master



Simple Scrum
Product
                               Owner 4
      Product
      Owner 3
                                   Business PM

Product                Scrum
Owner 2                Team          IT PM


          Scrum                 SME/Arch
          Master



                   Product
                   Owner 1
Product
                     Owner 4



                                Product Owner
Product                         3
Owner 2

                                        Business PM
          Lead
          Product
          Owner

                                Scrum
                                Team


      Scrum Master
                                                SME/Arch

                        IT PM
Sprint Models
 Model S
DEV-SIT-UAT    DEV-SIT-UAT      DEV-SIT-UAT         .
  Model DS-U
  DEV + SIT        UAT           DEV + SIT               UAT         DEV + SIT         UAT



 Model D-D-D-S-U
    DEV            DEV              DEV
                                                    .         SIT               UAT



Model D-S-U
    DEV            SIT              UAT
                      Defects     Defects

                   DEV              SIT                  UAT
                                          Defects    Defects
                                   DEV                   SIT           UAT
Projects/sprint
 5

4.5

 4

3.5

 3
                                                           Team Size
2.5                                         14
 2
                                            12
1.5

 1                                          10
0.5
                                             8
 0

      Failing        Struggling   Healthy    6


                                             4


                                             2


                                             0
                                                 Failing      Struggling   Healthy
True sprint length (wks)
8

7

6

5

4

3

2

1

0
                                                                  PO Experience (yrs)
    Failing            Struggling        Healthy
                                                   10

                                                    9

                                                    8

                                                    7

                                                    6

                                                    5

                                                    4

                                                    3

                                                    2

                                                    1

                                                    0
                                                        Failing           Struggling    Healthy
HEALTHCARE COMPANY:
PRINCIPLES AND PRACTICES VIOLATED

Core Principles                        Core Practices
   Early and continuous delivery          3 roles
   Short duration iterations              4 ceremonies
   Business and developers together       Small cross-functional teams
   Empowered teams                        Knowledgeable PO
   Face to face conversations             Senior level championship
   Working software is the metric         One project at a time

   Emergent architecture & design         Time-boxed
   Continuous improvement                 Design-Build-Test concurrently
WHY ADAPTATION OCCURS
 Scrum viewed as methodology rather than framework of
  processes
 Reluctance to be truly transparent (risky)
 Reluctance to address organizational impediments (territorial)
 Thats just how we do things here (culture)
 Viewed as threat to hierarchical & command/control
  organizations
 Difficult to transition from process to product mindset
ADAPT, BUT REMEMBER 
 The closer you follow true Scrum, the less risks
 Dont rest on your laurels
 Always room for improvement
TIPS AND TRICKS
 If at first you dont adopt, try, try again.
 Track impediments
 Conduct regular organizational retrospectives
 Create and promote a culture of continuous improvement
     Lean IT
     SixSigma
     Agile
     Community of Practice
SUMMARY
 Adopt, then adapt.
 Stop. Inspect. Adapt. Everyday.
 Take risks. Early.
Ad

Recommended

Agile intro module 4
Agile intro module 4
Andr辿 Heijstek
Agile intro module 1
Agile intro module 1
Andr辿 Heijstek
LKIN2018: leveraging Lean and Kanban to implement continuous improvement
LKIN2018: leveraging Lean and Kanban to implement continuous improvement
Ravi Tadwalkar
Shirly Ronen - A practical view on Agile Testing Maturity Levels
Shirly Ronen - A practical view on Agile Testing Maturity Levels
AgileSparks
Agile lean workshop for managers & exec leadership
Agile lean workshop for managers & exec leadership
Ravi Tadwalkar
Agile intro module 0
Agile intro module 0
Andr辿 Heijstek
Bosnia Agile Tuzla Meetup
Bosnia Agile Tuzla Meetup
Bosnia Agile
Jax Sql Saturday Scrum presentation #130
Jax Sql Saturday Scrum presentation #130
Christopher Daily
Introduction to scrum & agile
Introduction to scrum & agile
Conscires Agile Practices
Lean Agile For Testers
Lean Agile For Testers
Yuval Yeret
Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1
Michael O'Rourke
A Dozen Keys to Agile Testing Maturity
A Dozen Keys to Agile Testing Maturity
TechWell
Exec Leadership workshop
Exec Leadership workshop
Ravi Tadwalkar
Scrum/XP using Team System (devLink & Agile 2009)
Scrum/XP using Team System (devLink & Agile 2009)
Tommy Norman
Agile introduction for the American Chamber of Commerce members
Agile introduction for the American Chamber of Commerce members
Andy Brandt
Teams and responsibilities
Teams and responsibilities
Amir Barylko
Getting Started with Scrum
Getting Started with Scrum
Silvana Wasitova, Scrum & Agile Coach
Distributed Agile Development
Distributed Agile Development
丐舒仆仍亳亠仄.弍亠仍
Using kanban and cfd to effectively manage agile testing
Using kanban and cfd to effectively manage agile testing
Yuval Yeret
Agile Roles & responsibilities
Agile Roles & responsibilities
Ravi Tadwalkar
Agile intro module 2
Agile intro module 2
Andr辿 Heijstek
DevOps Approach (Point of View by Ravi Tadwalkar)
DevOps Approach (Point of View by Ravi Tadwalkar)
Ravi Tadwalkar
Distributed Agile Teams
Distributed Agile Teams
Brian Estep
ScrumMaster vs Project Manager
ScrumMaster vs Project Manager
AgileDad
Lean Agile : voir en grand !
Lean Agile : voir en grand !
Christophe Keromen
Pecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agile
Ravi Tadwalkar
Intro to scrum webinar
Intro to scrum webinar
Conscires Agile Practices
Approaches to scaling agile v1.0
Approaches to scaling agile v1.0
Srinath Ramakrishnan
Scrum Journey In Healthcare Day Of Agile
Scrum Journey In Healthcare Day Of Agile
alstonhodge
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
alstonehodge

More Related Content

What's hot (20)

Introduction to scrum & agile
Introduction to scrum & agile
Conscires Agile Practices
Lean Agile For Testers
Lean Agile For Testers
Yuval Yeret
Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1
Michael O'Rourke
A Dozen Keys to Agile Testing Maturity
A Dozen Keys to Agile Testing Maturity
TechWell
Exec Leadership workshop
Exec Leadership workshop
Ravi Tadwalkar
Scrum/XP using Team System (devLink & Agile 2009)
Scrum/XP using Team System (devLink & Agile 2009)
Tommy Norman
Agile introduction for the American Chamber of Commerce members
Agile introduction for the American Chamber of Commerce members
Andy Brandt
Teams and responsibilities
Teams and responsibilities
Amir Barylko
Getting Started with Scrum
Getting Started with Scrum
Silvana Wasitova, Scrum & Agile Coach
Distributed Agile Development
Distributed Agile Development
丐舒仆仍亳亠仄.弍亠仍
Using kanban and cfd to effectively manage agile testing
Using kanban and cfd to effectively manage agile testing
Yuval Yeret
Agile Roles & responsibilities
Agile Roles & responsibilities
Ravi Tadwalkar
Agile intro module 2
Agile intro module 2
Andr辿 Heijstek
DevOps Approach (Point of View by Ravi Tadwalkar)
DevOps Approach (Point of View by Ravi Tadwalkar)
Ravi Tadwalkar
Distributed Agile Teams
Distributed Agile Teams
Brian Estep
ScrumMaster vs Project Manager
ScrumMaster vs Project Manager
AgileDad
Lean Agile : voir en grand !
Lean Agile : voir en grand !
Christophe Keromen
Pecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agile
Ravi Tadwalkar
Intro to scrum webinar
Intro to scrum webinar
Conscires Agile Practices
Approaches to scaling agile v1.0
Approaches to scaling agile v1.0
Srinath Ramakrishnan
Lean Agile For Testers
Lean Agile For Testers
Yuval Yeret
Scrumban (Lean Agile Fusion) V1.1
Scrumban (Lean Agile Fusion) V1.1
Michael O'Rourke
A Dozen Keys to Agile Testing Maturity
A Dozen Keys to Agile Testing Maturity
TechWell
Exec Leadership workshop
Exec Leadership workshop
Ravi Tadwalkar
Scrum/XP using Team System (devLink & Agile 2009)
Scrum/XP using Team System (devLink & Agile 2009)
Tommy Norman
Agile introduction for the American Chamber of Commerce members
Agile introduction for the American Chamber of Commerce members
Andy Brandt
Teams and responsibilities
Teams and responsibilities
Amir Barylko
Using kanban and cfd to effectively manage agile testing
Using kanban and cfd to effectively manage agile testing
Yuval Yeret
Agile Roles & responsibilities
Agile Roles & responsibilities
Ravi Tadwalkar
DevOps Approach (Point of View by Ravi Tadwalkar)
DevOps Approach (Point of View by Ravi Tadwalkar)
Ravi Tadwalkar
Distributed Agile Teams
Distributed Agile Teams
Brian Estep
ScrumMaster vs Project Manager
ScrumMaster vs Project Manager
AgileDad
Lean Agile : voir en grand !
Lean Agile : voir en grand !
Christophe Keromen
Pecha kucha format- how can devops be implemented with lean and agile
Pecha kucha format- how can devops be implemented with lean and agile
Ravi Tadwalkar
Approaches to scaling agile v1.0
Approaches to scaling agile v1.0
Srinath Ramakrishnan

Similar to 2012 04 18 Knoxville Agile Adoption&Adaptation (20)

Scrum Journey In Healthcare Day Of Agile
Scrum Journey In Healthcare Day Of Agile
alstonhodge
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
alstonehodge
Agile with scrum methodology
Agile with scrum methodology
Abhishek Srivastava
Agile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An Introduction
XBOSoft
Scrum 101
Scrum 101
Ozgur Ertem
Agile by KD
Agile by KD
Karl Dickman
Agile by KD
Agile by KD
Karl Dickman
Agile Project Management using Scrum
Agile Project Management using Scrum
Sarath Revuri, PMP, CSM, PRINCE2
Agile methodology
Agile methodology
Naveen Kumar Singh
Agile scrum _ Prasanna Yaddanapudi
Agile scrum _ Prasanna Yaddanapudi
TLI GrowthSession
XebiCon'17 : //Tam-tams// Voici lhistoire de la disparition des dinosaures d...
XebiCon'17 : //Tam-tams// Voici lhistoire de la disparition des dinosaures d...
Publicis Sapient Engineering
Scrum toufiq
Scrum toufiq
Toufiq Mahmud
How to improve your time to market by moving to Agile with good governance (K...
How to improve your time to market by moving to Agile with good governance (K...
APMG-International Showcase UK
Summer Scrum Public
Summer Scrum Public
Angeliki Plati
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
duhitha2
Why Scrum Why Now
Why Scrum Why Now
mtoppa
Customized Scrum
Customized Scrum
Abdul Karim
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
BinNguynVn3
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore
When Management Asks You: Do You Accept Agile as Your Lord and Savior? - Ci...
When Management Asks You: Do You Accept Agile as Your Lord and Savior? - Ci...
admford
Scrum Journey In Healthcare Day Of Agile
Scrum Journey In Healthcare Day Of Agile
alstonhodge
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
Agile Odyssey: Case Study of Agile Adoption within A Health Insurance Company
alstonehodge
Agile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An Introduction
XBOSoft
Agile scrum _ Prasanna Yaddanapudi
Agile scrum _ Prasanna Yaddanapudi
TLI GrowthSession
XebiCon'17 : //Tam-tams// Voici lhistoire de la disparition des dinosaures d...
XebiCon'17 : //Tam-tams// Voici lhistoire de la disparition des dinosaures d...
Publicis Sapient Engineering
How to improve your time to market by moving to Agile with good governance (K...
How to improve your time to market by moving to Agile with good governance (K...
APMG-International Showcase UK
Summer Scrum Public
Summer Scrum Public
Angeliki Plati
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
duhitha2
Why Scrum Why Now
Why Scrum Why Now
mtoppa
Customized Scrum
Customized Scrum
Abdul Karim
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
BinNguynVn3
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore
When Management Asks You: Do You Accept Agile as Your Lord and Savior? - Ci...
When Management Asks You: Do You Accept Agile as Your Lord and Savior? - Ci...
admford
Ad

2012 04 18 Knoxville Agile Adoption&Adaptation

  • 1. CONSIDERATIONS IN AGILE ADOPTION AND ADAPTATION A PRESENTATION TO THE AGILE KNOXVILLE SOFTWARE GROUP April 18, 2012 Meeting Presenter: Alston E. Hodge, CSP, PMP
  • 3. AGENDA Agile vs. Scrum Principles vs. Practices Risks and consequences Case Studies in Adoption and Adaptation Summary
  • 4. AGILE VS. SCRUM Agile an umbrella term for all iterative and incremental development approaches eXtreme Programming DSDM Crystal Orange Scrum Scrum an Agile project management framework Over 70% of Agile companies use Scrum or Scrum/XP
  • 6. PRINCIPLES AND PRACTICES Core Principles Core Practices Early and continuous delivery 3 roles Short duration iterations 4 ceremonies Business and developers together Small cross-functional teams Empowered teams Knowledgeable PO Face to face conversations Senior level championship Working software is the metric One project at a time Emergent architecture & design Time-boxed Continuous improvement Design-Build-Test-concurrently
  • 7. ADOPT OR ADAPT? Is it OK to adapt Scrum to fit our culture and work environment? Adopt the values and principles these are foundational. Adapt the practices and techniques make accommodations to match current reality But realize the work and our world are constantly changing, so we need to change (adapt) our practices accordingly.
  • 9. UNDERSTAND THE CONSEQUENCES: CASE STUDIES REVIEW
  • 10. CASE STUDY: NGO Introduced Scrum 4 years ago One 40-member team Five 8-member teams 16 offshore people (QA Testing, Production Support) Mini-waterfall (Scrum-lite) High turnover No acceptance criteria, no definition of done Stakeholders do not attend Demos Stories injected mid-sprint Most managers/leads work 60 hr weeks Frustrations at all levels, organization polarized CST refused to give certificates to participants in training
  • 11. ADOPTION/ADAPTATION CHALLENGES: NGO No ScrumMaster PO served as SM No one protecting the team No checks and balances No retrospectives Agile Champion = Theory X Vice President Highest number of HR complaints Injects stories without informing PO Threatens employees with termination Training incomplete Managers heckled trainer Trainer left after completing 75% of training
  • 12. NGO: PRINCIPLES AND PRACTICES VIOLATED Core Principles Core Practices Early and continuous delivery 3 roles Short duration iterations 4 ceremonies Business and developers together Small cross-functional teams Empowered teams Knowledgeable PO Face to face conversations Senior level championship Working software is the metric One project at a time Emergent architecture & design Time-boxed Continuous improvement Design-Build-Test concurrently
  • 13. CASE STUDY: EMERGENCY MEDICAL SERVICES Fast-pace work environment Four Product Owners High-turnover Stories injected mid-sprint Mini-waterfall (Scrum-lite) Offshore QA testing
  • 14. ADOPTION/ADAPTATION CHALLENGES: EMERGENCY MEDICAL SERVICES Certified ScrumMaster replaced by IT director Uncomfortable with cultural diversity No lead Product Owner Business side not trained in Agile No retrospectives
  • 15. Product Owner Team Scrum Master Simple Scrum
  • 16. Product Owner 4 Product Owner 3 Product Scrum Owner 2 Team Scrum Master Product Owner 1
  • 17. EMS: PRINCIPLES AND PRACTICES VIOLATED Core Principles Core Practices Early and continuous delivery 3 roles Short duration iterations 4 ceremonies Business and developers together Small cross-functional teams Empowered teams Knowledgeable PO Face to face conversations Senior level championship Working software is the metric One project at a time Emergent architecture & design Time-boxed Continuous improvement Design-Build-Test concurrently
  • 18. CASE STUDY: VACATION OWNERSHIP COMPANY New to Scrum $24M program Director was senior developer promoted, XP experience PMO director ex-military officer Recent down-sizing then re-hiring Big-bang Agile implementation Big up-front requirements gathering Big up-Front design effort Highly specialized team members Off-shore testing
  • 19. VACATION OWNERSHIP: ADOPTION/ADAPTATION CHALLENGES: Lack of Scrum training SMs go to director for all issues and ideas Reluctance to start until all requirements known 60% contractors with different opinions of Scrum/XP 4 different contract companies working on one team Contracts dis-allow cross-functional development Command/Control leadership Leadership not on same page (IT, PMO, Business)
  • 20. VACATION OWNERSHIP: PRINCIPLES AND PRACTICES VIOLATED Core Principles Core Practices Early and continuous delivery 3 roles Short duration iterations 4 ceremonies Business and developers together Small cross-functional teams Empowered teams Knowledgeable PO Face to face conversations Senior level championship Working software is the metric One project at a time Emergent architecture & design Time-boxed Continuous improvement Design-Build-Test concurrently
  • 21. CASE STUDY: HEALTHCARE SERVICES COMPANY Introduced Scrum 4 years ago Heavy offshore utilization Common practice to have 3 to 4 projects per sprint Only 55% of teams adopting Scrum Sprints vary from 2 to 10 weeks
  • 22. ADOPTION/ADAPTATION CHALLENGES: HEALTHCARE SERVICES Business Partners not part of early adoption Various Sprint models In-effective retrospectives Large scale adoption not coordinated
  • 23. Product Owner Team Scrum Master Simple Scrum
  • 24. Product Owner 4 Product Owner 3 Business PM Product Scrum Owner 2 Team IT PM Scrum SME/Arch Master Product Owner 1
  • 25. Product Owner 4 Product Owner Product 3 Owner 2 Business PM Lead Product Owner Scrum Team Scrum Master SME/Arch IT PM
  • 26. Sprint Models Model S DEV-SIT-UAT DEV-SIT-UAT DEV-SIT-UAT . Model DS-U DEV + SIT UAT DEV + SIT UAT DEV + SIT UAT Model D-D-D-S-U DEV DEV DEV . SIT UAT Model D-S-U DEV SIT UAT Defects Defects DEV SIT UAT Defects Defects DEV SIT UAT
  • 27. Projects/sprint 5 4.5 4 3.5 3 Team Size 2.5 14 2 12 1.5 1 10 0.5 8 0 Failing Struggling Healthy 6 4 2 0 Failing Struggling Healthy
  • 28. True sprint length (wks) 8 7 6 5 4 3 2 1 0 PO Experience (yrs) Failing Struggling Healthy 10 9 8 7 6 5 4 3 2 1 0 Failing Struggling Healthy
  • 29. HEALTHCARE COMPANY: PRINCIPLES AND PRACTICES VIOLATED Core Principles Core Practices Early and continuous delivery 3 roles Short duration iterations 4 ceremonies Business and developers together Small cross-functional teams Empowered teams Knowledgeable PO Face to face conversations Senior level championship Working software is the metric One project at a time Emergent architecture & design Time-boxed Continuous improvement Design-Build-Test concurrently
  • 30. WHY ADAPTATION OCCURS Scrum viewed as methodology rather than framework of processes Reluctance to be truly transparent (risky) Reluctance to address organizational impediments (territorial) Thats just how we do things here (culture) Viewed as threat to hierarchical & command/control organizations Difficult to transition from process to product mindset
  • 31. ADAPT, BUT REMEMBER The closer you follow true Scrum, the less risks Dont rest on your laurels Always room for improvement
  • 32. TIPS AND TRICKS If at first you dont adopt, try, try again. Track impediments Conduct regular organizational retrospectives Create and promote a culture of continuous improvement Lean IT SixSigma Agile Community of Practice
  • 33. SUMMARY Adopt, then adapt. Stop. Inspect. Adapt. Everyday. Take risks. Early.

Editor's Notes

  • #3: Heres a sampling of some of the companies Ive assisted in the past. They represent a spectrum of Agile maturity and successes. Some are just starting in Agile adoption, and some have over 10 years of Agile experience.
  • #16: From an organizational team structure, the scrum team is made up of a the core team, a product owner and a scrum master. With a small, cross-functional and dedicated team structure, and a dedicated SM and PO, the team is in a position to deliver regularly and with high quality. And at regular periods they stop, inspect their progress, identify impediments, and adapt their practice, making them even more productive in the next Sprint.By following this simple model and mindset, they have the potential of becoming a hyper-performing team.
  • #17: Now, imagine a scenario at Humana where a team has 4 projects concurrently running in a sprint, each with its own Product Owner. Add to that an IT PM, an Business PM, and an SME or Architect.If you were a member of the team, who do you take directions from? Who has final decision power. Who trumps who?
  • #24: From an organizational team structure, the scrum team is made up of a the core team, a product owner and a scrum master. With a small, cross-functional and dedicated team structure, and a dedicated SM and PO, the team is in a position to deliver regularly and with high quality. And at regular periods they stop, inspect their progress, identify impediments, and adapt their practice, making them even more productive in the next Sprint.By following this simple model and mindset, they have the potential of becoming a hyper-performing team.
  • #25: Now, imagine a scenario at Humana where a team has 4 projects concurrently running in a sprint, each with its own Product Owner. Add to that an IT PM, an Business PM, and an SME or Architect.If you were a member of the team, who do you take directions from? Who has final decision power. Who trumps who?
  • #26: The first issue to address is that of Product Ownership.With multiple product owners, the team MUST have a single point of contact. For this particular example, the Product Owners decided to form a Product Owner team with a single voice for the team.