This document summarizes a student presentation about a Design for Change project to renovate the National Memorial located on their school campus. It introduces the students involved and outlines the objectives, working process, and results of the project. The project followed the SMART criteria and involved cleaning, washing, painting, and decorating the memorial structure and basement. Photos document the renovation process. The presentation concludes that teamwork made the project possible and the memorial site will now be used for a permanent structure thanks to their efforts.
2. ABOUT DESIGN FOR CHANGE
PROBLEM SELECTION
SMART PROJECT
S=SPECIFIC
M=MEASUREABLE
A=ATTAINABLE
R=REALISTIC
T=TIME BOUND
3. Project name :
Renovation program of
National Memorial of RS
campus
4. Asfak
Michael
Niaz
Satil
Fabia
Belliet
Bristy
Sundrin
Anika
5. Objectives :
Firstly , the place needed to renovate .
Secondly , it bothered us so we took steps .
Thirdly , to make it symbolic so that we can
show respect to the national martyrs through
our monument.
7. Working process :
Cleaning Washing Painting Decorating
Drain Front
Structure
and side
basement
Structure and basement