際際滷

際際滷Share a Scribd company logo
Knowledge management is a complex activity that cannot deliver business impact without a concrete plan. This
chapter introduces that plan: The 10-step KM road map that will guide you through strategizing, designing,
developing, and implementing a KM initiativewith your company in mind. Recall, this is a road map, not a
methodology with a deceptive look of a cookie-cutter formulation. Even if your competitors get to it, they
cannot apply it because knowledge is protected by context as copy-protected software is protected by
encryption.



This strengthening idiosyncrasy of knowledge also has a negative implication for you:-
You cannot easily copy a competitors KM strategy. Examples from your industrys leaders can be useful for
understanding KM, but they cannot show you the right way to do it. For these reasons, your KM system and
KM strategy will have to be unique to your company. What follows in the next four sections of this book is an
explication of the road map for developing an idiosyncratic knowledge strategy.




The four phases that the 10 steps of the road map comprise:
1. Infrastructural evaluation
2. KM system analysis, design, and development
3. System deployment
4. ROI and performance evaluation
The first phase of the 10-step technique involves two steps. In the first step, you analyze your existing
infrastructure, then identify concrete steps that you can take to leverage and build on your KM platform. In the
second step, you perform a strategic analysis to link KM objectives and business strategy.




STEP 1: ANALYSIS OF EXISTING INFRASTRUCTURE
In this first step, you gain an understanding of various components that constitute the KM strategy and
technology framework. By analyzing and accounting for what is already in place in your company, you can
identify critical gaps in the existing infrastructure. Consequently,you will be able to build on what already
exists. Instead of telling you what components to build on, I will guide you through the process of making those
decisions specifically in the context of your company. Although leveraging existing infrastructure is the
logically, scientifically, rationally, theoretically, common-sensically, and financially right approach, it also
standsa better chance of generating stronger management support for your KM project because ofthe perception
that you are not completely abandoning the old existing investments.

STEP 2: ALIGNING KNOWLEDGE MANAGEMENT AND BUSINESS STRATEGY
Business strategy is usually at a high level. Developing systems is always at a low level:
Specifications and features are needed, not abstractions or visions. The second step in the 10-step road map
allows you to make the connection between these two: Raise KM platform design to the level of business
strategy and pull strategy down to the level of systems design.




The second phase of KM implementation involves analysis, design, and development of the KM system.

The five steps that constitute this phase are:
1. KM architecture design and component selection
2. Knowledge audit and analysis
3. KM team design
4. Creation of a KM blueprint tailored for your organization
5. The actual systems development process

Examination of each this step and understanding the key tasks that need to be accomplished at each step.

STEP 3: KNOWLEDGE MANAGEMENT ARCHITECTURE AND DESIGN
As the third step toward deploying KM, you must select the infrastructural components that constitute the KM
system architecture. KM systems use a seven-layer architecture, and the technology required to build each layer
is readily available. Integrating these components to create the KM system model requires thinking in terms of
an infostructure, rather than an infrastructure. Your first big choice is the collaborative platform. We will reason
through the choice of the preferred collaborative platform to decide whether the Web or a proprietary platform is
better suited for your company. You will also identify and understand components of the collaborative
intelligence layer: artificial intelligence, data warehouses, genetic algorithms, neural networks, expert reasoning
systems, rule bases, and case-based reasoning. You will also examine how newer developments, such as peer-to-
peer platforms, hold promise
for corporate KM.

STEP 4: KNOWLEDGE AUDIT AND ANALYSIS
A KM project must begin with what your company already knows. In the fourth step, you audit and analyze
knowledge, but first you must understand why a knowledge audit is needed. Then you assemble an audit team
representing various organizational units, as described


STEP 5: DESIGNING THE KNOWLEDGE MANAGEMENT TEAM
In the fifth step on the KM road map, you form the KM team that will design, build, implement,and deploy your
companys KM system. To design an effective KM team, you must identify key stakeholders both within and
outside your company; identify sources of expertise that are needed to design, build, and deploy the system
successfully while balancing the technical and managerial requirements. We examine the issues of correctly
sizing the KM team, managing diverse and often divergent stakeholder expectations, and using techniques for
both identifying critical failure points in such teams.
STEP 6: CREATING THE KNOWLEDGE MANAGEMENT SYSTEM BLUEPRINT
The KM team identified in Step 5 builds on a KM blueprint that provides a plan for building and incrementally
improving a KM system. As you work toward designing a KM architecture,you must understand its seven layers
specifically in the context of your company and determine how each of these can be optimized for performance
and scalability, as well as high levels of interoperability. You will also see how to position and scope the KM
system to a feasible level where benefits exceed costs. Finally, you will see ways to future-proof the KM system
so that it does not run out of gas when the next wave of fancy technology hits the market. This step integrates
work from all preceding steps so that it culminates in a strategically oriented KM system design.

STEP 7: DEVELOPING THE KNOWLEDGE MANAGEMENT SYSTEM
Once you have created a blueprint for your KM system (Step 6), the next step is that of actually putting together
a working system. We will tackle the issues of integrating a system acrossdifferent layers to build a coherent and
stable KM platform.




The third phase in the 10-step road map involves the process of deploying the KM system that you built in the
preceding stages.

This phase involves two steps:

1. Deployment of the system with a results-driven incremental technique, more commonly known as the RDI
methodology. This step also involves the selection and implementation of a pilot project to precede the
introduction of a full-fledged KM system.

2. Cultural change, revised reward structures, and the choice of using (or not using) a CKO to make KM
produce results. This is perhaps the most important complementary step that is critical to the acceptance of a
KM system in any company.

.
STEP 8: PILOT TESTING AND DEPLOYMENT USING RDI METHODOLOGY
A large-scale project such as a typical KM system must take into account the actual needs of its users. Although
a cross-functional KM team can help uncover many of these needs, a pilot deployment is the ultimate reality
check. In the eighth step on the KM road map, you must decide how you can select cumulative releases with the
highest payoffs first. You will evaluate the need for a pilot project; if it is needed, select the right, nontrivial, and
representative pilot project. You will also appreciate scope issues and ways to identify and isolate failure points.
Finally, you will evaluate how to use the RDI methodology to deploy the system, using cumulative results-
driven business releases.

STEP 9: LEADERSHIP AND REWARD STRUCTURES
The most erroneous assumption that many companies make is that the intrinsic value of an innovation such as a
KM system will lead to its enthusiastic adoption and use. Knowledge sharing cannot be mandated: Your
employees are not like troops, they are like volunteers. Encouraging use and gaining employee support requires
new reward structures that motivate employees to use the system and contribute to its enthusiastic adoption.
Above all, it requires enthusiastic leadership that sets an example to follow. Chapter 13 guides you through
these leadership and incentive development issues.
The last phase involves one step that most companies have been struggling with: measuring business value of
KM. When pushed for hard data, managers have often resorted to ill-suited and easily misused approaches, such
as cost-benefit analysis, net present value (NPV) evaluation, vague ROI measures, or, at best, Tobins q.
Chapter 14 describes the traps that companies are most vulnerable to and suggests ways to avoid them while
devising a robust set of company-specific metrics for KM.

STEP 10: REAL-OPTIONS ANALYSIS FOR KNOWLEDGE MANAGEMENT
The tenth stepmeasuring ROImust account for both financial and competitive impactsof KM on your
business. This step guides you through the process of selecting an appropriate set of metrics and arriving at a
lean but powerful composite. We will use the Nobel Prizewinning real-options approach for analysis. We will
also evaluate many ways in which realoptions data can be tracked. We also see how successful companies have
approached metrics, what errors they have made in the past, and how you can learn from their mistakes. Being
able to measure returns serves two purposes: It arms you with hard data and dollar figures that you can use to
prove the impact of effective KM, and it lets you refine KM design through subsequent iterations.




The 10-step road map is built on years of cumulative research involving small and large companies in a variety
of industries worldwide. It is a road map thatunlike a cookie cutter methodologywill help you build both a
KM strategy and a KM system that is tailored to your company.

More Related Content

Kmi impelmentation strategy

  • 1. Knowledge management is a complex activity that cannot deliver business impact without a concrete plan. This chapter introduces that plan: The 10-step KM road map that will guide you through strategizing, designing, developing, and implementing a KM initiativewith your company in mind. Recall, this is a road map, not a methodology with a deceptive look of a cookie-cutter formulation. Even if your competitors get to it, they cannot apply it because knowledge is protected by context as copy-protected software is protected by encryption. This strengthening idiosyncrasy of knowledge also has a negative implication for you:- You cannot easily copy a competitors KM strategy. Examples from your industrys leaders can be useful for understanding KM, but they cannot show you the right way to do it. For these reasons, your KM system and KM strategy will have to be unique to your company. What follows in the next four sections of this book is an explication of the road map for developing an idiosyncratic knowledge strategy. The four phases that the 10 steps of the road map comprise: 1. Infrastructural evaluation 2. KM system analysis, design, and development 3. System deployment 4. ROI and performance evaluation
  • 2. The first phase of the 10-step technique involves two steps. In the first step, you analyze your existing infrastructure, then identify concrete steps that you can take to leverage and build on your KM platform. In the second step, you perform a strategic analysis to link KM objectives and business strategy. STEP 1: ANALYSIS OF EXISTING INFRASTRUCTURE In this first step, you gain an understanding of various components that constitute the KM strategy and technology framework. By analyzing and accounting for what is already in place in your company, you can identify critical gaps in the existing infrastructure. Consequently,you will be able to build on what already
  • 3. exists. Instead of telling you what components to build on, I will guide you through the process of making those decisions specifically in the context of your company. Although leveraging existing infrastructure is the logically, scientifically, rationally, theoretically, common-sensically, and financially right approach, it also standsa better chance of generating stronger management support for your KM project because ofthe perception that you are not completely abandoning the old existing investments. STEP 2: ALIGNING KNOWLEDGE MANAGEMENT AND BUSINESS STRATEGY Business strategy is usually at a high level. Developing systems is always at a low level: Specifications and features are needed, not abstractions or visions. The second step in the 10-step road map allows you to make the connection between these two: Raise KM platform design to the level of business strategy and pull strategy down to the level of systems design. The second phase of KM implementation involves analysis, design, and development of the KM system. The five steps that constitute this phase are: 1. KM architecture design and component selection 2. Knowledge audit and analysis 3. KM team design 4. Creation of a KM blueprint tailored for your organization 5. The actual systems development process Examination of each this step and understanding the key tasks that need to be accomplished at each step. STEP 3: KNOWLEDGE MANAGEMENT ARCHITECTURE AND DESIGN As the third step toward deploying KM, you must select the infrastructural components that constitute the KM system architecture. KM systems use a seven-layer architecture, and the technology required to build each layer is readily available. Integrating these components to create the KM system model requires thinking in terms of an infostructure, rather than an infrastructure. Your first big choice is the collaborative platform. We will reason through the choice of the preferred collaborative platform to decide whether the Web or a proprietary platform is better suited for your company. You will also identify and understand components of the collaborative intelligence layer: artificial intelligence, data warehouses, genetic algorithms, neural networks, expert reasoning systems, rule bases, and case-based reasoning. You will also examine how newer developments, such as peer-to- peer platforms, hold promise for corporate KM. STEP 4: KNOWLEDGE AUDIT AND ANALYSIS A KM project must begin with what your company already knows. In the fourth step, you audit and analyze knowledge, but first you must understand why a knowledge audit is needed. Then you assemble an audit team representing various organizational units, as described STEP 5: DESIGNING THE KNOWLEDGE MANAGEMENT TEAM In the fifth step on the KM road map, you form the KM team that will design, build, implement,and deploy your companys KM system. To design an effective KM team, you must identify key stakeholders both within and outside your company; identify sources of expertise that are needed to design, build, and deploy the system successfully while balancing the technical and managerial requirements. We examine the issues of correctly sizing the KM team, managing diverse and often divergent stakeholder expectations, and using techniques for both identifying critical failure points in such teams.
  • 4. STEP 6: CREATING THE KNOWLEDGE MANAGEMENT SYSTEM BLUEPRINT The KM team identified in Step 5 builds on a KM blueprint that provides a plan for building and incrementally improving a KM system. As you work toward designing a KM architecture,you must understand its seven layers specifically in the context of your company and determine how each of these can be optimized for performance and scalability, as well as high levels of interoperability. You will also see how to position and scope the KM system to a feasible level where benefits exceed costs. Finally, you will see ways to future-proof the KM system so that it does not run out of gas when the next wave of fancy technology hits the market. This step integrates work from all preceding steps so that it culminates in a strategically oriented KM system design. STEP 7: DEVELOPING THE KNOWLEDGE MANAGEMENT SYSTEM Once you have created a blueprint for your KM system (Step 6), the next step is that of actually putting together a working system. We will tackle the issues of integrating a system acrossdifferent layers to build a coherent and stable KM platform. The third phase in the 10-step road map involves the process of deploying the KM system that you built in the preceding stages. This phase involves two steps: 1. Deployment of the system with a results-driven incremental technique, more commonly known as the RDI methodology. This step also involves the selection and implementation of a pilot project to precede the introduction of a full-fledged KM system. 2. Cultural change, revised reward structures, and the choice of using (or not using) a CKO to make KM produce results. This is perhaps the most important complementary step that is critical to the acceptance of a KM system in any company. . STEP 8: PILOT TESTING AND DEPLOYMENT USING RDI METHODOLOGY A large-scale project such as a typical KM system must take into account the actual needs of its users. Although a cross-functional KM team can help uncover many of these needs, a pilot deployment is the ultimate reality check. In the eighth step on the KM road map, you must decide how you can select cumulative releases with the highest payoffs first. You will evaluate the need for a pilot project; if it is needed, select the right, nontrivial, and representative pilot project. You will also appreciate scope issues and ways to identify and isolate failure points. Finally, you will evaluate how to use the RDI methodology to deploy the system, using cumulative results- driven business releases. STEP 9: LEADERSHIP AND REWARD STRUCTURES The most erroneous assumption that many companies make is that the intrinsic value of an innovation such as a KM system will lead to its enthusiastic adoption and use. Knowledge sharing cannot be mandated: Your employees are not like troops, they are like volunteers. Encouraging use and gaining employee support requires new reward structures that motivate employees to use the system and contribute to its enthusiastic adoption. Above all, it requires enthusiastic leadership that sets an example to follow. Chapter 13 guides you through these leadership and incentive development issues.
  • 5. The last phase involves one step that most companies have been struggling with: measuring business value of KM. When pushed for hard data, managers have often resorted to ill-suited and easily misused approaches, such as cost-benefit analysis, net present value (NPV) evaluation, vague ROI measures, or, at best, Tobins q. Chapter 14 describes the traps that companies are most vulnerable to and suggests ways to avoid them while devising a robust set of company-specific metrics for KM. STEP 10: REAL-OPTIONS ANALYSIS FOR KNOWLEDGE MANAGEMENT The tenth stepmeasuring ROImust account for both financial and competitive impactsof KM on your business. This step guides you through the process of selecting an appropriate set of metrics and arriving at a lean but powerful composite. We will use the Nobel Prizewinning real-options approach for analysis. We will also evaluate many ways in which realoptions data can be tracked. We also see how successful companies have approached metrics, what errors they have made in the past, and how you can learn from their mistakes. Being able to measure returns serves two purposes: It arms you with hard data and dollar figures that you can use to prove the impact of effective KM, and it lets you refine KM design through subsequent iterations. The 10-step road map is built on years of cumulative research involving small and large companies in a variety of industries worldwide. It is a road map thatunlike a cookie cutter methodologywill help you build both a KM strategy and a KM system that is tailored to your company.