The document reports two successful tests conducted at the Exova facility in Dubai for KAFD Parcel 4.03. On 11/03/2013, a PMU test for a sloped and vertical fa巽ade passed, followed by a VMU inspection on 13/03/2013 that accepted extrusion louvers.