[INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT]                             May 2, 2012

   Name-Surname NuttapongHansiriwattanakit
      Student ID. 54261508
     Group Name Is
Engineering Team Jane , Best ,Not ,Su ,Jum-O ,Love , Tew ,Go ,Mut and
       Members Benz




  Product Design
                 Sa-tang ,Ped ,Fon ,Tip ,Earng[ID] and Mind [interior]
  Team Members




Weekly Progress

 Part one, we do circuit from PCB. We install electronic
 equipment on copper board. And a terminal connected to the
 circuit. After that, we have installed all components on the
 chassis.
 Part two, we have tested the circuit by the input power and
 water for the water heater. We found that the machine can
 operate as we wish.




       Figure 1.Install electronic equipment
                                                                 Figure 2.Test circuits

Engineering Analysis
Strong Point
    - The test circuit voltage of 220 V, we have to protect you by wearing shoes that are well
        grounded with electricity. Because it is very dangerous. On the electricity and water
        supplies.
Week Point

                                     Department of Control System and Instrumentation Engineering
                                        KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI
[INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT]                              May 2, 2012

    -   The test circuit, we cannot test it as many times as time is limited. It may cause an error in
        the circuit.

Next Week Job
Next week I will be checking everything. Prior to the presentation.




                                      Department of Control System and Instrumentation Engineering
                                         KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI

More Related Content

54261508 3

  • 1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] May 2, 2012 Name-Surname NuttapongHansiriwattanakit Student ID. 54261508 Group Name Is Engineering Team Jane , Best ,Not ,Su ,Jum-O ,Love , Tew ,Go ,Mut and Members Benz Product Design Sa-tang ,Ped ,Fon ,Tip ,Earng[ID] and Mind [interior] Team Members Weekly Progress Part one, we do circuit from PCB. We install electronic equipment on copper board. And a terminal connected to the circuit. After that, we have installed all components on the chassis. Part two, we have tested the circuit by the input power and water for the water heater. We found that the machine can operate as we wish. Figure 1.Install electronic equipment Figure 2.Test circuits Engineering Analysis Strong Point - The test circuit voltage of 220 V, we have to protect you by wearing shoes that are well grounded with electricity. Because it is very dangerous. On the electricity and water supplies. Week Point Department of Control System and Instrumentation Engineering KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI
  • 2. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] May 2, 2012 - The test circuit, we cannot test it as many times as time is limited. It may cause an error in the circuit. Next Week Job Next week I will be checking everything. Prior to the presentation. Department of Control System and Instrumentation Engineering KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI