The weekly report discusses the progress of an engineering team that is working on a product design. The team installed electronic equipment on a PCB board and connected terminals to the circuit. They then installed all components on a chassis and tested the circuit by inputting power and water, finding that the machine operated as intended. Their strong point was taking safety precautions when testing the 220V circuit. However, time limitations prevented fully testing the circuit, which could lead to errors. Next week they will check everything before presenting.
1 of 2
Download to read offline
More Related Content
54261508 3
1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] May 2, 2012
Name-Surname NuttapongHansiriwattanakit
Student ID. 54261508
Group Name Is
Engineering Team Jane , Best ,Not ,Su ,Jum-O ,Love , Tew ,Go ,Mut and
Members Benz
Product Design
Sa-tang ,Ped ,Fon ,Tip ,Earng[ID] and Mind [interior]
Team Members
Weekly Progress
Part one, we do circuit from PCB. We install electronic
equipment on copper board. And a terminal connected to the
circuit. After that, we have installed all components on the
chassis.
Part two, we have tested the circuit by the input power and
water for the water heater. We found that the machine can
operate as we wish.
Figure 1.Install electronic equipment
Figure 2.Test circuits
Engineering Analysis
Strong Point
- The test circuit voltage of 220 V, we have to protect you by wearing shoes that are well
grounded with electricity. Because it is very dangerous. On the electricity and water
supplies.
Week Point
Department of Control System and Instrumentation Engineering
KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI
2. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] May 2, 2012
- The test circuit, we cannot test it as many times as time is limited. It may cause an error in
the circuit.
Next Week Job
Next week I will be checking everything. Prior to the presentation.
Department of Control System and Instrumentation Engineering
KING MONGKUTs UNIVERSITY OF TECHNOLOGY THONBURI