This document outlines the process units and offsite prerequisite projects for Arvand Petrochemical Co. It lists the main units like CA, EDC/VCM, S&EPVC and olefin along with supporting units like cooling towers, salt washing, sulfuric acid concentration, MEG, brine and products transfer pipelines, and non-industrial buildings. It also includes oxygen as a listed item.
1 of 8
Downloaded 42 times
More Related Content
Arvand Petrochemical Pvc Plant
2. Arvand Petrochemical Co.
Process Units Offsite
Prerequisite Projects
CA,EDC/VCM,S&EPVC
Cooling Towers
Salt Washing Olefin
Sulfuric Acid Concentration MEG
Brine Transfer Pipe Lines
Products Transfer Pipelines To Jetty
None Industrial Buildings
Oxygen