Any thing you is under certain degree of risk?
BUT IS THE RISK TAKEN IN A RIGHT MANNER WITH MINIMUM BIAS.
TAKE WINNING RISK RATHER THAN; A BIASED RISK OR
TOSE DECIDED RISK.
DO IT IN A SMART WAY !
1 of 7
Download to read offline
More Related Content
Take right risk
1. RISK PRIORITY NUMBER (RPN) IDENTIFIES
QUANTUM OF RISK FOR PRIORATISING
ACTIONS.
RPN IS BASED ON; SEVERITY OF PROBLEM,
LIKELYHOOD OF OCCURANCE AND
LIKELIHOOD OF DETECTION.
2. MANY TIMES YOU END UP WITH SAME RPN
NUMBER UNLESS YOU BRING IN SOME BIAS
TO MAKE DIFFERENCE.
FOR EXAMPLE :-
RPN = Severity*Occurrence*Detection =9X 5X4
=180
RPN =
Severity*Occurrence*Detection=3X6X10=180.
3. WHICH ONE WILL YOU PRIORIZE ?
IS YOUR LIKELY BIAS / OVERE
ESTAMATION BLURRING THINGS?
ARE YOU AGAIN SUBJECTIVE ON THIS
SUBJECTIVE ARRIVED RPN NUMBER?
4. CAN YOU BRING IN A SMART FACTOR
FOR THE SITUATION?
SMART FACTOR IN THIS CASE IS
SIGNIFICANT, MEANINGFUL,
APPROPRIATE,REASONABLE,TIME-SENSITIVE
MEASURE.
WHAT IS THAT ?
5. CALCULATE - S/OPD,O/RPN,D/RPN.TAKE
MAXIMUM OF THEE THREE.
WE WILL CALL THIS WEIGHT INDEX.
SO THIS WILL BE 1/20 & 1/18
RESPECTIVELY FOR ABOVE CASE.
6. MULTIPLY RPN WITH THIS INDEX.
THAKE THE WEIGHED RPN NUMBER FOR
DECIDING PRIORITY.
NOW YOU ARE SMARTER AND THE
MEASURE IS SMART WITH LIKELY BIAS
ELIMINATED