About
 Resolved critical vibration issue in Central Gas Station (CGS # 1). HWP 700hp, 1778Rpm, 4160V. On bearing NDE was having high noise at the operating speed and by using spectrum analysis we find the problem on outerrace bearing.
 Resolved critical vibration issue in Central Gas Station Area – 10 (CGS # 10), WWI 700hp Sincronouse motor. Vibration issue by carrying out unbalance on impeller pump multi stages.
 Resolved critical vibration issue in Central Gas Station – 3 (CGS # 3), GFW Pump 700hp – 1780 Rpm – 4160Volt. Was having looseness foundation and appear high vibration on horizontal direction and by cross chanel phase technique to detect this problem (reinforce found..