際際滷

際際滷Share a Scribd company logo
Ramesh.pRamesh.p
Cell No UAE +971-501516425
Cell No IND +919843532841
E-Mail:- pramesh71172@gmail.com
Address: - DESCON Engineering Abu Dhabi, UAE.
Pre commissioning &commissioning supervisor
To obtain a position that will enable me to use my strong Operational/
Maintenance skills with educational background, and ability to work well
with people..
Page 1
Fathers Name PALANISAMY
Date of Birth 15-11-1972
Religion Hindu
Passport # F-8089318
Nationality INDIAN,
Material Status MARRIED
Degree Board/University
DIPLOMA IN MECHANICAL
ENGINEER
STATE BOARD,TAMIL NADU-INDIA
Career Objective
Personal Details
Qualification Details
Position Applied For
Employer Larsen & Toubro ECC LTD Petrolem Expansion project
Godimoga, Kakinada, Andhara Pradesh India
Contractor Reliance Petroleum Limited
Position Commissioning Field Operator
Duration 7 AUG 2007 to 20 OCT 2009
Employer Brunel India Ltd, Mangala processing unit
Rajasthan
Contractor cairn india
Position Commissioning Field Operator
Duration 14 MAY 2005 to 22 JUN 2007
Page 2
Employer
. DESCON Engineering Ltd. Ruwais Refinery Expasion
project-1340 Takreer AbuDhabi UAE
client
Daewoo Engineering &company
Position Pre commissioning &commissioning Supervisor
Duration 27 FEB 2013 to still Date
Employer DESCON Engineering Ltd. Integrated Gas Development Project-
1335 Habshan-5 Abu Dhabi UAE.
Contractor Japan Gas Corporation Joint Venture with Tecnimont
Client Abu Dhabi Gas Company Limited
Position Commissioning supervisor
Duration 2 JAN 2012 to 29 JAN 2013
.
Employer Nasar Al Hajiri co Ltd Qatar Gas Slphur Recovery Unit
Contractor
Client
Chiyoda &Technip joint venture
Qatar Gas (S R U)
Position Pre commissioning &commissioning supervisor
Duration 25 NOV 2009 to 16 OCT 2011
Employer Sam Fire Serivces
ONGC Mumbai High Offshore Rigs &Platform
Contractor Mumbai India Ltd
Position Commissioning Field Operator
Duration 23 DEC 2003 to 18 MAR 2005
 Fire Prevention and Fire Fighting
 Proficiency in elementary first Aid
 ILM  Silver Certificate (International Leadership Management) by ILM,
London from Qatar
Training Institute.
 PTSW (PERMIT TO START WORK)
 Computer Based Training & Authorized Gas Tester Training
 IIF (INCIDENT INJURE FREE)
 FLAWLESS STARTUP
 Assisting client and company in commissioning and in start-ups.
 Carries out routine Inspection, Servicing and minor Maintenance works on
process
equipments like pumps, Exchangers, process flow lines, valves ( Manual and
Instrument),
gauges (pressure, TT Etc..) , Instruments Indicators (pressure, flow and TI Etc..),
Capillary
tubes/Plug/Manifolds and also rectifying any gas/oil leaks on these above
instruments.
 Inspecting, servicing, isolating, removing, repairing and installing of variety of
equipment
Page 3
ADDITIONAL QUALIFICATION AND TRAINING
Responsibilities
including valves, flanges, metering equipment, flow line, flare lines and chemical
Injection lines.
 Responsible to direct the maintenance activities and hand over as per PTW
procedure.
 Maintaining continuous contact with various areas of the entire plant to keep
overall operating condition.
 Trouble shoots plant operations and taken corrective actions to minimum loss of
production.
 Alarm monitoring, Fault diagnosis, Malfunction detection system.
 Communication, record keeping, reporting.
 Coordination with shift in charge and other process operators for smooth
operation.
 Coordinating with service departments for preventive, shutdown and breakdown
jobs.
 Shutdown &Startup planning, major maintenance programs and plant
modification work
 Punch list checks, pumps and drivers run-in test, commissioning Process and
Utility systems.
Having experience in H2S Awareness and handling all types of fire and safety
equipments.
 Regular patrol and ensure that equipment performance in the designed safe
manner and that
standby spare equipment are available for immediate use if required.
 Participating the first intention team for managing emergencies in the plant
 Total Productivity Maintenance(TPM), Training and Implementation
JOB PROBILE
GAS PLANT OPERATIONS
GASCO Habsan- 5
 Startup and Operations of Condensate stabilization units, Lean gas Compression, Fuel gas
system and Feed gas Compression Unit.
 ORTLOFF Co NGL recovery unit including Molecular sieve gas adsorption (Gas/Liquid
dehydration) and Mercury adsorption.
 Demethaniser, Cold box, Turbo Expander and Recompressor cryogenic system.
 Propane refrigeration, Residue gas compression and regeneration gas compression
system.
Page 4
 Sour water treatment Unit start up, shutdown of Clean and Dirty sour water units,
Operations
of flash gas compressor, Pumps and Heat exchangers.
 Highly skilled in startup, Trouble shooting and shutdown activities of Centrifugal
compressors
(Motor operated and Steam turbine).
 Flare system (Acid, Hydrocarbon and Low temperature flare) commissioning, startup and
operations including flame front generator and vapor recovery package.
 GAS AUTHORITY OF INDIA GAIL (INDIA) LTD, PATA
LPG Recovery Plant designed to process 12 MMSCMD of natural gas to produce 258250 TPA
of
LPG cryogenic turbo expansion process
 Job role including start up and Operations of the below equipments and Units
Feed gas compressor
Gas Drying and regeneration section.
C2/C3 Recovery
Propane Refrigerants
Gas expansion section. (Turbo-expander  make  Atlas Cop co rot flow)
Furnace operations
Propane Unloading and Transfer Operation
REFINERY OPERATIONS
Reliance Industries.
 Worked in MAB and Wet gas Compressor Section
 Startup, Operation and Shutdown activities of Main Air Blower(Elliot Ebara Compressor)
 Startup, Operation and Shutdown activities of Wet Gas Compressor(Elliot Ebara
Compressor)
 Maintaining continuous contact with various areas of the entire plant to keep overall
operating
condition.
 Trouble shoots plant operations and taken corrective actions to minimum loss of production.
 Alarm monitoring, Fault diagnosis, Malfunction detection system.
 Communication, record keeping, reporting.
 Coordination with shift in charge and other process operators for smooth operation.
Page 5
 Coordinating with service departments for preventive, shutdown and breakdown jobs.
 Shutdown &Startup planning, major maintenance programs and plant modification work
UTILITIES OPERATIONS
 Worked in Oxygen and chlorine-dioxide plant, Vapor Absorption Refrigeration system
 Production of Oxygen using Pressure Swing Adsorption method Capacity : 4000 NM3/HR
 Production of Chlorine dioxide Plant of Capacity : 20 TPD
 Vapor Absorption chiller-4 Nos of 550 Tons of Refrigerants
 Worked in ABB DCS system
 Attended Factories Acceptance Test in ABB India Ltd,Bangalore
 Undergone ADVANCED PROCESS CONTROL(APC) Training in YOKOGAWA India Ltd,
Bangalore
 As a Team Leader Successfully Implemented APC resulted in Increased in production and
decrease in chemical Consumptions
 Air Compressor Operations for Instrument air, Cooling water Towers and Pumps
 Operations of Water treatment plants, Sand Filters, Ion Exchange Water treatment Plants.
 Laboratory analysis of all types of chemicals and water analysis.
PRE-COMMISSIONING:
Leak testing, All type of cleaning, Steam and Oil flushing, Air blowing, Chemical cleaning,
Tightness
test, card-board blasting, Testing of Gasket. All vessels hydrostatic testing, Pipe line testing,
Inter-lock
checking, PCV stoke checking, Prepare all utility facility like-Instrument air and plant air,
Service
water, Cooling water system, Fuel Gas system, Sewer and Drainage system.
COMMISSIONING :
o Blind checking & Removing, Inert gas charging & Purging, Leak testing, De-
pressurization, Vessel
o entry, Hot and Cold work permit, HC charging/Gas-In, Leak testing up to vessel
Operating pressure,
o Line up the system for Gas-In, Maintenance activities, and Preparation of Blind list,
Isolation plans for
o shutdown activities, Mechanical run of All types of Pumps, Steam turbine and
Compressors.
Page 6
DECLARATION
I hereby declare that the above given details are true to the best of my knowledge.
Yours truly,
Page 7
Computer Skills  MS Special : Microsoft Visio & Microsoft Project.
 MS Office : Professional use of Microsoft Office
2007
.
Languages English, Urdu, Hindi,Tamil,telgu

More Related Content

What's hot (20)

DOCX
bismilla operation & comissioning
Bismilla Syed
DOCX
Kannan resume
senthamarai kannan
DOC
JPE.doc
joseph rajan
DOC
Operation Refinery - Mayur resume
Mayur Amin
DOC
CV Dian Risdiana
dian risdiana
DOC
RANJEET PRAJAPATI-RESUME
RANJEET PARAJAPATI
PDF
1Nader-SeniorOperator-CV
Nader Abdelgayed
DOC
Process plant operator Shabeer Ahmad
shabeer ahmad
DOC
chinna terminal operator.
chinna praveen kumar
DOC
maneesh cv
Maneesh Kumar
DOC
RAJU LETEST UTILITY RESUME
Ghulam Sarwer
PDF
Bansil Resume field operator
Bansil Gandhi
DOCX
SENTHIL PANDIAN CV
Senthil Pandian
DOCX
Ebrayeem cv
G.Ebrayeem Gnanakkan
DOC
Edta cleaning procedurefor_150mw[1]
Vishal Modi
DOCX
Chlor alkali 2016
SURESHKUMAR MUTHURAMALINGAM
DOCX
Chlor alkali plant Control room operator & Plant Operations
SURESHKUMAR MUTHURAMALINGAM
PDF
Catalyst Breakage in Reformer Tubes
Gerard B. Hawkins
PPT
Chemical cleaning
Coolrich Engineering (M) Sdn Bhd
DOC
SYED NAVEED ALI cv
syednaveed ali
bismilla operation & comissioning
Bismilla Syed
Kannan resume
senthamarai kannan
JPE.doc
joseph rajan
Operation Refinery - Mayur resume
Mayur Amin
CV Dian Risdiana
dian risdiana
RANJEET PRAJAPATI-RESUME
RANJEET PARAJAPATI
1Nader-SeniorOperator-CV
Nader Abdelgayed
Process plant operator Shabeer Ahmad
shabeer ahmad
chinna terminal operator.
chinna praveen kumar
maneesh cv
Maneesh Kumar
RAJU LETEST UTILITY RESUME
Ghulam Sarwer
Bansil Resume field operator
Bansil Gandhi
SENTHIL PANDIAN CV
Senthil Pandian
Ebrayeem cv
G.Ebrayeem Gnanakkan
Edta cleaning procedurefor_150mw[1]
Vishal Modi
Chlor alkali 2016
SURESHKUMAR MUTHURAMALINGAM
Chlor alkali plant Control room operator & Plant Operations
SURESHKUMAR MUTHURAMALINGAM
Catalyst Breakage in Reformer Tubes
Gerard B. Hawkins
SYED NAVEED ALI cv
syednaveed ali

Similar to remesh new (20)

DOC
Ramesh com (1)
ramesh palanisamy
PDF
Radha Krishna 06-08-2015
radha krishna chilukalapalli
DOC
Resume1
Pradeep Singh
DOC
pavan_DCS
pavan kumar
DOC
CV3
Ganesh Salvi
DOC
Subbiah May 16
subbiah as
DOC
Raiyani cv
rakeshraiyani
DOCX
CURRENT CV1 2015
Basiru Osuman
DOC
shibu resume
shibu kesavan nair
RTF
Dharmesh CV
Dharmesh Ghataliya
DOC
RESUME
GEORGE PAUL
DOC
Prashant pal cv
prashant pal
DOC
lemirandacv
Leandro Esmeralda Miranda
DOC
Bhavdeep Resume
BHAVDEEP SHARMA
DOC
cv nrs cpp1
Naresh Soni
DOCX
Ravindra CV
Ravindrapuri Goswami
DOCX
ramshad process
ramshad neerani
DOC
Resume Suresh Patel
Suresh J. Patel
DOC
Resume
saiprasad sahoo
Ramesh com (1)
ramesh palanisamy
Radha Krishna 06-08-2015
radha krishna chilukalapalli
Resume1
Pradeep Singh
pavan_DCS
pavan kumar
Subbiah May 16
subbiah as
Raiyani cv
rakeshraiyani
CURRENT CV1 2015
Basiru Osuman
shibu resume
shibu kesavan nair
Dharmesh CV
Dharmesh Ghataliya
RESUME
GEORGE PAUL
Prashant pal cv
prashant pal
Bhavdeep Resume
BHAVDEEP SHARMA
cv nrs cpp1
Naresh Soni
Ravindra CV
Ravindrapuri Goswami
ramshad process
ramshad neerani
Resume Suresh Patel
Suresh J. Patel
Ad

remesh new

  • 1. Ramesh.pRamesh.p Cell No UAE +971-501516425 Cell No IND +919843532841 E-Mail:- pramesh71172@gmail.com Address: - DESCON Engineering Abu Dhabi, UAE. Pre commissioning &commissioning supervisor To obtain a position that will enable me to use my strong Operational/ Maintenance skills with educational background, and ability to work well with people.. Page 1 Fathers Name PALANISAMY Date of Birth 15-11-1972 Religion Hindu Passport # F-8089318 Nationality INDIAN, Material Status MARRIED Degree Board/University DIPLOMA IN MECHANICAL ENGINEER STATE BOARD,TAMIL NADU-INDIA Career Objective Personal Details Qualification Details Position Applied For
  • 2. Employer Larsen & Toubro ECC LTD Petrolem Expansion project Godimoga, Kakinada, Andhara Pradesh India Contractor Reliance Petroleum Limited Position Commissioning Field Operator Duration 7 AUG 2007 to 20 OCT 2009 Employer Brunel India Ltd, Mangala processing unit Rajasthan Contractor cairn india Position Commissioning Field Operator Duration 14 MAY 2005 to 22 JUN 2007 Page 2 Employer . DESCON Engineering Ltd. Ruwais Refinery Expasion project-1340 Takreer AbuDhabi UAE client Daewoo Engineering &company Position Pre commissioning &commissioning Supervisor Duration 27 FEB 2013 to still Date Employer DESCON Engineering Ltd. Integrated Gas Development Project- 1335 Habshan-5 Abu Dhabi UAE. Contractor Japan Gas Corporation Joint Venture with Tecnimont Client Abu Dhabi Gas Company Limited Position Commissioning supervisor Duration 2 JAN 2012 to 29 JAN 2013 . Employer Nasar Al Hajiri co Ltd Qatar Gas Slphur Recovery Unit Contractor Client Chiyoda &Technip joint venture Qatar Gas (S R U) Position Pre commissioning &commissioning supervisor Duration 25 NOV 2009 to 16 OCT 2011
  • 3. Employer Sam Fire Serivces ONGC Mumbai High Offshore Rigs &Platform Contractor Mumbai India Ltd Position Commissioning Field Operator Duration 23 DEC 2003 to 18 MAR 2005 Fire Prevention and Fire Fighting Proficiency in elementary first Aid ILM Silver Certificate (International Leadership Management) by ILM, London from Qatar Training Institute. PTSW (PERMIT TO START WORK) Computer Based Training & Authorized Gas Tester Training IIF (INCIDENT INJURE FREE) FLAWLESS STARTUP Assisting client and company in commissioning and in start-ups. Carries out routine Inspection, Servicing and minor Maintenance works on process equipments like pumps, Exchangers, process flow lines, valves ( Manual and Instrument), gauges (pressure, TT Etc..) , Instruments Indicators (pressure, flow and TI Etc..), Capillary tubes/Plug/Manifolds and also rectifying any gas/oil leaks on these above instruments. Inspecting, servicing, isolating, removing, repairing and installing of variety of equipment Page 3 ADDITIONAL QUALIFICATION AND TRAINING Responsibilities
  • 4. including valves, flanges, metering equipment, flow line, flare lines and chemical Injection lines. Responsible to direct the maintenance activities and hand over as per PTW procedure. Maintaining continuous contact with various areas of the entire plant to keep overall operating condition. Trouble shoots plant operations and taken corrective actions to minimum loss of production. Alarm monitoring, Fault diagnosis, Malfunction detection system. Communication, record keeping, reporting. Coordination with shift in charge and other process operators for smooth operation. Coordinating with service departments for preventive, shutdown and breakdown jobs. Shutdown &Startup planning, major maintenance programs and plant modification work Punch list checks, pumps and drivers run-in test, commissioning Process and Utility systems. Having experience in H2S Awareness and handling all types of fire and safety equipments. Regular patrol and ensure that equipment performance in the designed safe manner and that standby spare equipment are available for immediate use if required. Participating the first intention team for managing emergencies in the plant Total Productivity Maintenance(TPM), Training and Implementation JOB PROBILE GAS PLANT OPERATIONS GASCO Habsan- 5 Startup and Operations of Condensate stabilization units, Lean gas Compression, Fuel gas system and Feed gas Compression Unit. ORTLOFF Co NGL recovery unit including Molecular sieve gas adsorption (Gas/Liquid dehydration) and Mercury adsorption. Demethaniser, Cold box, Turbo Expander and Recompressor cryogenic system. Propane refrigeration, Residue gas compression and regeneration gas compression system. Page 4
  • 5. Sour water treatment Unit start up, shutdown of Clean and Dirty sour water units, Operations of flash gas compressor, Pumps and Heat exchangers. Highly skilled in startup, Trouble shooting and shutdown activities of Centrifugal compressors (Motor operated and Steam turbine). Flare system (Acid, Hydrocarbon and Low temperature flare) commissioning, startup and operations including flame front generator and vapor recovery package. GAS AUTHORITY OF INDIA GAIL (INDIA) LTD, PATA LPG Recovery Plant designed to process 12 MMSCMD of natural gas to produce 258250 TPA of LPG cryogenic turbo expansion process Job role including start up and Operations of the below equipments and Units Feed gas compressor Gas Drying and regeneration section. C2/C3 Recovery Propane Refrigerants Gas expansion section. (Turbo-expander make Atlas Cop co rot flow) Furnace operations Propane Unloading and Transfer Operation REFINERY OPERATIONS Reliance Industries. Worked in MAB and Wet gas Compressor Section Startup, Operation and Shutdown activities of Main Air Blower(Elliot Ebara Compressor) Startup, Operation and Shutdown activities of Wet Gas Compressor(Elliot Ebara Compressor) Maintaining continuous contact with various areas of the entire plant to keep overall operating condition. Trouble shoots plant operations and taken corrective actions to minimum loss of production. Alarm monitoring, Fault diagnosis, Malfunction detection system. Communication, record keeping, reporting. Coordination with shift in charge and other process operators for smooth operation. Page 5
  • 6. Coordinating with service departments for preventive, shutdown and breakdown jobs. Shutdown &Startup planning, major maintenance programs and plant modification work UTILITIES OPERATIONS Worked in Oxygen and chlorine-dioxide plant, Vapor Absorption Refrigeration system Production of Oxygen using Pressure Swing Adsorption method Capacity : 4000 NM3/HR Production of Chlorine dioxide Plant of Capacity : 20 TPD Vapor Absorption chiller-4 Nos of 550 Tons of Refrigerants Worked in ABB DCS system Attended Factories Acceptance Test in ABB India Ltd,Bangalore Undergone ADVANCED PROCESS CONTROL(APC) Training in YOKOGAWA India Ltd, Bangalore As a Team Leader Successfully Implemented APC resulted in Increased in production and decrease in chemical Consumptions Air Compressor Operations for Instrument air, Cooling water Towers and Pumps Operations of Water treatment plants, Sand Filters, Ion Exchange Water treatment Plants. Laboratory analysis of all types of chemicals and water analysis. PRE-COMMISSIONING: Leak testing, All type of cleaning, Steam and Oil flushing, Air blowing, Chemical cleaning, Tightness test, card-board blasting, Testing of Gasket. All vessels hydrostatic testing, Pipe line testing, Inter-lock checking, PCV stoke checking, Prepare all utility facility like-Instrument air and plant air, Service water, Cooling water system, Fuel Gas system, Sewer and Drainage system. COMMISSIONING : o Blind checking & Removing, Inert gas charging & Purging, Leak testing, De- pressurization, Vessel o entry, Hot and Cold work permit, HC charging/Gas-In, Leak testing up to vessel Operating pressure, o Line up the system for Gas-In, Maintenance activities, and Preparation of Blind list, Isolation plans for o shutdown activities, Mechanical run of All types of Pumps, Steam turbine and Compressors. Page 6
  • 7. DECLARATION I hereby declare that the above given details are true to the best of my knowledge. Yours truly, Page 7 Computer Skills MS Special : Microsoft Visio & Microsoft Project. MS Office : Professional use of Microsoft Office 2007 . Languages English, Urdu, Hindi,Tamil,telgu