際際滷

際際滷Share a Scribd company logo
Design Automation Solutions
            by
Transformation速
the new way to design Transformers
Product Specification
Design Automation of two types of transformer

o   Pole Mount Transformer   o Ground Mount Transformer (200 to 10000 KVA)

        (Up to 500 KVA )




                                        -With Panel Cooling      -With Fin Cooling
                                         (ONAN / ONAF)
Product Specification
The Need for Transformation速

 To support the growing demand and standardizing the product design
  in the design process of Distribution Transformers
 Optimise Cooling calculations and radiator positions
 Standard parts Arrangement maintaining minimum electrical
  clearances
 Design to be Manufactured across the globe
 Eliminate approximation in Quotes to the client and to manufacturing
 Link between Quotations and Contracts
 Knowledge Capture and Reuse
Design Process
                                                        Tender              1. Customer Specification Document                                                                            Tender              1. Customer Specification Document
                                                                            2. Check List of Specifications                                                                                                   2. Check List of Specifications
                                                                            3. Reference Drawings of similar type if any                                                                                      3. Reference Drawings of similar type if any
                                                      Inputs from           4. Communications                                                                                           Inputs from           4. Communications
                                                         Sales              5. Contract Number                                                                                             Sales              5. Contract Number
                                                                            6. Top Assembly Number                                                                                                            6. Top Assembly Number
1. Schedule                                                                 7. Delivery Date                                      1. Schedule                                                                 7. Delivery Date
2. Job Number                                                                                                                     2. Job Number
3. Basic BOM (Classify high lead time items)     Inputs from Planning                                                             3. Basic BOM (Classify high lead time items)     Inputs from Planning
4. Top Mechanical and Electrical Asm.             (Product Structure)                                                             4. Top Mechanical and Electrical Asm.             (Product Structure)
Numbers                                                                                                                           Numbers
5. Special Requirements                                                                                                           5. Special Requirements

                                                                                      1. Electrical Design                                                                                                              1. Electrical Design
                                                 Electrical Inputs as a                                                                                                            Electrical Inputs as a
                                                                                      Data                                                                                                                              Data
                                                    Excel document                                                                                                                    Excel document
                                                                                      2. Electrical Test Data                                                                                                           2. Electrical Test Data

                                                                            OUTPUT                                                                                                                            OUTPUT
                                                 Feeding the electrical                                                                                                            Feeding the electrical     1. BOMs with required
                                                                            1. BOMs with required
                                                      Inputs into                                                                                                                       Inputs into           Part Dimensions
                                                                            Part Dimensions
                                                     Spreadsheet                                                                                                                       Spreadsheet




                 Basic Parameters to                                                                                                               Basic Parameters to
                 Find Match from                  Finding the similar                                                                              Find Match from                  Finding the similar
                 Database                          Rating Models in                                                                                Database                          Rating Models in
                                                                                     NO                                                                                                  Database                      NO
                 1. Rating                             Database                                                                                    1. Rating
                 2. Customer                                                                                                                       2. Customer
                 3. Connections                                                                                                                    3. Connections
                                                          YES                                                                                                                               YES

                                                                                                                           Application Process                                   Modify the Existing Models   Designing of
                                               Modify the Existing Models   Designing of
                                                                            Models as per                                                                                        as per new requirements if   Models as per
                                               as per new requirements if
                                                                             the BOM                                                                                                        any                the BOM
                                                          any


                                                                                                                                                                                         Validation
                                                       Validation


                                                                                                                                                                                      3D and 2D for
                                                    3D and 2D for
                                                                                                                                                                                      Manufacturing
                                                    Manufacturing                                                                                                                                             Manual
                                                                            Manual                                                                                                                             Entry          Vantage
                                                                             Entry          Vantage
                                                                                                                                                                                      Bill of Material
                                                    Bill of Material




                       Current Design Process                                                                                                    Process using Transformation速
Development Platform

Software
 Solidworks / Inventor / Pro-Engineer
 VB.Net 2003
 MS SQL 2000
Production Hardware
 Intel Xeon Core2 Duo 3.00 Ghz
 RAM : 8 GB
 NVIDIA Quadro FX3500 with 256 MB RAM
The Design Challenges

 Maintaining Optimum Tank Space Utilisation
 Optimisation of Tank dimensions
 Electrical and mechanical clearances
 Combination of Panel radiators for effective cooling
 Default and Custom Bushing positions
 Placement of Accessories
 60% of Custom Components & 40% of Standard parts
 Accommodating continuous change in the customer
  requirement
Salient Features of Transformation速

   Does the complete Design and Optimization of

      Fin Dimensions (Height, Depth and Pitch)

      Tank Dimensions

      Cold Oil Level

      Panel Radiator Height

      Number of Radiator Panels

      Selection of Radiator Banks position based on Bushing Arrangement

      Core Frame Selection



   Interference checking within the User Interface Level and Provision to the User
    to modify the Location / Position of a Accessory
Salient Features of Transformation速

   Standard Components (Brought out) will be accessed by the application from the
    Client Server (External Location)

   Different Output options from the Application

      Complete Transformer (Default)

      Core and Coil Assembly

      Complete Transformer without Core and Coil Assembly

   Admin Module to Add / Modify the specific Data Base Values

   ERP (Material Database) connection

   Default and Custom bushing positions

   Generation of Electrical Wiring Diagram and Bill of Materials
速
Transformation Demo
The Total Transformation速


                       Normal Way       Transformation速 way

Detail Design (OGA & Part Drawings)
Efforts               48-96 Man Hours   2-4 Man Hours
Duration               6-12 Days        -
Quotation Drawing (OGA Only)
Efforts                32 Man Hours     2 Man Hours
Duration               4 Days           -
ABOUT IDOLA FORI
 Idola Fori (Eye Dola For eye) was started in the year 2000 as a limited company with the idea
     of a complete design to manufacture to Market concept.

 Today we are
  Privately held Limited Company
  10 Years in the Engineering Services Industry
  Having development center in Hyderabad
  30 people Mix of Mechanical and Software Engineers
  Extensive experience in Glass Containers, Glass Equipments, Electrical Equipments,
    Material Handling Equipments and Packaging Tools
  Working with industry leaders around the globe on various other segments like HVAC
    Equipments, Drill Rigs, Rubber Seals, Printing Machines, etc
THANK YOU

More Related Content

Transformation

  • 2. Transformation速 the new way to design Transformers
  • 3. Product Specification Design Automation of two types of transformer o Pole Mount Transformer o Ground Mount Transformer (200 to 10000 KVA) (Up to 500 KVA ) -With Panel Cooling -With Fin Cooling (ONAN / ONAF)
  • 5. The Need for Transformation速 To support the growing demand and standardizing the product design in the design process of Distribution Transformers Optimise Cooling calculations and radiator positions Standard parts Arrangement maintaining minimum electrical clearances Design to be Manufactured across the globe Eliminate approximation in Quotes to the client and to manufacturing Link between Quotations and Contracts Knowledge Capture and Reuse
  • 6. Design Process Tender 1. Customer Specification Document Tender 1. Customer Specification Document 2. Check List of Specifications 2. Check List of Specifications 3. Reference Drawings of similar type if any 3. Reference Drawings of similar type if any Inputs from 4. Communications Inputs from 4. Communications Sales 5. Contract Number Sales 5. Contract Number 6. Top Assembly Number 6. Top Assembly Number 1. Schedule 7. Delivery Date 1. Schedule 7. Delivery Date 2. Job Number 2. Job Number 3. Basic BOM (Classify high lead time items) Inputs from Planning 3. Basic BOM (Classify high lead time items) Inputs from Planning 4. Top Mechanical and Electrical Asm. (Product Structure) 4. Top Mechanical and Electrical Asm. (Product Structure) Numbers Numbers 5. Special Requirements 5. Special Requirements 1. Electrical Design 1. Electrical Design Electrical Inputs as a Electrical Inputs as a Data Data Excel document Excel document 2. Electrical Test Data 2. Electrical Test Data OUTPUT OUTPUT Feeding the electrical Feeding the electrical 1. BOMs with required 1. BOMs with required Inputs into Inputs into Part Dimensions Part Dimensions Spreadsheet Spreadsheet Basic Parameters to Basic Parameters to Find Match from Finding the similar Find Match from Finding the similar Database Rating Models in Database Rating Models in NO Database NO 1. Rating Database 1. Rating 2. Customer 2. Customer 3. Connections 3. Connections YES YES Application Process Modify the Existing Models Designing of Modify the Existing Models Designing of Models as per as per new requirements if Models as per as per new requirements if the BOM any the BOM any Validation Validation 3D and 2D for 3D and 2D for Manufacturing Manufacturing Manual Manual Entry Vantage Entry Vantage Bill of Material Bill of Material Current Design Process Process using Transformation速
  • 7. Development Platform Software Solidworks / Inventor / Pro-Engineer VB.Net 2003 MS SQL 2000 Production Hardware Intel Xeon Core2 Duo 3.00 Ghz RAM : 8 GB NVIDIA Quadro FX3500 with 256 MB RAM
  • 8. The Design Challenges Maintaining Optimum Tank Space Utilisation Optimisation of Tank dimensions Electrical and mechanical clearances Combination of Panel radiators for effective cooling Default and Custom Bushing positions Placement of Accessories 60% of Custom Components & 40% of Standard parts Accommodating continuous change in the customer requirement
  • 9. Salient Features of Transformation速 Does the complete Design and Optimization of Fin Dimensions (Height, Depth and Pitch) Tank Dimensions Cold Oil Level Panel Radiator Height Number of Radiator Panels Selection of Radiator Banks position based on Bushing Arrangement Core Frame Selection Interference checking within the User Interface Level and Provision to the User to modify the Location / Position of a Accessory
  • 10. Salient Features of Transformation速 Standard Components (Brought out) will be accessed by the application from the Client Server (External Location) Different Output options from the Application Complete Transformer (Default) Core and Coil Assembly Complete Transformer without Core and Coil Assembly Admin Module to Add / Modify the specific Data Base Values ERP (Material Database) connection Default and Custom bushing positions Generation of Electrical Wiring Diagram and Bill of Materials
  • 12. The Total Transformation速 Normal Way Transformation速 way Detail Design (OGA & Part Drawings) Efforts 48-96 Man Hours 2-4 Man Hours Duration 6-12 Days - Quotation Drawing (OGA Only) Efforts 32 Man Hours 2 Man Hours Duration 4 Days -
  • 13. ABOUT IDOLA FORI Idola Fori (Eye Dola For eye) was started in the year 2000 as a limited company with the idea of a complete design to manufacture to Market concept. Today we are Privately held Limited Company 10 Years in the Engineering Services Industry Having development center in Hyderabad 30 people Mix of Mechanical and Software Engineers Extensive experience in Glass Containers, Glass Equipments, Electrical Equipments, Material Handling Equipments and Packaging Tools Working with industry leaders around the globe on various other segments like HVAC Equipments, Drill Rigs, Rubber Seals, Printing Machines, etc