This document summarizes an industrial training program at Leela Electric Power Services Pvt. Ltd. from May 1-30, 2015. It discusses the company's services including power distribution consulting, transformer installation, and switchboard erection. It outlines the workflow for electrical design projects, including load analysis, fault calculation, equipment selection, and standards compliance. Specific techniques covered include earthing, cable termination, control panel architecture, interlocking, and power factor correction. A case study of a food processing plant project is presented detailing its load requirements. The conclusion restates that the training familiarized participants with design workflows and techniques.
2. Plot
About the company
Work Flow
A Case Study
Gallery
Conclusion
3. Leela Electric Power Services Pvt. Ltd.
Consultancy of Power Distribution
Estimation & Design of Electrical Schematic
Erection, Testing and Commissioning of
Transformers up to 2000KVA and HV/MV
switchboards
4. Leela Electric Power Services Pvt. Ltd.
Erection of Control panel and its wiring
Erection of 2-pole,4-pole and 6-pole receiving
structure and allied works
End termination of HT cables up to 33KVA
6. DESIGN
Starts from load side
Based on Standards by Electrical Inspectorate
Fault Level Calculation & Earthing Scheme
Per Motor Design
Switch
Fuse
Isolation (MCB, MCCB, SFU and MPCB)
Cable
7. STANDARDS
Chief Electrical Inspectorate, Govt. Of Kerala
http://www.cei.kerala.gov.in
Norms and conditions
Eg.
Power Distribution Board
3000 W or 2 Points
Low Voltage Distribution Board
800 W or 10 Points
8. EARTHING
Body Earthing of Equipments
Earthing Scheme & Grid Formation
Earthing wire
Fault level variation according to place of fault
Copper Aluminum Galvanized Iron
17. INTERLOCK
Why interlocking ?
Methods
Automatic Mains Failure Relay (AMF)
Castell Key Mechanism
Crusher Loads
The plant never sleeps
High speed interlock required
Automatic Transfer Switch (ATS) is used
18. Automatic Transfer Switch
Monitors Voltage and Frequency
Fast switching (30 Cycles)
Synchronization
Two live lines handling simultaneously
19. Automatic Power Factor Correction
Panel
Optimize energy
consumption
Increase the power
availability
Reduced KVA
requirement
Reduce harmonic
distortion
26. CONCLUSION
HT wiring Design and Standards is familiarized
Workflow and Procedures are familiarized
Techniques like cable glanding and
termination are familiarized
AUTOCADD electrical drawings are familiarized