The project will be carried out throughout the semester where students will be assigned to measure and document
a historical / architecturally significant or heritage building and translate all the data into a set of drawings. Each
group will have to only measure one particular building assigned by the course coordinator.
1 of 1
Download to read offline
More Related Content
02 plana1
1. 6
10
11
16
22
LINE OF
CANTILEVERED ROOM
ABOVE
GRANITE SLAB (GS)
GS
REF.
SHEET 06
REF.
SHEET 07
2
1
3
4
7
5
9
8
13
12
15
14
17
18
19
20
21
23
UP
AIRWELL (CHIM CHAE)
(3.82M X 2.82M)
OBSTRUCTED
(NOT MEASURED)
ANNEX
(3.54M X 4.90M)
(FFL +0.39M)
BATHROOM 1
STORE
ROOM
(0.90M X
2.50M)
GS
GSGS
GS
SLOPE 2属
WOODEN
PLANK
LINE OF
MONO-PITCHED
ROOF ABOVE
RWP 2
LINE OF
DRAIN
UNDER
UP
DRAIN
DRAIN
DRAIN
FIVE FOOT WAY
(KAKI LIMA)
(FFL +0.21M)
B
C
D
E
HALL 1 (RUANG TAMU)
(4.80M X 4.81M)
(FFL +0.34M)
HALL 2, TIAH GELAP
(5.10M X 4.90M)
(FFL +0.44M)
KITCHEN 1
(2.79 X 4.90M)
(FFL +0.41M)
CARPETED
(FLOOR CONDITION UNKNOWN)
TERRACOTTA TILES (0.4M X 0.4M)
WITH LIME MORTAR JOINT
W1
W2
D1
D3
D6
D2
W3
D5
D4
421 3
TIMBER
PANEL
PARTITION
WASHING
AREA
TO SEPTIC TANK
REF.
SHEET
08
GREEN SQUARE
(FFL +0.20M)
E
BOARDED UP
REF.
SHEET
08
REF.
SHEET
08
REF.
SHEET
08
D
ROLLER SHUTTER
(NOT MEASURED)
.
GROUND FLOOR PLAN
.
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
.
STOVE
NICHE 2
(1.26M X 0.15M X 0.66M)
RWP 3
BASIN
LINE OF CUPBOARD
ABOVE
NICHE 1
(0.46M X 0.15MX 0.46M)
FIRST FLOOR PLAN
WC 2
T&G
(0.03M x 3.50M x 0.20M)
KITCHEN 2
(3.22M X 2.19M)
(FFL +4.69)
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
SHADOW LINE OF EARLIER
TIMBER PARTITION WALL.
NOW REMOVED.
OBSTRUCTED
(NOTMEASURED)
AIR WELL (CHIM CHAE)
(3.82M X 2.82M)
(FFL +0.44M)
WITH RETRACTABLE ROOF
(REF. SHEET 12)
21
13
14
15
16
17
18
19
20
22
23
UP
LINE OF ROOF
HATCH ABOVE
ROOM 1
(3.69M X 4.98M)
(FFL +4.80M)
ROOM 2
(7.09M X 2.00M)
ROOM 5
(2.25M X 4.09M)
(FFL +4.68M)
CORRIDOR (KORIDOR)
(16.22M X 2.90M)
(FFL +4.80M)
ROOM 3
(2.48M X 3.58M)
ROOM 4
(2.49M X 3.58M)
W4
W5
W6
D9
D11
W15
W16
W18
W19
W20
D6
D7
D8
D10D12
W7W8W21
W9
W10W11W12W13
W14
W22
2 31
A
4
TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G)
(0.03M x 3.50M x 0.20M)
TIMBER FRAME
W17
C
B
REF.
SHEET 07
REF.
SHEET 08
BRICK STEP WITH
CONCRETE TOPPING
REF.
SHEET 07
. .
REF.
SHEET
08
D
E
E
REF.
SHEET
08
REF.
SHEET
08
REF.
SHEET
08
D
REF.
SHEET 06
B
C
C
B
REF.
SHEET 07
REF.
SHEET 06
NICHE 3
(0.12M X 0.37M X 0.33M)
CONCRETE
BLOCK UNDER
TIMBER PANEL
TIMBER STUD WALL
(ASSUMED), LINED WITH
PLYWOOD
T&G
(0.03M x 3.50M x 0.20M)
T&G
(0.03M x 3.50M x 0.20M)
(FFL +4.80M)
T&G
(0.03M x 3.50M x 0.20M)
LINE OF ROOF
HATCH ABOVE
RWP 2
PROJECT TITLE
02
16
DRAWING TITLE
07.03.16
DRAWN BY
SCALE
SHEET NO.
DATE
CHECKED BY
1827/FP/02
JW;EL;AK
DRAWING NO.
JW;EL;AK
28.01.16
MEASURED BY
STARTING DATE
GROUND FLOOR PLAN
FIRST FLOOR PLAN 1:50
NJ
MEASURED DRAWINGS
NO. 44, KING STREET,
10200 GEORGE TOWN,
PENANG, MALAYSIA.
NORTH POINT
N
PARKING
SIGNAGE,
BOTTOM FIXED
TO THE ROAD
GRANITE STEPS
LOCKED
CORRUGATED ZINC SHEET ROOFING
(CZS)
T&G
(0.03M x 3.50M x 0.20M)
(FFL +4.80M)
T&G
(0.03M x 3.50M x 0.20M)
CORRUGATED ZINC SHEET
MONO-PITCHED ROOF
-
.
LINE OF WALL BELOW
DRAIN
UP
0.87 0.90
DRAIN
DRAIN
DRAIN
42, KING STREET
KING STREET
( 0.00M)
SIDE ALLEY (LORONG)
(FFL +0.01)
TIMBER PANEL
PARTITION
CORRIDOR (KORIDOR)
(7.47M X 2.02M)
DECORATIVE
OPENING
(0.66M DIA.)
CEMENT-SAND SCREED
WITH CONCRETE TOPPING
TIMBER PANEL
PARTITION
WC 1
TIMBER PANEL
PARTITION
BRICK WATER TANK
LINED WITH CEMENT
PLASTER, GLAZED
CLAY TILES FIXED
AT BASE
BRICK PARAPET WALL
LINED WITH CEMENT
PLASTER
(0.90M HIGH)
6.67 20.12
RWP 1
RWP 1
7.715.06 5.10 2.25
B
OIL PAINT YELLOW
COLOURED FIRE
HYDRANT
FITTINGS OF
ORIGINAL DOOR
6.67
B
DC
DC
NOTE: ALL DIMENSIONS ARE IN METERS (M)
+
.
BLOCKED BY
CORRUGATED
METAL SHEET
LOCKED
3.71
TO SEPTIC TANK
1.13
TIMBER PANEL
PARTITION
DFB
DAMAGED FLOOR
BOARD (DFB)
DFB
DFB
DFB
DFB
GRANITEEDGEBLOCK
TERRACOTTA TILES WITH LIME MORTAR JOINT
(0.40M X 0.40M)
SLOPE 2属
DC
RWP 3
DRAIN
0.27
0.37
0.27
LINE OF ROLLER
CASING ABOVE
A
5.16
DFB
5.16
DFB
DC
DC
DFB
0.37
LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
LINE OF ASBESTOS ROOF
ABOVE (REF. SHEET 03)
LINE OF METAL
ROOF ABOVE
.
CEMENT-SAND SCREED
WITH CONCRETE
TOPPING
TIMBER U-SHAPED
STAIRCASE
(REF. SHEET 11)
GS DRAIN
COVER
DAMAGED
CZS (DC)
FFL +1.61M
TIMBER U-SHAPED
STAIRCASE
(REF. SHEET 11)