The project will be carried out throughout the semester where students will be assigned to measure and document
a historical / architecturally significant or heritage building and translate all the data into a set of drawings. Each
group will have to only measure one particular building assigned by the course coordinator.
1 of 1
Download to read offline
More Related Content
07 seca1
1. RIDGE BEAM
(0.15M X 0.15M)
EMBEDDED INTO PARTY
WALLS
16
PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO.
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
07
PROJECT TITLE DRAWING TITLE DRAWING NO. SHEET NO.
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
SECTION CMEASURED DRAWINGS
1:50
KY;YH;TY
KY;YH;TY
NJ
1827/S/07
28.01.16
07.03.16
RWP 2
CORRUGATED ZINC SHEET
(2.50M X 0.90M)
TIMBER PURLINS
(0.2M x 0.2M) AT
0.30M C/C
EMBEDDED INTO
PARTY WALLS
TIMBER FLOOR
JOIST 1 (TFJ1)
(0.14M X 0.14M)
CONCRETE PURLINS
(0.18M X 0.18M) OF
0.41M C/C
EMBEDDED INTO
PARTY WALLS
MERANTI TIMBER
STRIP CEILING
(0.03M THK)
1 2 3 4
SECTION C
0.00M
+
+
4.80M
0.34M
-
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
KING STREET LEVEL+
11.93M
5.17 3.86 1.72
TOP OF PARTY WALL
RIDGE LEVEL+
12.21M+
FINISHED CEILING LEVEL+ 8.84M
+ 3.13M ASBESTOS BOARD CEILING LEVEL
KING STREET
( 0.00M)+-
GREEN SQUARE
(FFL +0.20M)
8NOS. WHITE
COLOURED
GLAZED TILES
(0.15M X 0.15M)
KEY PLAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
UP
OBSTRUCTED
(NOTMEASURED)
RWP
DRAIN
WC1
UP
N
S/S HALF ROUND GUTTER
(0.20DIA.) FIXED WITH S/S
BRACKET (HRG)
NORTH POINT
C
C
3.23 3.44 5.40
DEBONDED LIME
PLASTER, BRICKS
EXPOSED
D2D4
D9 D7D10
T&G
(0.03M x 3.5M x 0.2M) (FFL +4.80M)
ROOM 1CORRIDOR, (KORIDOR)
TONGUE AND GROOVE TIMBER FLOOR BOARDS (T&G)
(0.03M x 3.5M x 0.2M) (FFL +4.80M)
KITCHEN 2
HALL 1 (RUANG TAMU)
KITCHEN 1
CEMENT-SAND SCREED WITH
CONCRETE TOPPING
(FFL +0.41M)
RETRACTABLE
ROOF
(REF. SHEET 12)
ELECTRICAL WIRE
ELECTRICAL SWITCH
ROOF VOID
ROOF VOID
TIMBER FLOOR JOISTS
(0.09M X 0.14M) AT 0.42M C/C
TFJ 2 (0.12M X 0.20M) TFJ 3
(0.13M X 0.13M)
NO.44, KING STREET,
10200 GEORGE TOWN,
PENANG, MALAYSIA.
LIME PLASTER
CORNICE
VOID (INACCESSIBLE)
D3
WOODEN RAFTER
(0.15M X 0.10M) AT
0.45M C/C
S/S HALF ROUND GUTTER
(0.20M DIA.) FIXED WITH S/S
BRACKET (HRG)
AIRWELL (CHIM CHAE) BLOCKED BY
CORRUGATED
ZINC SHEET
TERRACOTTA TILES WITH LIME MORTAR JOINT
(0.40M X 0.40M) (FFL +0.44M)
TIMBER BATTENS
(0.05M X 0.05M) AT 0.55M C/C
NOTE: ALL DIMENSIONS ARE IN METERS (M)
S/S K-STYLE
PARAPET
GUTTER
(0.15M X 0.13M)
LIME PLASTER CORNICE
CEMENT-SAND SCREED WITH
CONCRETE TOPPING (FFL +4.69M)
0.13
0.13
WROUGHT IRON
I-BEAM
(0.14M X 0.09M)
VOID (INACCESSIBLE)
W2
0.10
RIDGE BEAM
(0.20M X 0.20M)
EMBEDDED INTO PARTY
WALLS
HALL 2, TIAH GELAP
ANGLED TERRACOTTA
RIDGE TILES SEALED WITH
CEMENT GROUTING
DECORATIVE
OPENING
(0.66M DIA.)
TIMBER PURLINS
(0.30M x 0.30M) AT
0.30M C/C
EMBEDDED INTO
PARTY WALLS
ANNEX
BRICK PARAPET WALL
LINED WITH CEMENT
PLASTER (0.90M HIGH)
S/S HRG
(0.20DIA.)
BRICK COLUMN LINED
WITH LIME PLASTER
(0.48M X 0.48M)
TIMBER BATTENS
(0.16M X 0.08M) AT
0.60M C/C
TIMBER RAFTERS
(0.15M X 0.05M)
AT 0.45M C/C
TIMBER LATTICE SCREEN
FOR VENTILATION
S/S HRG (0.20DIA.)
S/S HRG
(0.20DIA.)
TIMBER BATTENS
(0.10M X 0.10M) AT
0.50M C/C
TIMBER CEILING JOISTS
EMBEDDED INTO PARTY
WALLS (0.23M X 0.23M) AT
0.75M C/C
CORRUGATED ZINC SHEET
(2.50M X 0.90M)
≒
SUSPENDED FALSE CEILING, ASBESTOS
BOARD WITH TIMBER BEADING
(0.03M X 1.21M X 1.21M)
CARPETED
(FLOOR CONDITION UNKNOWN) (FFL +0.34M)
3.87
TIMBER
U-SHAPED
STAIRCASE.
(REF SHEET 11)
FIVE FOOT WAY
(KAKI LIMA)
CEMENT-SAND SCREED
WITH CONCRETE
TOPPING (FFL +0.21M)