際際滷

際際滷Share a Scribd company logo
2015 
ENGINEERED SOLUTIONS 
Providing You 
with Complete 
Site Solutions 
for over a 
century. 
December2014 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
28 29 30 31 
Christmas Day 
New Year's Eve 
nov 2014 
1 
2 3 4 5 6 7 8 
9 10 11 12 13 14 15 
16 17 18 19 20 21 22 
23/30 24 25 26 27 28 29 
jan 2015 
1 2 3 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
18 19 20 21 22 23 24 
25 26 27 28 29 30 31 
Winter Solstice
Pipe 損 MOBILE PIPE速 Mill Storm Sewer 
Autopista Oaxaca - Puerto Escondido 
損損Oaxaca, Mexico 
To help with Mexicos Transport and Communications Infrastructure Investment Program 2013-2018, several 
損損HEL-COR速 Corrugated Metal Pipe 
remote areas in the country have begun improving their infrastructure and transportation areas to help 
accelerate economic activity and aid in the extensive construction necessary to further the development. 
損損42, 48 and 60 dia., for 25,000 LF 
In order to reach one of these remote locations, the Empresa ICA selected Contech CCP Pipe Mexico to help 
損損On-site MOBILE PIPE速 production 
implement a cost-effective, manufacturing solution utilizing Contechs MOBILE PIPE速 Mill. The MOBILE PIPE速 
損損Installation date - October 2013 
process includes end roll capability and is an excellent way to get pipe to a remote site or to reduce freight 
cost for a large diameter or detention project. 
January 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 
New Years Day 
dec 2014 
1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
28 29 30 31 
feb 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
18 19 20 21 22 23 24 
Martin Luther King, Jr. Day 
25 26 27 28 29 30 31
Bridges 損 BridgeCor速 with Keystone速 Wingwalls 
Arizona Mine Access Road 
Located in Arizona, this BridgeCor速 structure eliminated an unwanted at-grade railroad crossing and has 
improved safety on a busy county road, providing local mine access. The structures skew required a 
reinforced concrete headwall in conjunction with wingwalls constructed from Keystone速 KeyGridsystem. This 
end treatment selection helped to stabilize the structure during the backfill process and provided a significant 
cost savings over cast-in-place walls. 
損損BridgeCor速 with Keystone速 wingwalls 
損損402 span x 284 rise x 60 length, 
single radius arch 
損損Installation date - April 2014 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
Valentines Day 
15 16 17 18 19 20 21 
Presidents' Day 
22 23 24 25 26 27 28 
jan 2015 
1 2 3 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
18 19 20 21 22 23 24 
25 26 27 28 29 30 31 
mar 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30 31 
FebRuary 2015 
Chinese New Year
Stormwater Management 損 Jellyfish速 Filter & Biofiltration 
Maine Mall Road Stormwater Improvements 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30 31 
Filter 
速 
feb 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
apr 2015 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
19 20 21 22 23 24 25 
26 27 28 29 30 
Daylight Savings Begins 
St. Patrick's Day Spring Equinox 
March 2015 
Maine Mall Road was one of four major thoroughfares targeted for retrofit to improve water quality of runoff 
entering the waterways of the Long Creek Watershed. The area was extensively developed, and included runoff 
from both individual properties and the public right-of-way. Existing utilities including direct burial cables and 
high pressure gas mains along with right-of-way and land restrictions made the placements of BMPs difficult. 
Engineers selected a solution that included ten biofilters (both planted and unplanted) and three Jellyfish速 
Filters to provide effective stormwater treatment and improve water quality. 
損損South Portland, Maine 
損損Stormwater treatment 
損損(8) 6 X 6 and (2) 6 X 12 biofilters 
損損(3) Jellyfish速 Filters 
損損Installation date  Summer 2014
Hard Armor 損 ArmorFlex速 Articulating Concrete Blocks 
Beale Street Landing 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
Tax Day 
19 20 21 22 23 24 25 
Earth Day 
26 27 28 29 30 
mar 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30 31 
may 2015 
1 2 
3 4 5 6 7 8 9 
10 11 12 13 14 15 16 
17 18 19 20 21 22 23 
24 25 26 27 28 29 30 
31 
Easter Sunday 
Passover Begins 
Passover Ends 
Good Friday 
April 2015 
The city of Memphis sits on a bluff at the widest point of the Mississippi River and has a 57 foot annual 
fluctuation in water elevation. The area known as the Beale Street Landing was in need of stabilization, 
protection, and beautification. ArmorFlex articulated concrete blocks were used as part of the new public 
access area that will include modern docking facilities, commercial space and connect recreational areas with 
a dramatic overlook for riverfront activities and events. 
損損Memphis, Tennessee 
損損ArmorFlex速 40 Class BAH Mattresses, 
21,669 SF 
損損ArmorFlex速 Class 45FT Mattresses, 
4,402 SF 
損損Installation date  Fall 2012
Stormwater Management 損 HEL-COR速 Retention System 
City Center Regional Stormwater Facility 
The city of Mountlake Terrace, Washington needed a new stormwater retention facility to provide stormwater 
treatment and downstream flood control. The facility would treat runoff from an area of about 13 acres in the 
citys downtown core and protect the water quality in the Lake Ballinger watershed. 
To address these issues the engineers on the project proposed the creation of a facility below the Mountlake 
Terrace Library parking lot utilizing a CDS pre-treatment system in front of a large perforated HEL-COR速 CMP 
retention system. 
損損Mountlake Terrace, Washington 
損損800 LF of 120 Perforated ALT2 CMP 
損損CDS速 hydrodynamic separator 
損損Installation date  February 2014 
May 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
19 20 21 22 23 24 25 
26 27 28 29 30 
3 4 5 6 7 8 9 
10 11 12 13 14 15 16 
17 18 19 20 21 22 23 
apr 2015 
24 25 26 27 28 29 30 
Memorial Day 
Mothers Day 
june 2015 
1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
28 29 30 
31
Bridges 損 Precast Bridge Systems 
Bennett Parkway Extension 
As part of its Economic Development Strategic Plan, the city of Zionsville needed to extend Bennett Parkway 
in order to develop a new business park that would become home to a new 300,000-square-foot distribution 
center. A precast CON/SPAN速 O-Series速 bridge was chosen as the optimal solution because of its ability to 
provide a quick, cost-effective solution for the fast-track project. 
This O-Series速 three-sided structure met the permitting requirements of the Indiana Department of 
Environmental Management and the Indiana Department of Transportations specifications, Section 723. 
損損Zionsville, Indiana 
損損CON/SPAN速 O-Series速 
損損19 span x 68 rise x 104 length 
損損Installation date  April 2013 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
Summer Solstice 
Fathers Day 
28 29 30 
may 2015 
1 2 
3 4 5 6 7 8 9 
10 11 12 13 14 15 16 
17 18 19 20 21 22 23 
24 25 26 27 28 29 30 
31 
july 2015 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
19 20 21 22 23 24 25 
26 27 28 29 30 31 
June 2015
Stormwater Management 損 Terre Arch速 Detention System 
Festival Shoppes is a new commercial development in Boca Raton, Florida. The development was built in 
an urban environment on the site of a pre-existing above ground detention pond. The underground system 
needed to encircle the entire building footprint, be installed underneath the parking lot, and provide a high 
volume of storage with little cover while maintaining traffic load. 
Engineers selected Terre Arch, a modular, precast concrete stormwater storage system engineered 
especially for underground installation in shallow environments. The project called for 367 Terre Arch 
48 chambers and 43 distribution manifolds, providing 247,517 cubic feet of storage. 
Festival Shoppes 
損損Boca Raton, Florida 
損損Stormwater Detention/Infiltration 
損損367 Terre Arch 48 chambers 
損損43 Distribution manifolds 
損損Installation date  Summer 2014 
July 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
19 20 21 22 23 24 25 
26 27 28 29 30 31 
Independence Day 
aug 2015 
1 
2 3 4 5 6 7 8 
9 10 11 12 13 14 15 
16 17 18 19 20 21 22 
23 24 25 26 27 28 29 
30 31 
june 2015 
1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
28 29 30
Bridges 損 Continental速 Pedestrian Truss 
Flight 93 National Memorial 
On September 11, 2001, the United States came under attack when four commercial airliners were hijacked 
and used to strike targets on the ground. Nearly 3,000 people tragically lost their lives. Due to the actions of 
the 40 passengers and crew aboard United Flight 93, headed for the U.S. Capital, one attack was thwarted. 
To honor the courageous passengers and crew, the Flight 93 National Memorial was created at the crash site. 
To reach the Memorial, a 800 x 10 multi-span, Connector速 style, Continental速 truss bridge, with a horizontally 
curved alignment, was installed in just three days. The weathering steel pedestrian bridge allows visitors dry 
passage over the wetlands area. 
損損Shanksville, Pennsylvania 
損損Continental速 Pedestrian Truss 
損損10 width x 800 span Connector速 style 
損損Installation date  June 2014 
August 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 
1 2 3 4 
5 6 7 8 9 10 11 
12 13 14 15 16 17 18 
19 20 21 22 23 24 25 
26 27 28 29 30 31 
sep 2015 
1 2 3 4 5 
6 7 8 9 10 11 12 
13 14 15 16 17 18 19 
20 21 22 23 24 25 26 
27 28 29 30 
2 3 4 5 6 7 8 
9 10 11 12 13 14 15 
16 17 18 19 20 21 22 
july 2015 
23 24 25 26 27 28 29 
30 31
Stormwater Management 損 UrbanGreen速 Rainwater Harvesting 
Dallas Arboretum - Rory Meyers Childrens Adventure Garden 
The Dallas Arboretums Rory Meyers Childrens Adventure Garden is a fun nature and science gateway for 
children of all ages. The Gardens unique blend of innovative technology, found in the 150 interactive exhibits 
spread over 8 acres, entertains and educates visitors on concepts such as the solar system, energy, and more. 
The garden also incorporates many sustainable features including an UrbanGreen速 rainwater harvesting system 
from Contech Engineered Solutions that provides water for irrigation. Contech worked with the consulting 
engineer to design a system consisting of a CDS速 hydrodynamic separator, two DuroMaxx速 SRPE cisterns, and 
mechanical pumps and controls. 
損損Dallas, Texas 
損損CDS速 hydrodynamic separator 
損損(2) DuroMaxx速 SRPE Cisterns 
providing 50,000 gallons of storage 
損損Installation date  Summer 2012 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 
6 7 8 9 10 11 12 
Labor Day 
13 14 15 16 17 18 19 
Rosh Hashanah 
20 21 22 23 24 25 26 
27 28 29 30 
aug 2015 
1 
2 3 4 5 6 7 8 
9 10 11 12 13 14 15 
16 17 18 19 20 21 22 
23 24 25 26 27 28 29 
30 31 
oct 2015 
1 2 3 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
18 19 20 21 22 23 24 
25 26 27 28 29 30 31 
STEEL REINFORCED PE TECHNOLOGY 
Stormwater Solutions from Contech速 
September 2015
Retaining Walls 損 Keystone速 Retaining Wall Systems 
In order for motorists to travel south on US 85, they had to first cross the BNSF railroad tracks (which was 
closed more than 3 hours a day), deal with the normal flow of traffic while also avoiding additional commuters 
from a major employer in the area. The result was the perfect recipe for congestion. Plans to separate the 
railroad crossing from US 85 were 30 years in the making and include realignment where US 85 enters 
Torrington. A main component to the realignment was a 24,000 square foot Keystone Compac II retaining 
wall. Since every construction step necessary to completing the realignment relied upon, in some way, the 
construction of the wall system, timing was critical. 
U.S. 85 Realignment 
損損Torrington, Wyoming 
損損Keystone速 Compac II 
損損24,000 LF 
損損Installation date  April 2013 
October 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
Columbus Day 
18 19 20 21 22 23 24 
25 26 27 28 29 30 31 
Halloween 
sep 2015 
1 2 3 4 5 
6 7 8 9 10 11 12 
13 14 15 16 17 18 19 
20 21 22 23 24 25 26 
27 28 29 30 
nov 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30
Pipe 損 DuroMaxx速 Steel Reinforced Polyethylene 
Mobile Regional Airport - Runway 14/32 
In February 2013, the Mobile Airport Authority filed an application with the Federal Aviation Administration 
to garner a small stipend intended for continued development and rehabilitation for the airport. Part of that 
involved the rehabilitation of a single 1,740 long, 132 diameter culvert that ran under Runway 14/32. 
Given the location, replacement was completely out of the question. The Airport did not want to have to shut 
down operations while construction was underway. Ultimately, they turned to a 120 diameter DuroMaxx速 steel 
reinforced polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to slipline into the existing 
culvert. 
損損Mobile, Alabama 
損損1500 LF of 120 DuroMaxx速 SRPE 
損損Installation date  March 2014 
NOvember 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30 
Veterans Day 
Thanksgiving Day 
oct 2015 
1 2 3 
4 5 6 7 8 9 10 
11 12 13 14 15 16 17 
18 19 20 21 22 23 24 
25 26 27 28 29 30 31 
dec 2015 
1 2 3 4 5 
6 7 8 9 10 11 12 
13 14 15 16 17 18 19 
20 21 22 23 24 25 26 
27 28 29 30 31 
STEEL REINFORCED PE TECHNOLOGY 
Daylight Savings Ends Election Day 
Photo courtesy of Chris Wisehart  Indiana Reline, Inc.
Bridges 損 U.S. Bridge速 Vehicular Truss 
Main Street over Murrieta Creek 
The city of Temecula needed to replace an obsolete bridge with a new structure that would serve as a 
centerpiece for the community and also improve pedestrian safety. A weathering steel, Cambridge style, U.S. 
Bridge truss was chosen as the replacement. The new bridge includes 9 8 wide sidewalks on both sides, 
with pedestrian viewpoints overlooking the creek. The new structure is compatible with the Murrieta Creek 
Restoration and Flood Control improvements proposed by U.S. Army Corps of Engineers and the Riverside 
County Flood Control and Water Conservation District. 
損損Old Town Temecula, California 
損損U.S. Bridge速 Cambridge truss 
損損28 width x 152 span, two-lane bridge 
損損Installation date  May 2014 
December 2015 
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 
1 2 3 4 5 
6 7 8 9 10 11 12 
Hanukkah Begins 
13 14 15 16 17 18 19 
Hanukkah Ends 
20 21 22 23 24 25 26 
Christmas Eve Christmas Day 
27 28 29 30 31 
New Year's Eve 
nov 2015 
1 2 3 4 5 6 7 
8 9 10 11 12 13 14 
15 16 17 18 19 20 21 
22 23 24 25 26 27 28 
29 30 
jan 2016 
1 2 
3 4 5 6 7 8 9 
10 11 12 13 14 15 16 
17 18 19 20 21 22 23 
24 25 26 27 28 29 30 
31 
ENGINEERED SOLUTIONS 
800-338-1122 | www.ContechES.com/calendar ENGINEERED SOLUTIONS 
MARKETS SERVED 
 Agriculture / Irrigation 
 Airports / Ports / Railway 
 Commercial / Industrial / Residential 
 DOT / Roads 
 Energy / Mining / Natural Resources 
 Government / Institutional 
 Military 
 Recreation / Parks / Golf Courses 
 Rehabilitation / Relining 
Solutions Provided 
 Bridges & Structures 
 Erosion Control 
 Pipe 
 Retaining Walls 
 Stormwater Management 
 Wastewater Treatment 
息 2014 Contech Engineered Solutions LLC 
ENGINEERED SOLUTIONS 
Winter Solstice

More Related Content

2015 Contech Calendar

  • 1. 2015 ENGINEERED SOLUTIONS Providing You with Complete Site Solutions for over a century. December2014 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Christmas Day New Year's Eve nov 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 jan 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Winter Solstice
  • 2. Pipe 損 MOBILE PIPE速 Mill Storm Sewer Autopista Oaxaca - Puerto Escondido 損損Oaxaca, Mexico To help with Mexicos Transport and Communications Infrastructure Investment Program 2013-2018, several 損損HEL-COR速 Corrugated Metal Pipe remote areas in the country have begun improving their infrastructure and transportation areas to help accelerate economic activity and aid in the extensive construction necessary to further the development. 損損42, 48 and 60 dia., for 25,000 LF In order to reach one of these remote locations, the Empresa ICA selected Contech CCP Pipe Mexico to help 損損On-site MOBILE PIPE速 production implement a cost-effective, manufacturing solution utilizing Contechs MOBILE PIPE速 Mill. The MOBILE PIPE速 損損Installation date - October 2013 process includes end roll capability and is an excellent way to get pipe to a remote site or to reduce freight cost for a large diameter or detention project. January 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 New Years Day dec 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 feb 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Martin Luther King, Jr. Day 25 26 27 28 29 30 31
  • 3. Bridges 損 BridgeCor速 with Keystone速 Wingwalls Arizona Mine Access Road Located in Arizona, this BridgeCor速 structure eliminated an unwanted at-grade railroad crossing and has improved safety on a busy county road, providing local mine access. The structures skew required a reinforced concrete headwall in conjunction with wingwalls constructed from Keystone速 KeyGridsystem. This end treatment selection helped to stabilize the structure during the backfill process and provided a significant cost savings over cast-in-place walls. 損損BridgeCor速 with Keystone速 wingwalls 損損402 span x 284 rise x 60 length, single radius arch 損損Installation date - April 2014 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Valentines Day 15 16 17 18 19 20 21 Presidents' Day 22 23 24 25 26 27 28 jan 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 mar 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FebRuary 2015 Chinese New Year
  • 4. Stormwater Management 損 Jellyfish速 Filter & Biofiltration Maine Mall Road Stormwater Improvements Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Filter 速 feb 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 apr 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Daylight Savings Begins St. Patrick's Day Spring Equinox March 2015 Maine Mall Road was one of four major thoroughfares targeted for retrofit to improve water quality of runoff entering the waterways of the Long Creek Watershed. The area was extensively developed, and included runoff from both individual properties and the public right-of-way. Existing utilities including direct burial cables and high pressure gas mains along with right-of-way and land restrictions made the placements of BMPs difficult. Engineers selected a solution that included ten biofilters (both planted and unplanted) and three Jellyfish速 Filters to provide effective stormwater treatment and improve water quality. 損損South Portland, Maine 損損Stormwater treatment 損損(8) 6 X 6 and (2) 6 X 12 biofilters 損損(3) Jellyfish速 Filters 損損Installation date Summer 2014
  • 5. Hard Armor 損 ArmorFlex速 Articulating Concrete Blocks Beale Street Landing Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Tax Day 19 20 21 22 23 24 25 Earth Day 26 27 28 29 30 mar 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 may 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Easter Sunday Passover Begins Passover Ends Good Friday April 2015 The city of Memphis sits on a bluff at the widest point of the Mississippi River and has a 57 foot annual fluctuation in water elevation. The area known as the Beale Street Landing was in need of stabilization, protection, and beautification. ArmorFlex articulated concrete blocks were used as part of the new public access area that will include modern docking facilities, commercial space and connect recreational areas with a dramatic overlook for riverfront activities and events. 損損Memphis, Tennessee 損損ArmorFlex速 40 Class BAH Mattresses, 21,669 SF 損損ArmorFlex速 Class 45FT Mattresses, 4,402 SF 損損Installation date Fall 2012
  • 6. Stormwater Management 損 HEL-COR速 Retention System City Center Regional Stormwater Facility The city of Mountlake Terrace, Washington needed a new stormwater retention facility to provide stormwater treatment and downstream flood control. The facility would treat runoff from an area of about 13 acres in the citys downtown core and protect the water quality in the Lake Ballinger watershed. To address these issues the engineers on the project proposed the creation of a facility below the Mountlake Terrace Library parking lot utilizing a CDS pre-treatment system in front of a large perforated HEL-COR速 CMP retention system. 損損Mountlake Terrace, Washington 損損800 LF of 120 Perforated ALT2 CMP 損損CDS速 hydrodynamic separator 損損Installation date February 2014 May 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 apr 2015 24 25 26 27 28 29 30 Memorial Day Mothers Day june 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 7. Bridges 損 Precast Bridge Systems Bennett Parkway Extension As part of its Economic Development Strategic Plan, the city of Zionsville needed to extend Bennett Parkway in order to develop a new business park that would become home to a new 300,000-square-foot distribution center. A precast CON/SPAN速 O-Series速 bridge was chosen as the optimal solution because of its ability to provide a quick, cost-effective solution for the fast-track project. This O-Series速 three-sided structure met the permitting requirements of the Indiana Department of Environmental Management and the Indiana Department of Transportations specifications, Section 723. 損損Zionsville, Indiana 損損CON/SPAN速 O-Series速 損損19 span x 68 rise x 104 length 損損Installation date April 2013 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Summer Solstice Fathers Day 28 29 30 may 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 july 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 June 2015
  • 8. Stormwater Management 損 Terre Arch速 Detention System Festival Shoppes is a new commercial development in Boca Raton, Florida. The development was built in an urban environment on the site of a pre-existing above ground detention pond. The underground system needed to encircle the entire building footprint, be installed underneath the parking lot, and provide a high volume of storage with little cover while maintaining traffic load. Engineers selected Terre Arch, a modular, precast concrete stormwater storage system engineered especially for underground installation in shallow environments. The project called for 367 Terre Arch 48 chambers and 43 distribution manifolds, providing 247,517 cubic feet of storage. Festival Shoppes 損損Boca Raton, Florida 損損Stormwater Detention/Infiltration 損損367 Terre Arch 48 chambers 損損43 Distribution manifolds 損損Installation date Summer 2014 July 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Independence Day aug 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 june 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 9. Bridges 損 Continental速 Pedestrian Truss Flight 93 National Memorial On September 11, 2001, the United States came under attack when four commercial airliners were hijacked and used to strike targets on the ground. Nearly 3,000 people tragically lost their lives. Due to the actions of the 40 passengers and crew aboard United Flight 93, headed for the U.S. Capital, one attack was thwarted. To honor the courageous passengers and crew, the Flight 93 National Memorial was created at the crash site. To reach the Memorial, a 800 x 10 multi-span, Connector速 style, Continental速 truss bridge, with a horizontally curved alignment, was installed in just three days. The weathering steel pedestrian bridge allows visitors dry passage over the wetlands area. 損損Shanksville, Pennsylvania 損損Continental速 Pedestrian Truss 損損10 width x 800 span Connector速 style 損損Installation date June 2014 August 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 sep 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 july 2015 23 24 25 26 27 28 29 30 31
  • 10. Stormwater Management 損 UrbanGreen速 Rainwater Harvesting Dallas Arboretum - Rory Meyers Childrens Adventure Garden The Dallas Arboretums Rory Meyers Childrens Adventure Garden is a fun nature and science gateway for children of all ages. The Gardens unique blend of innovative technology, found in the 150 interactive exhibits spread over 8 acres, entertains and educates visitors on concepts such as the solar system, energy, and more. The garden also incorporates many sustainable features including an UrbanGreen速 rainwater harvesting system from Contech Engineered Solutions that provides water for irrigation. Contech worked with the consulting engineer to design a system consisting of a CDS速 hydrodynamic separator, two DuroMaxx速 SRPE cisterns, and mechanical pumps and controls. 損損Dallas, Texas 損損CDS速 hydrodynamic separator 損損(2) DuroMaxx速 SRPE Cisterns providing 50,000 gallons of storage 損損Installation date Summer 2012 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 Labor Day 13 14 15 16 17 18 19 Rosh Hashanah 20 21 22 23 24 25 26 27 28 29 30 aug 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 oct 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 STEEL REINFORCED PE TECHNOLOGY Stormwater Solutions from Contech速 September 2015
  • 11. Retaining Walls 損 Keystone速 Retaining Wall Systems In order for motorists to travel south on US 85, they had to first cross the BNSF railroad tracks (which was closed more than 3 hours a day), deal with the normal flow of traffic while also avoiding additional commuters from a major employer in the area. The result was the perfect recipe for congestion. Plans to separate the railroad crossing from US 85 were 30 years in the making and include realignment where US 85 enters Torrington. A main component to the realignment was a 24,000 square foot Keystone Compac II retaining wall. Since every construction step necessary to completing the realignment relied upon, in some way, the construction of the wall system, timing was critical. U.S. 85 Realignment 損損Torrington, Wyoming 損損Keystone速 Compac II 損損24,000 LF 損損Installation date April 2013 October 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Columbus Day 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Halloween sep 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 nov 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 12. Pipe 損 DuroMaxx速 Steel Reinforced Polyethylene Mobile Regional Airport - Runway 14/32 In February 2013, the Mobile Airport Authority filed an application with the Federal Aviation Administration to garner a small stipend intended for continued development and rehabilitation for the airport. Part of that involved the rehabilitation of a single 1,740 long, 132 diameter culvert that ran under Runway 14/32. Given the location, replacement was completely out of the question. The Airport did not want to have to shut down operations while construction was underway. Ultimately, they turned to a 120 diameter DuroMaxx速 steel reinforced polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to slipline into the existing culvert. 損損Mobile, Alabama 損損1500 LF of 120 DuroMaxx速 SRPE 損損Installation date March 2014 NOvember 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Veterans Day Thanksgiving Day oct 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 dec 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 STEEL REINFORCED PE TECHNOLOGY Daylight Savings Ends Election Day Photo courtesy of Chris Wisehart Indiana Reline, Inc.
  • 13. Bridges 損 U.S. Bridge速 Vehicular Truss Main Street over Murrieta Creek The city of Temecula needed to replace an obsolete bridge with a new structure that would serve as a centerpiece for the community and also improve pedestrian safety. A weathering steel, Cambridge style, U.S. Bridge truss was chosen as the replacement. The new bridge includes 9 8 wide sidewalks on both sides, with pedestrian viewpoints overlooking the creek. The new structure is compatible with the Murrieta Creek Restoration and Flood Control improvements proposed by U.S. Army Corps of Engineers and the Riverside County Flood Control and Water Conservation District. 損損Old Town Temecula, California 損損U.S. Bridge速 Cambridge truss 損損28 width x 152 span, two-lane bridge 損損Installation date May 2014 December 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 Hanukkah Begins 13 14 15 16 17 18 19 Hanukkah Ends 20 21 22 23 24 25 26 Christmas Eve Christmas Day 27 28 29 30 31 New Year's Eve nov 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 jan 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ENGINEERED SOLUTIONS 800-338-1122 | www.ContechES.com/calendar ENGINEERED SOLUTIONS MARKETS SERVED Agriculture / Irrigation Airports / Ports / Railway Commercial / Industrial / Residential DOT / Roads Energy / Mining / Natural Resources Government / Institutional Military Recreation / Parks / Golf Courses Rehabilitation / Relining Solutions Provided Bridges & Structures Erosion Control Pipe Retaining Walls Stormwater Management Wastewater Treatment 息 2014 Contech Engineered Solutions LLC ENGINEERED SOLUTIONS Winter Solstice