2. Pipe 損 MOBILE PIPE速 Mill Storm Sewer
Autopista Oaxaca - Puerto Escondido
損損Oaxaca, Mexico
To help with Mexicos Transport and Communications Infrastructure Investment Program 2013-2018, several
損損HEL-COR速 Corrugated Metal Pipe
remote areas in the country have begun improving their infrastructure and transportation areas to help
accelerate economic activity and aid in the extensive construction necessary to further the development.
損損42, 48 and 60 dia., for 25,000 LF
In order to reach one of these remote locations, the Empresa ICA selected Contech CCP Pipe Mexico to help
損損On-site MOBILE PIPE速 production
implement a cost-effective, manufacturing solution utilizing Contechs MOBILE PIPE速 Mill. The MOBILE PIPE速
損損Installation date - October 2013
process includes end roll capability and is an excellent way to get pipe to a remote site or to reduce freight
cost for a large diameter or detention project.
January 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3
New Years Day
dec 2014
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
feb 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
Martin Luther King, Jr. Day
25 26 27 28 29 30 31
3. Bridges 損 BridgeCor速 with Keystone速 Wingwalls
Arizona Mine Access Road
Located in Arizona, this BridgeCor速 structure eliminated an unwanted at-grade railroad crossing and has
improved safety on a busy county road, providing local mine access. The structures skew required a
reinforced concrete headwall in conjunction with wingwalls constructed from Keystone速 KeyGridsystem. This
end treatment selection helped to stabilize the structure during the backfill process and provided a significant
cost savings over cast-in-place walls.
損損BridgeCor速 with Keystone速 wingwalls
損損402 span x 284 rise x 60 length,
single radius arch
損損Installation date - April 2014
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
Valentines Day
15 16 17 18 19 20 21
Presidents' Day
22 23 24 25 26 27 28
jan 2015
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
mar 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
FebRuary 2015
Chinese New Year
4. Stormwater Management 損 Jellyfish速 Filter & Biofiltration
Maine Mall Road Stormwater Improvements
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
Filter
速
feb 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
apr 2015
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
Daylight Savings Begins
St. Patrick's Day Spring Equinox
March 2015
Maine Mall Road was one of four major thoroughfares targeted for retrofit to improve water quality of runoff
entering the waterways of the Long Creek Watershed. The area was extensively developed, and included runoff
from both individual properties and the public right-of-way. Existing utilities including direct burial cables and
high pressure gas mains along with right-of-way and land restrictions made the placements of BMPs difficult.
Engineers selected a solution that included ten biofilters (both planted and unplanted) and three Jellyfish速
Filters to provide effective stormwater treatment and improve water quality.
損損South Portland, Maine
損損Stormwater treatment
損損(8) 6 X 6 and (2) 6 X 12 biofilters
損損(3) Jellyfish速 Filters
損損Installation date Summer 2014
5. Hard Armor 損 ArmorFlex速 Articulating Concrete Blocks
Beale Street Landing
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
Tax Day
19 20 21 22 23 24 25
Earth Day
26 27 28 29 30
mar 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
may 2015
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
Easter Sunday
Passover Begins
Passover Ends
Good Friday
April 2015
The city of Memphis sits on a bluff at the widest point of the Mississippi River and has a 57 foot annual
fluctuation in water elevation. The area known as the Beale Street Landing was in need of stabilization,
protection, and beautification. ArmorFlex articulated concrete blocks were used as part of the new public
access area that will include modern docking facilities, commercial space and connect recreational areas with
a dramatic overlook for riverfront activities and events.
損損Memphis, Tennessee
損損ArmorFlex速 40 Class BAH Mattresses,
21,669 SF
損損ArmorFlex速 Class 45FT Mattresses,
4,402 SF
損損Installation date Fall 2012
6. Stormwater Management 損 HEL-COR速 Retention System
City Center Regional Stormwater Facility
The city of Mountlake Terrace, Washington needed a new stormwater retention facility to provide stormwater
treatment and downstream flood control. The facility would treat runoff from an area of about 13 acres in the
citys downtown core and protect the water quality in the Lake Ballinger watershed.
To address these issues the engineers on the project proposed the creation of a facility below the Mountlake
Terrace Library parking lot utilizing a CDS pre-treatment system in front of a large perforated HEL-COR速 CMP
retention system.
損損Mountlake Terrace, Washington
損損800 LF of 120 Perforated ALT2 CMP
損損CDS速 hydrodynamic separator
損損Installation date February 2014
May 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
apr 2015
24 25 26 27 28 29 30
Memorial Day
Mothers Day
june 2015
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
31
7. Bridges 損 Precast Bridge Systems
Bennett Parkway Extension
As part of its Economic Development Strategic Plan, the city of Zionsville needed to extend Bennett Parkway
in order to develop a new business park that would become home to a new 300,000-square-foot distribution
center. A precast CON/SPAN速 O-Series速 bridge was chosen as the optimal solution because of its ability to
provide a quick, cost-effective solution for the fast-track project.
This O-Series速 three-sided structure met the permitting requirements of the Indiana Department of
Environmental Management and the Indiana Department of Transportations specifications, Section 723.
損損Zionsville, Indiana
損損CON/SPAN速 O-Series速
損損19 span x 68 rise x 104 length
損損Installation date April 2013
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
Summer Solstice
Fathers Day
28 29 30
may 2015
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
july 2015
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
June 2015
8. Stormwater Management 損 Terre Arch速 Detention System
Festival Shoppes is a new commercial development in Boca Raton, Florida. The development was built in
an urban environment on the site of a pre-existing above ground detention pond. The underground system
needed to encircle the entire building footprint, be installed underneath the parking lot, and provide a high
volume of storage with little cover while maintaining traffic load.
Engineers selected Terre Arch, a modular, precast concrete stormwater storage system engineered
especially for underground installation in shallow environments. The project called for 367 Terre Arch
48 chambers and 43 distribution manifolds, providing 247,517 cubic feet of storage.
Festival Shoppes
損損Boca Raton, Florida
損損Stormwater Detention/Infiltration
損損367 Terre Arch 48 chambers
損損43 Distribution manifolds
損損Installation date Summer 2014
July 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Independence Day
aug 2015
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
june 2015
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
9. Bridges 損 Continental速 Pedestrian Truss
Flight 93 National Memorial
On September 11, 2001, the United States came under attack when four commercial airliners were hijacked
and used to strike targets on the ground. Nearly 3,000 people tragically lost their lives. Due to the actions of
the 40 passengers and crew aboard United Flight 93, headed for the U.S. Capital, one attack was thwarted.
To honor the courageous passengers and crew, the Flight 93 National Memorial was created at the crash site.
To reach the Memorial, a 800 x 10 multi-span, Connector速 style, Continental速 truss bridge, with a horizontally
curved alignment, was installed in just three days. The weathering steel pedestrian bridge allows visitors dry
passage over the wetlands area.
損損Shanksville, Pennsylvania
損損Continental速 Pedestrian Truss
損損10 width x 800 span Connector速 style
損損Installation date June 2014
August 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
sep 2015
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
july 2015
23 24 25 26 27 28 29
30 31
10. Stormwater Management 損 UrbanGreen速 Rainwater Harvesting
Dallas Arboretum - Rory Meyers Childrens Adventure Garden
The Dallas Arboretums Rory Meyers Childrens Adventure Garden is a fun nature and science gateway for
children of all ages. The Gardens unique blend of innovative technology, found in the 150 interactive exhibits
spread over 8 acres, entertains and educates visitors on concepts such as the solar system, energy, and more.
The garden also incorporates many sustainable features including an UrbanGreen速 rainwater harvesting system
from Contech Engineered Solutions that provides water for irrigation. Contech worked with the consulting
engineer to design a system consisting of a CDS速 hydrodynamic separator, two DuroMaxx速 SRPE cisterns, and
mechanical pumps and controls.
損損Dallas, Texas
損損CDS速 hydrodynamic separator
損損(2) DuroMaxx速 SRPE Cisterns
providing 50,000 gallons of storage
損損Installation date Summer 2012
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5
6 7 8 9 10 11 12
Labor Day
13 14 15 16 17 18 19
Rosh Hashanah
20 21 22 23 24 25 26
27 28 29 30
aug 2015
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
oct 2015
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
STEEL REINFORCED PE TECHNOLOGY
Stormwater Solutions from Contech速
September 2015
11. Retaining Walls 損 Keystone速 Retaining Wall Systems
In order for motorists to travel south on US 85, they had to first cross the BNSF railroad tracks (which was
closed more than 3 hours a day), deal with the normal flow of traffic while also avoiding additional commuters
from a major employer in the area. The result was the perfect recipe for congestion. Plans to separate the
railroad crossing from US 85 were 30 years in the making and include realignment where US 85 enters
Torrington. A main component to the realignment was a 24,000 square foot Keystone Compac II retaining
wall. Since every construction step necessary to completing the realignment relied upon, in some way, the
construction of the wall system, timing was critical.
U.S. 85 Realignment
損損Torrington, Wyoming
損損Keystone速 Compac II
損損24,000 LF
損損Installation date April 2013
October 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
Columbus Day
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Halloween
sep 2015
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
nov 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
12. Pipe 損 DuroMaxx速 Steel Reinforced Polyethylene
Mobile Regional Airport - Runway 14/32
In February 2013, the Mobile Airport Authority filed an application with the Federal Aviation Administration
to garner a small stipend intended for continued development and rehabilitation for the airport. Part of that
involved the rehabilitation of a single 1,740 long, 132 diameter culvert that ran under Runway 14/32.
Given the location, replacement was completely out of the question. The Airport did not want to have to shut
down operations while construction was underway. Ultimately, they turned to a 120 diameter DuroMaxx速 steel
reinforced polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to slipline into the existing
culvert.
損損Mobile, Alabama
損損1500 LF of 120 DuroMaxx速 SRPE
損損Installation date March 2014
NOvember 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Veterans Day
Thanksgiving Day
oct 2015
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
dec 2015
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
STEEL REINFORCED PE TECHNOLOGY
Daylight Savings Ends Election Day
Photo courtesy of Chris Wisehart Indiana Reline, Inc.
13. Bridges 損 U.S. Bridge速 Vehicular Truss
Main Street over Murrieta Creek
The city of Temecula needed to replace an obsolete bridge with a new structure that would serve as a
centerpiece for the community and also improve pedestrian safety. A weathering steel, Cambridge style, U.S.
Bridge truss was chosen as the replacement. The new bridge includes 9 8 wide sidewalks on both sides,
with pedestrian viewpoints overlooking the creek. The new structure is compatible with the Murrieta Creek
Restoration and Flood Control improvements proposed by U.S. Army Corps of Engineers and the Riverside
County Flood Control and Water Conservation District.
損損Old Town Temecula, California
損損U.S. Bridge速 Cambridge truss
損損28 width x 152 span, two-lane bridge
損損Installation date May 2014
December 2015
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5
6 7 8 9 10 11 12
Hanukkah Begins
13 14 15 16 17 18 19
Hanukkah Ends
20 21 22 23 24 25 26
Christmas Eve Christmas Day
27 28 29 30 31
New Year's Eve
nov 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
jan 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
ENGINEERED SOLUTIONS
800-338-1122 | www.ContechES.com/calendar ENGINEERED SOLUTIONS
MARKETS SERVED
Agriculture / Irrigation
Airports / Ports / Railway
Commercial / Industrial / Residential
DOT / Roads
Energy / Mining / Natural Resources
Government / Institutional
Military
Recreation / Parks / Golf Courses
Rehabilitation / Relining
Solutions Provided
Bridges & Structures
Erosion Control
Pipe
Retaining Walls
Stormwater Management
Wastewater Treatment
息 2014 Contech Engineered Solutions LLC
ENGINEERED SOLUTIONS
Winter Solstice