Interested in obtaining a hard copy to hang up in the office, showcasing a project Contech may have helped you out with? Please contact your local Contech representative, and they will be happy to drop one by!
1 of 13
Download to read offline
More Related Content
2017 Contech Calendar
1. 2 0 1 7
C O N T E C H C A L E N D A R
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
D E C E M B E R | 2 0 1 6
2. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J A N U A RY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS 損
TRANSMISSION LINE SYSTEM
IMPROVEMENT
PIPE SOLUTIONS
DECEMBER 2016
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
FEBRUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
NEWYEARS DAY
MARTIN LUTHER
KING DAY
Reynolds, Indiana
HEL-COR速
CMP, 12 GA, 5x1 with
MOBILE PIPE速
Mill
4,400 LF of 92-in. through 116-in.
Installation Date: July 2016
Utilizing the MOBILE PIPE mill to manufacture the
pipe needed for caissons to stabilize utility poles, the
contractor was able to avoid freighting and unloading
any truckloads of pipe. A dedicated Contech crew
travels with the mill to efficiently manufacture quality
pipe for every job.
3. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
F E B R U A RY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
STRUCTURES SOLUTIONS 損
WEST DOWLING ROAD
EXTENSION PHASE II
JANUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
MARCH 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
PRESIDENTS DAY
VALENTINES DAY
Anchorage, Alaska
BridgeCor速
Structural Plate
50-1 span x 27 rise x 155 length
Installation Date: July 2015
As the best solution, a 50-1 x 27 BridgeCor
Structural Plate, 155 in length, was selected and
installed. The BridgeCor structure was more cost
effective than a traditional girder bridge. Its ease of
installation was a plus on the curved, super elevated
road over the structure.
4. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M A R C H 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
STORMWATER SOLUTIONS 損
Villanova, Pennsylvania
Villanova University constructed a large garage to
increase parking capacity for a nearby stadium. A
treatment train consisting of a Vortechs hydrodynamic
separator, a Terre Arch concrete detention system,
and a Jellyfish Filter were selected to effectively treat
stormwater in a compact system with a small footprint.
12 dia. Jellyfish速
Filter with 18 high flow
cartridges & 4 drain down cartridges
Also Included: Terre Arch
Detention &
Vortechs速
Hydrodynamic Separator
Installation Date: March 2016
VILLANOVA UNIVERSITY
PIKE FIELD GARAGE
Filter
FEBRUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
APRIL 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
ST. PATRICKS DAY
SPRING EQUINOX
DAYLIGHT SAVINGTIME
BEGINS
5. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A P R I L 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
STRUCTURES SOLUTIONS 損
Ocala, Florida
On Top of the World Community is a premier 55+
active adult community in Ocala, Florida; known for its
dedication to quality. When looking for a solution for a
bridge overpass, the developers passion for creativity
in development and excellence in home building made
Keystone Stonegate Country Manor the right choice.
Keystone Retaining Wall Systems速
Stonegate速
Country Manor速
1,000 SF
Installation Date: July 2014
ONTOP OFTHE WORLD
HOME COMMUNITY
MARCH 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
MAY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
TAX DAY EARTH DAY
GOOD FRIDAY
EASTER SUNDAY
6. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M AY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
PIPE SOLUTIONS 損
Westminster, Colorado
A reinforced concrete pipe (RCP) draining Karens Pond and
running below Pecos Street was showing signs of distress in
the deep cover situation. The structural cracks along the
invert and crown of the RCP meant it needed to be replaced
or relined. DuroMaxx Steel Reinforced Polyethylene (SRPE)
pipe was selected to slip line the RCP for its ability to carry
the entire load without any contribution from the failing RCP.
DuroMaxx速
SRPE Liner Pipe
168 LF of 54-in.
Installation Date: August 2016
PECOS STREET CULVERT
IMPROVEMENT
STEEL REINFORCED PE TECHNOLOGY
APRIL 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
JUNE 2017
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
MEMORIAL DAY
MOTHERS DAY
PIPE SOLUTIONS
7. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U N E 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
STRUCTURES SOLUTIONS 損
Mesquite, Nevada
Originally designed as a two-span girder bridge, the
Exit 118 project allowed alternative conceptual designs
to be submitted for approval. Working closely with the
design team, Contech proposed twin BEBO arches for
the project. Garnering enthusiastic reviews from the
city, the proposal was accepted.
BEBO速
Precast Bridge System
E-Series
78 twin spans x 27-10 rise x 152 length
Installation Date: July 2016
EXIT 118 INTERCHANGE
EXPANSION
MAY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
JULY 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
FATHERS DAY SUMMER SOLSTICE
8. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U LY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
STORMWATER SOLUTIONS 損
Tacoma, Washington
This innovative facility provides treatment for 754 acres
in a footprint of only 5,550 square feet using a series
of cascade pools, distribution channels, and Filterra
treatment cells. The system can treat up to eight
million gallons of stormwater per day; capturing the
worst pollutants from entering Puget Sound.
Filterra速
Bioscape with 5,550 SF of
Filterra media, a CDS速
hydrodynamic
separator for pretreatment, and
StormGate速
high flow bypass structure
Installation Date: December 2015
POINT DEFIANCE REGIONAL
TREATMENT RETROFIT
速
JUNE 2017
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
AUGUST 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
INDEPENDENCE DAY
9. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A U G U S T 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
PIPE SOLUTIONS 損
Houston, Texas
Improvements to the terminal area at the George
Bush Intercontinental Airport included storm water
and surface water drainage and treatment. Contech
Slotted Drain with CDS速
pretreatment was selected as
the optimal solution providing a practical, aesthetically
pleasing system.
Contech Slotted Drain and CDS速
Pretreatment (3 - 10 units)
1,980 LF of 24-in. Slotted Drain
Installation Date: October 2016
IAH AIRPORTTERMINAL C
IMPROVEMENTS
PIPE SOLUTIONS
JULY 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
SEPTEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
10. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
S E P T E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
STRUCTURES SOLUTIONS 損
Columbia, South Carolina
This Continental Pedestrian Truss bridge spans over an
active rail line that was previously posing a serious safety
concern to the general public visiting the zoo. Trains
utilized this route multiple times a day traveling at high
rates of speed. The beautifully designed bridge now
safely links the parking lot directly to the remodeled zoo.
Continental速
Pedestrian Truss Bridge
Keystone速
style
115 span x 12 width
Installation Date: May 2016
RIVERBANKS ZOO
PEDESTRIAN CROSSWALK
AUGUST 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
OCTOBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
LABOR DAY
FALL EQUINOX
11. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
O C TO B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS 損
Monmouth, Oregon
The Monmouth Main Street Park uses an UrbanGreen
Rainwater Harvesting System to collect water from
a splash pad which is then filtered, stored, and
disinfected before being used for spray irrigation of the
park grass and landscaping. The system is saving the
City hundreds of thousands of gallons of potable water.
UrbanGreen速
Rainwater Harvesting
System with a 20,000 gal. SRPE Tank,
mechanical system, and a CDS速
hydrodynamic separator for pretreatment
Installation Date: May 2016
CITY OF MONMOUTH
MAIN STREET PARK
Stormwater Solutions from Contech速
SEPTEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
NOVEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
COLUMBUS DAY
12. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
N OV E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
STRUCTURES SOLUTIONS 損
Lewiston, Idaho
The Spalding Bridge Scour Repair Project, winner of the
AASHTO Presidents Transportation Award, was rated
among the top 10 most scour-critical bridges in the
state. Several piers of the 1,200-ft bridge built in 1962
were in danger of undermining. A-Jacks concrete armor
units were installed in high flowing water conditions to
stabilize the piers without needing to dewater or divert
the river while protecting the sensitive habitat.
A-Jacks速
Concrete Armor Units
14,982 24-in. units
Installation Date: July 2015
SPALDING BRIDGE SCOUR
MITIGATION PROJECT
OCTOBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
DECEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
VETERANS DAY
DAYLIGHT SAVINGTIME
ENDS
THANKSGIVING
WINNER OF THE
PRESIDENTS AWARD
13. SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 31 25 26 27 28 29 30
9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069
Bridges & Structures
Erosion Control
Pipe
Retaining Walls
Stormwater Management
息 2016 Contech Engineered Solutions LLC
ENGINEERED SOLUTIONS
D E C E M B E R 2 0 1 7
ENGINEERED SOLUTIONS
COMPLETE SITE SOLUTIONS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER SOLUTIONS 損
Jalisco, Mexico
The local regulating water authority requires new
developments to retain their stormwater on site. This
helps control flooding in the area due to the increased
runoff that the existing infrastructure can no longer
handle. Contech provided the most cost-effective
solution through the use of 2 perforated CMP systems.
Contech CMP Infiltration System
System 1 - 814 LF of 72 and 78 CMP
System 2 - 715 LF of 78 and 84 CMP
Installation Date: June 2016
ELEMENT RESIDENTIAL
DEVELOPMENT
NOVEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
JANUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
WINTER SOLSTICE
CHRISTMAS DAY
CHRISTMAS
EVE
NEW YEARS
EVE